Loading...
2003, 12-04 Permit: 03008623 SewerSPOKAE Ccxm rr SPOKANE COUNTY DIVISION OF BUILDING. AND CODE ENFORCEMENT 1026 WEST BROADWAY AvENrUE • SPOKANE, WA 99260-0050 Site Information Project Information Site Address: 1018 N BATES RD SPOKANE, WA 99216 Parcel Number: 45161.0812 Subdivision: REGOS ADD Block: Lot: Zoning: UNK Unknown Owner: DEVANEY, STEVE Address: 1018 N BATES RD SPOKANE, WA 99216 Building Inspector: BOBBY STONE Water Dist: Project Number: 03008623 Inv: 1 Issue Date: 12/4/2003 Permit Use: SEWER CONNECTION - HILLVIEW ACRES Applicant: COURCHAINE CONSTRUCTION 19818 E SPRAGUE GREENACRES, WA 99016 Contact: COURCHAINE CONSTRUCTION 19818 E SPRAGUE GREENACRES, WA 99016 Setbacks - Front: Group Name: Project Name: Left: Right: Phone: (509) 924-5485 Phone: (509) 924-5485 Rear: Permits i Sewer Connection Permit Contractor: COURCHAINE CONSTRUCTION License #: COURCC*181R7 SEWER CONNECTION 1 885.00 PROCESSING FEE Total Permit Fee: FOR SEWER INSPECTIONS CALL (509) 477-3604 UTILITIES 8 30-5:06 PM MONDAY THRU FRIDAY Call for inspection prior to cover. ONE WORKING DAY NOTICE REQUIRED. Contractor or applicant is to field locate and confirm the elevatioff nd position of sewer stub prior to any other excavation. Sewer stubs are to be checked prior to connection to ensure that the have acceptable grade and arc clear and unobstructed to the main sewer. Sewer lines should be constructed to allow for gravity flow fromlhe lowest level of the structure. This permit must be presented to the job site inspector for verification. To locate buried cables, gas piping, water lines, etc. CALL BEFORE YOU DIG, (509)456-8000.; jir <Ect'i�i1' STATE LAW RCW 19.122 REQUIRES THAT PRIOR TO ANY EXCAVATION THE "CALL BEFORE YOU DIG" CENTER BE NOTIIIED. CALL BEFORE YOU DIG AT LEAST 2 WORKING'DAYS IN'ADVANCE, (509)456-8000. Spokane County Code requires the installer comply.wtth all requiremeWts'of the Washington State Dept of Labor and Industries, including those related to trench safety. $15.00 8100 00 Payment Summary_',-, Total Fees AmountPaid AmountOwing $100.00 $100.00 $0 00 Tran Date Receipt # Pt ment-Amt 12/4/2003 Processed By: SHATTO, JULIE Printed By: HINTZ, FAITH Page 1 of 1 7599 $100 00 PERMIT FI LE NOTICE It is the responsibility of the applicant/permittee, not Spokane County, to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code 1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes NOTE: This inspection includes review of the structure's setbacks from property lines Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of- way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense 2 FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3 FRAMING - after all framing, bracing and blocking is in place, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5 PLUMBING - after rough -in, before covering, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be com- pleted pnor to final approval of a building or issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy, completed inspection record card must be available on site. 9. SEWERS - prior to cover 10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc , must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire inspections, Division of Building and Code Enforcement 477-3675 • Construction in a flood plain, Division of Engineering & Roads 477-3600 • Electrical wiring, State Department of Labor and Industries 324-2640 • On-site waste disposal system, Spokane Regional Health District 324-1560 • Road cuts for utilities or driveways, Division of Engineering & Roads - 48-HOUR NOTICE REQUIRED 477-3600 or State Department of Transportation 456-3000 • Sewer connection, Division of Utilities 477-3604 or City Public Works Department 625-6300 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions All refund requests must be made in writing by the applicanVpermittee (shown on the reverse) no later than 180 days after the date of fee payment. Refunds of not more than 80% of the permit fee paid may be authonzed when no work has been done under the permit No refunds may be authorized more than 180 days after fee payment. MISTAKE? If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a wntten request for correction within 10 working days of discovery All such requests should be directed to the Division of Building and Code Enforcement at the below address. Spokane County Division of Building & Code Enforcement 1026 ioka e,BAw99 Avenue Spokane, WA99260 Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133