Loading...
HomeMy WebLinkAbout1976, 03-12 Permit App: L2950 ResidenceCti,,rify of Spokane, WcisLiigfon BUILDING CODES DEPARTMENT, N. 811 JEFFERSON, SPOKANE, WASHINGTON 99201 APPLICATION FOR LAND USE OR STRUCTURE PERMIT GENERAL REQUIREMENTS PERMIT FEE PERMIT REQUIRED. A land use or structure permit is required by County Resolution to erect a building or structure of any kind or alter any building or structure already erected, or to change a land use. Construction mast conform with the Spokane County Building Code and Zoning Ordinance. Construction is subject to inspection. WATER. Water supply must be approved by the County and State Health Departments. Where work on water connections disturbs the surface, shoulders or ditches of County Roads, permission must be obtained from the County Engineer's Office. SEWAGE SYSTEM. Permits are required in all cases by County Resolutions Nos. 45-133 and 47.235. SET -BACK FROM PROPERTY LINES. In most zones and under most circumstances, a set -back from the front property line, of at least 25' is required, a 5' side yard, 15' side yard from a flanking street, and a 25' rear yard are required. STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set -back and ingress and egress. COUNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and work must be perfo med in accordance with stakes. Points of ingress and egress must be approved by the County Engineer, . MOVIN4 OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County or State Highw y, clearance must be obtained from the County Engineer and/or State Highway Department. ACCES4ORY BUILDINGS. Accessory buildings (garages, sheds, etc.) require a separate permit. 'RESTRICTIVE COVENA.NTS. Builders should check provisions of covenants or dedications and easements running with the land which are enforceable through civil action. County Officials can not bring action to enforce covenants or dedlcattons. 7 1, APP (CNT FILL IN BELOW THIS LINE c Name of Owner ` �U l C '-P./ :,47 �/ Address / 0 8. it 4. cl.& C..-�I Phone Architect Address /~ ?�f �fl G Phone En. neer Address Phone \ ��-r-✓"�" Address6,1 Phone Con — 02 -��{ — 3 -- LeA Description of Property -y, (Give complete descr'ptiqn from deed, tax receipt, etc 1 DESCRIPTION OF WORK: New r Addition _ Remodel Moving Bid.t Zone Size of,. yof 6 U 0/ G } % Sewage System Stolies�`-'I[ Dimensions j-. 6 1� 3 !� r + 4 t l �'` a' a a' Total Sq. Ft, Rooms Baths ��, Basementsem . Foundation Const tFull, part, non 1 t✓� %j Type of Roofing �•[` E at. Systetl Use of Bldg. Fire one ust. F., C c., Br., etc.) ; Valuation 10'y -s. 1_6U Chimney Fireplace r�J (Number (Kind( Ext. Finish G Int. Wall Finish No. of Units, Bedrooms PLOT PLAN C.6 Draw sketch with dimensions showing: (1) property lines; (2) street or road locations; (3) location of existing and proposed buildings; (4) distance to property lines and streets; (5) dimensions of buildings; (6) location of sewage sys- tem and water supply lines. NORTH RESIDENTIAL — COMMERCIAL SOUTH I hereby certify inforl.: on submitted is correct and there are no other structures located on this property except shown. Ind. InI. ct. REQ�JI�ED Plumbing Permit (�T2 '"'� ns Heating Permit HSewage Permit w. Plans Received Plans Checked Plans Returned Plans Picked U Plans Mailed, { Owner—or Agent A LAND USE OR STRUCTURE PERMIT MUST BE ON THE PREMISES BEFORE CONSTRUCTION COMMENCES. THIS IS NOT A PERMIT. -741_,-x-4_ DO NOT WRITE BELOW THIS LINE Yrr street address will be 6r1 -1u1 The zone isa- ' sewage Permit Number Issued Building Permit „II:3 U Receipt Q ' Issued +� Reeh s Date Form 523 Bldg, Code L. Chapco Certified Construction 10811 E. 26th Spokane, Wash. 99206 JOB N0, 21 LEGAL DESCRIPTION: Lot. 3, Block. 3, Myron Estates ] ( 0 /00 ti 1 1 • 4. • I'