HomeMy WebLinkAbout1976, 03-12 Permit App: L2950 ResidenceCti,,rify of Spokane, WcisLiigfon
BUILDING CODES DEPARTMENT, N. 811 JEFFERSON, SPOKANE, WASHINGTON 99201
APPLICATION FOR LAND USE OR STRUCTURE PERMIT
GENERAL REQUIREMENTS PERMIT FEE
PERMIT REQUIRED. A land use or structure permit is required by County Resolution to erect a building or structure of any
kind or alter any building or structure already erected, or to change a land use. Construction mast conform with the
Spokane County Building Code and Zoning Ordinance. Construction is subject to inspection.
WATER. Water supply must be approved by the County and State Health Departments. Where work on water connections disturbs
the surface, shoulders or ditches of County Roads, permission must be obtained from the County Engineer's Office.
SEWAGE SYSTEM. Permits are required in all cases by County Resolutions Nos. 45-133 and 47.235.
SET -BACK FROM PROPERTY LINES. In most zones and under most circumstances, a set -back from the front property line, of at
least 25' is required, a 5' side yard, 15' side yard from a flanking street, and a 25' rear yard are required.
STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set -back and ingress
and egress.
COUNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and work must be
perfo med in accordance with stakes. Points of ingress and egress must be approved by the County Engineer, .
MOVIN4 OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County or State
Highw y, clearance must be obtained from the County Engineer and/or State Highway Department.
ACCES4ORY BUILDINGS. Accessory buildings (garages, sheds, etc.) require a separate permit.
'RESTRICTIVE COVENA.NTS. Builders should check provisions of covenants or dedications and easements running with the land
which are enforceable through civil action. County Officials can not bring action to enforce covenants or dedlcattons.
7
1, APP (CNT FILL IN BELOW THIS LINE c
Name of Owner ` �U l C '-P./ :,47 �/ Address / 0 8. it 4. cl.& C..-�I Phone
Architect
Address /~ ?�f �fl G Phone
En. neer Address Phone
\ ��-r-✓"�" Address6,1 Phone
Con
— 02 -��{ — 3 --
LeA Description of Property -y, (Give complete descr'ptiqn from deed, tax receipt, etc 1
DESCRIPTION OF WORK: New r Addition _ Remodel Moving Bid.t Zone
Size of,. yof 6 U 0/ G } % Sewage System
Stolies�`-'I[ Dimensions j-. 6 1� 3 !� r + 4 t l �'` a' a a' Total Sq. Ft,
Rooms Baths ��, Basementsem . Foundation Const
tFull, part, non 1 t✓� %j
Type of Roofing �•[` E
at. Systetl
Use of Bldg.
Fire one
ust.
F., C c., Br., etc.) ;
Valuation 10'y -s. 1_6U
Chimney Fireplace r�J
(Number
(Kind(
Ext. Finish G Int. Wall Finish
No. of Units, Bedrooms
PLOT PLAN C.6
Draw sketch with dimensions showing: (1) property lines; (2) street or road locations; (3) location of existing and
proposed buildings; (4) distance to property lines and streets; (5) dimensions of buildings; (6) location of sewage sys-
tem and water supply lines.
NORTH
RESIDENTIAL — COMMERCIAL
SOUTH
I hereby certify inforl.: on submitted is correct and there are no other structures located on this property except
shown.
Ind. InI. ct.
REQ�JI�ED
Plumbing Permit (�T2
'"'�
ns Heating Permit
HSewage Permit
w.
Plans Received
Plans Checked
Plans Returned
Plans Picked U
Plans Mailed,
{ Owner—or Agent
A LAND USE OR STRUCTURE PERMIT MUST BE ON THE PREMISES BEFORE CONSTRUCTION COMMENCES.
THIS IS NOT A PERMIT.
-741_,-x-4_ DO NOT WRITE BELOW THIS LINE
Yrr street address will be 6r1 -1u1 The zone isa-
' sewage Permit Number Issued Building Permit „II:3 U Receipt Q ' Issued +�
Reeh s
Date
Form 523 Bldg, Code
L.
Chapco Certified Construction
10811 E. 26th
Spokane, Wash. 99206
JOB N0, 21
LEGAL DESCRIPTION: Lot. 3, Block. 3, Myron Estates ]
(
0
/00
ti
1
1
•
4.
•
I'