2012, 06-01 Permit: SW-12001461 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001461
Permit Issued Date:
06/01/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
GREEN HAVEN PHASE 2
SEWER
Primary Contact
Applicant:
Address:
Phone:
Email:
KALIN EXCAVATION
KALIN EXCAVATION
9229 E WOOLARD RD
COLBERT, WA 99005
509-954-9101
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description
Inspection Area:
Zoning:
408 N BELL ST
55183.1308
CORBIN ADDITION
ERRETS ADD L8 B2
Water District:
Consolidated Irrigation
District #19
Owner:
Address:
Phone'
Email:
BOYER, DAVID & KAREN
408 N BELL ST
GREENACRES, WA 99016-8550
Fire District: Fire District 1
Land Area' 0.2317 acres / 10094 sqft
CONTRACTOR INFORMATION:
General Contractor
KALI NE`0431B
KALIN EXCAVATION
9229 E WOOLARD RD
COLBERT, WA 99005
509-954-9101
DETAILS*
Class
Type
Quantity Unit Charge
Value
SEWER SEWER CONNECTION
FEE DETAIL.
Processing - Utilities
Utilities Permit
1
S125.00
S125.00
Total Fee:
S125.00
$25.94
$125 00
$150 94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed. 06/01/2012 09.04:22
Printed by: IIS APPPOOL'ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001461 1 06/01/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 06/01/2012 09:04:22
Printed by IIS APPPOOL1ASP.NET v4 0