Loading...
2012, 08-13 Permit: SW-12001961 SewerSPOKANE COUNTY BUILDING AND.PLANNING PERMIT Application Number: SW -12001961 Permit Issued Date: 08/13/2012 Expiration Date: 08/14/2012 Project Description: SEWER CONNECTION Project Name: MICAVIEW PH 1 Permit Type: SEWER Primary Contact: BOUCHER CONSTRUCTION LLC Applicant. BOUCHER CONSTRUCTION LLC Address: 10 N HARMONY RD GREENACRES, WA 99016 Phone: 509-953-3274 Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description Inspection Area: 623 S BARKER RD 55202.0263 CORBIN ADDITION CORBIN ADD TO GREENACRES N191.25FT OF S382.5FT OF LT 9 BLK 22... Water District: Consolidated Irrigation District #19 Zoning: Land Area: 59038 Square Feet Owner: Address: Phone: Email: HEUGHINS, ROY A & EILEEN R 623 S BARKER RD SPOKANE VALLEY, WA 99016-8781 Fire District: Spokane Valley Fire CONTRACTOR INFORMATION: General Contractor BOUCHC`954P5 BOUCHER CONSTRUCTION LLC 10 N HARMONY RD GREENACRES, WA 99016 509-953-3274 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed 08/13/2012 11'35:17 Printed by: 115 APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001961 08/13/2012 Expiration Date: 08/14/2012 FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8.30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 08/13/2012 11:35 17 Printed by IIS APPPOODASP.NET v4.0