2014, 05-21 Permit App: APR-2014-0033 Approach- Spok'ane
jValleys
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenteresookaneva Iley.orq
(Staff Use Onl )
PERMIT NUMBE •'
PERMIT FEE:
1
t
APPROACH PERMIT APPLICATION
PROJECT ADDRESS:
START DATE: /j ZZ r /
BUILDING OWNER NAME:
+s -a-4 O 33
ANTICIPATED COMPLETION DATE: G' - C3 . /
MAILING ADDRESS:
CITY: STATE:
CONTACT PERSON NAME:
PHONE:
CONTRACTOR NAME: 6/1 p rj
ZIP:
FAX:
nrniect `t—CEL'L:j.v g,)
„i \ Ci z f ,LC -C "A1- . _..
MAILING ADDRESS:
MAY Li cu,
CITY:
PHONE:
CONTRACTOR LICENSE No.:
STATE:
FAX:
ZIP:.
PERM "
CELL: 9,,k -v'
cIIB#L.--..�.e..
EXPIRES: i 'CITY BUSINES LICENSE NO.:
Er
lJ
PROJECT DESCRIPTION (Please Provide Site Sketch)
Residential Driveway EJ Commercial/Industrial Driveway
Existing Curb & Gutter
Culvert Installation
Other Conditions:
Q Rural Road Section
El Sidewalk Repair/Construction
Bond/Insurance certification must be on file with the City.
DISCLAIMER •
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for construction or on a dwelling, the dwelling Is/will
be served by potable water. 2) Ownership of this CIty of Spokane Valley permit inure to the property owner. 3) The signatory Is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the CIty of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit Is not a ermit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may b required to e submit d and subsegyentry approved before this application can be processed.
Signature
Date:
Updated 1-11-11 Page 1 of 1
http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Approach_Permit_1-11-11.doc
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required nieasurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
❑ Sidewalk
ft wide
_ ft from back of curb
❑ Streetside Swale
❑ Drainage Ditch
❑ Drywell (show location on sketch)
O Other (please describe below)
DISTANCE FROM
NEAREST PROPERTY LINE
(MA,Y�BE LEFT OR RIGHT SIDE)
I e FT (SEE TABLE)
CONCRETE
APPROACH
CURB
RETURN
CURB/
zI
n
w
0
a
EDGE OF
ASPHALT
k4• 1 THROATWIDTH®FT 4'
WING (SEE TABLE) WINO
STREET NAME
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
ASPHALT
APPROACH
IF CORNER LOT,
DISTANCE FROM
CURB RETURN
in FT (SEE TABLE)
I--THROATWIDTH In FT - I
(SEE TABLE)
STREET MME
STREET WITH ASPHALT EDGE
RADIUS
RETURN
NIF CORNER LOT,
DISTANCE FROM
RADIUS RETURN
FT (SEE TABLE)
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
Residential Approaches
Commercial Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured
from centerline to centerline of each
approach)
None specified
See Page 7-27
in City Street Standards
Throat Width (flat portion)
16' min., 30' max.
30' min., 40' max.
Wing Width (at curb line)
4 feet typical
4 feet typical
Minimum Distance from Side Property Line
(@ r/w)
5.0'
5.0'
Minimum Distance from Crosswalk
5'
5'