2012, 07-26 Permit App: APR-2012-0045 ApproachSpokane
_FValley°
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenter sDoka nevallev. orci
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
APR -?Alit-es qS
APPROACH PERMIT APPLICATION
PROJECT ADDRESS: /O/r A• lc>4tS
START DATE: IL /y 20/1 ANTICIPATED COMPLETION DATE: 20/2-
BUILDING OWNER NAME: 07 c de /16642 /fey
MAILING ADDRESS:
CITY: 6pok t C /(C STATE: (-4-)14 ZIP:
„situ deaq,"
PHONE: %5i{ 17471767
•- FAX:
CONTACT PERSON NAME:
CELL:
CONTRACTOR NAME: _1;14u cQ ,614(7//
MAILING ADDRESS: 5/// G . GJ✓Da ckOce.,
r
CITY:poIC4Oct (l/cy 'STATE: LC/ 2 ZIP: ?22- -331s4
PHONE: ( 77C-;;-"-7672 , 7L1-6S7)AX: 6-36 -3057 CELL.
CONTRACTOR LICENSE No.:.'iOU44J4L98' A EXPIRES:
CITY BUSINESS LICENSE NO.:
/006 Slq-
0
PROJECT DESCRIPTION (Please Provide Site Sketch)
Residential Driveway 4'; Commercial/Industrial Driveway
Existing Curb & Gutter
Culvert Installation
Other Conditions:
Rural Road Section
Q Sidewalk Repair/Construction
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done In full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) the City of
Spokane Valley permit is not permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
Information may be required too e submitted and subsequaptly approved before this application can be processed.
Signature
Date: '
Updated 1-11-11 Page 1 of 1
http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Approach_Permit_1-11-11.doc
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
❑ Sidewalk
ft wide
_ ft from back of curb
❑ Streetside Swale
❑ Drainage Ditch
❑ Drywell (show location on sketch)
❑ Other (please describe below)
Lu'
z'
7'
Y I
wl
CURB'
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
1FT (SEE TABLE)
CONCRETE
APPROACH
THROAT WIDTH EIFT 4' I
WING (SEE TABLE) WING
STREET NAME
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
ASPHALT
APPROACH
CURB
RETURN
\'1
\1F CORNER LOT,
DISTANCE FROM
CURB RETURN
nFT(SEE TABLE)
15'RADIUS RADIUS
RETURN
EDGE OF 1
ASPHALT
1 -----THROAT WIDTH 1-1FT
(SEE TABLE)
STREET NAME
,Q4, f-5
STREET WITH ASPHALT EDGE
J
l'NNIF CORNER LOT,
DISTANCE FROM
RADIUS RETURN
f I FT (SEE TABLE)
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
Residential Approaches
Commercial Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured
from centerline to centerline of each
approach)
None specified
See Page 7-27
in City Street Standards
Throat Width (flat portion)
16' min., 30' max.
4 feet typical
5.0'
30' min. 40' max.
4 feet typical
5.0'
Wing Width (at curb line)
Minimum Distance from Side Property Line
(@ r/w)
Minimum Distance from Crosswalk
5' � 5'