Loading...
1975, 11-19 Permit App: L2431 ResidenceOJOB # a67 County of Spokane, Washington BUILDING CODES DEPARTMENT, N. 811 JEFFERSON, SPOKANE, WASHINGTON 99201 APPLICATION FOR LAND USE OR STRUCTURE PERMIT • GENERAL REQUIREMENTS PERMIT FEE $27.00 PERMIT REQUIRED. A land use or structure permit is required by County Resolution to erect a building or structure of any 'kind or alter any building or structure already erected, or to change a land use: Construction mast conform with the Spokane County Building Code and Zoning Ordinance. Construction is subject to inspection. WATER'. Water supply must be approved by the County and State Health Departments. Where work on water connections disturbs the surface,' shoulders or ditches of County Roads, permission must be obtained from the County Engineer's Office. SEWAGE SYSTEM. Permits are required in all cases by County Resolutions Nos. 45-133 and 47.235. - SET -SACK FROM PROPERTY LINES. 'In most zones and under most circumstances, a set -back from the front. property line, of at least 25' is required, a 5' side yard, 15' side yard from a flanking street, and a 25' rear yard are required. STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set -back and ingress and egress. COUNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and work must be Performed in accordance with stakes. Points of ingress and egress must be approved by the County Engineer. , MOVING OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County;ok State Highway, clearance must be obtained from the County Engineer and/or State Highway Department. ACCESSOF,� BUILDINGS. Accessory buildings (garages, sheds, etc.) require a separate permit. RESTRIC IVE COVENANTS. Builders should -check provisions of covenants or dedications and easements running with the land which a e enforceable through civil action. County Officials can not bring action to enforce covenants or dedications. APPLICANT FILL IN BELOW THIS LINE Name of Owner _ KAPPEN CONSTR. INC. Address 2312 N. Pines Rd. Phone 928-8660 Architect ' Address Phone Engineer Address Phone Contractor _ KAPPEN CONSTR. INC. Address 2312 N. Pines Rd. 99206hone 928-8660 Legal Description of Property (Give complete description from deed, tax redeipt etc ) N. 75 of the S.. 225' of Lot 5, Block 14. Hutchinson's Addition located in the N. % of Sec. 18, T. 25N, R. 44 EWM /8 cw - /5o5 • DESCRIPTION OF WORK: New x Addition Remodel Moving Bldg. Zone / Fire Zone 3 size of Lot _75'x124' Sewage System ,Septi r Const. FTsme t (Fr., Conc.,,,_Br}. etc.) Stories 1 oimensions 25x36 Total Sq Ft 891 valuation 7S,g n-00 Rooms 5 Baths 1 Basement- full Foundation Const concrete Chimne;lone Fireplace TI [)nP (Full art, none) (Kind) (Number Heat. System Elect. of Roofing comp. Ext Finish Wood Int Wall Finish gyp bd. Use of Bldg. single family dw,plling In ---V No of Units JBedrooms 2 PLOT PLAN Draw sketch with dimensions Showing: (1) property lines; (2) street or road locations; (3) location of existing and proposed buildings; (4) distance to property lines and streets; (5) dimensions of buildings; (6) location of sewage sys- tem and water supply lines. 0 NORTH RESIDENTIAL — COMMERCIAL See attached plot plan I hereby cer 'fy in as shown. I SOUTH ed is correct and there are no other structures located on this property except State License No. Ind. Ins. Acct. No. REQUIRED Plumbing Permit w Heating Permit Sewage Permit ti Plans Received Plans Checked Plans Returned Plans Picked Up Plans Mailed %./.,'_ti Nov. 1-9, 1975 Owner or Agent Date A LAND USE OR STRUCTURE PERMIT MUST BE ON THE PREMISES BEFORE CONSTRUCTION COMMENCES. THIS IS NOT A PERMIT. (g,),,, 3fat`@? DO NOT WRITE BELOW THIS LINE Your street address will be R. 9/0 S .4.4,, Q,The zone is (q7 �i;C Sewage Permit NumberIssued Building Permit / �/�?/ Receipt t - 6 6 Issued Remarks ` i Form 523 Bldg. Code r--- KAPPEN CONSTRUCTION, INC. Spokane, Washington 99216 4111N1.11111111 i)40660 HEALTH DIST. E•LOV 13 1975 PLOT PLAN a•.., ,` , c� Requested Price 0,> 955, 0 Lot Cost -51'.7.3>;0(Y. 4, 2.0 ENV. HEALTH F.H.A. APPROVAL ONLY, SPO. GO, HEALTH DIST. ELEVATIOiS: Crown of Streetti,s, b - Finish Floor ISS Leat ferlg .....„,,, t.4 \ . ._,c.) \,... epv- 4,0 ,4,. �� ,\ ,— , I` ,_ _ LoT G FOr: C/\RL KAPPEN iI3VILDING PERMIT ONLY Basic: /9/ Sg. Ft., 97 FHA Case # Job # 11/-,1 Mortgage Co. C'o�,, r,��� Power Co. Water Co. Excavator 4 1 N LEGAL DESCRIPTION THE NORTH 7± FE r—r OF THE SOUTH 225 FEET OF LOT 5, BLOCK 14 NUTCHlNSONS ADDITION LOCATED IN THE N.-1- OF SEC. I8 T 25 R. R. X�44 E,W. A. BY C-La,n,C.a- CLARENCE E.SiMP'50N EI\`GINEERS, INC, N. 909ARG0NI4E ROAD SPOKANE , WASHINGTON 926-1322 9920Q' Scale: e' / o /77 , / U'Q Ste, -',.z , . / / ('„ d/�