Loading...
2013, 12-23 Permit: SW-13002157 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13002157 Permit Issued Date: 12/23/2013 Expiration Date: 12/23/2014 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION WATKINS ADD HOMESTEAD CONSTRUCTION Applicant: HOMESTEAD CONSTRUCTION Address- 312 S FARR RD SPOKANE VALLEY, WA 99206 Phone: Email: SITE INFORMATION: Site Address: Parcel Number: Assessor's Description Inspection Area Zoning: 4028 S BATES RD 45334.0620 WATKINS ADD (AFN 5416740) LT 20 BLK 2 :(509)-477-3675 Owner: HOMESTEAD CONSTRUCTION Address: 312 S FARR RD SPOKANE VALLEY, WA 99206 Phone: Email: Water District: Fire District. Spokane Valley Fire Land Area: 6309 Square Feet CONTRACTOR INFORMATION: FOLSOEI994D0, Exp. 04/20/2014 FOLSOM.EXCAVATING 16701 E VALLEYWAY AVE VERADALE,-WA 99037 509-891-1232. DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.32 $125.00 $151.32 $125.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5'00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS.FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. Date Printed: 12/23/2013 09 30'37 Project Coordinator. Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13002157 Permit Issued Date: 12/23/2013 Expiration Date: 12/23/2014 SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY.HAVE _. .. ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _ ... THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed 12/23/2013 09 30'37 Project Coordinator: Kathy Cummings