Loading...
2014, 05-21 Permit App: APR-2014-0033 Approach- Spok'ane jValleys Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenteresookaneva Iley.orq (Staff Use Onl ) PERMIT NUMBE •' PERMIT FEE: 1 t APPROACH PERMIT APPLICATION PROJECT ADDRESS: START DATE: /j ZZ r / BUILDING OWNER NAME: +s -a-4 O 33 ANTICIPATED COMPLETION DATE: G' - C3 . / MAILING ADDRESS: CITY: STATE: CONTACT PERSON NAME: PHONE: CONTRACTOR NAME: 6/1 p rj ZIP: FAX: nrniect `t—CEL'L:j.v g,) „i \ Ci z f ,LC -C "A1- . _.. MAILING ADDRESS: MAY Li cu, CITY: PHONE: CONTRACTOR LICENSE No.: STATE: FAX: ZIP:. PERM " CELL: 9,,k -v' cIIB#L.--..�.e.. EXPIRES: i 'CITY BUSINES LICENSE NO.: Er lJ PROJECT DESCRIPTION (Please Provide Site Sketch) Residential Driveway EJ Commercial/Industrial Driveway Existing Curb & Gutter Culvert Installation Other Conditions: Q Rural Road Section El Sidewalk Repair/Construction Bond/Insurance certification must be on file with the City. DISCLAIMER • The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for construction or on a dwelling, the dwelling Is/will be served by potable water. 2) Ownership of this CIty of Spokane Valley permit inure to the property owner. 3) The signatory Is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the CIty of Spokane Valley Permit Center. 5) The City of Spokane Valley permit Is not a ermit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may b required to e submit d and subsegyentry approved before this application can be processed. Signature Date: Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Approach_Permit_1-11-11.doc APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required nieasurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑ Sidewalk ft wide _ ft from back of curb ❑ Streetside Swale ❑ Drainage Ditch ❑ Drywell (show location on sketch) O Other (please describe below) DISTANCE FROM NEAREST PROPERTY LINE (MA,Y�BE LEFT OR RIGHT SIDE) I e FT (SEE TABLE) CONCRETE APPROACH CURB RETURN CURB/ zI n w 0 a EDGE OF ASPHALT k4• 1 THROATWIDTH®FT 4' WING (SEE TABLE) WINO STREET NAME STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) ASPHALT APPROACH IF CORNER LOT, DISTANCE FROM CURB RETURN in FT (SEE TABLE) I--THROATWIDTH In FT - I (SEE TABLE) STREET MME STREET WITH ASPHALT EDGE RADIUS RETURN NIF CORNER LOT, DISTANCE FROM RADIUS RETURN FT (SEE TABLE) Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5'