2012, 06-15 Permit: SW-12001567 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001567
Permit Issued Date:
06/15/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
GREEN HAVEN PHASE II
SEWER
Primary Contact: KALIN EXCAVATION
Applicant: KALIN EXCAVATION
Address: 9229 E WOOLARD RD
COLBERT, WA 99005
Phone: 509-954-9101
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description
Inspection Area:
Zoning
415 N BELL ST
55183.1206
CORBIN ADDITION
ERRETS ADD L6 B1
Water District:
Consolidated Irrigation
District #19
Owner:
SMITH, RANDALL K & SHARI L
Address: 415 N BELL ST
GREENACRES, WA 99016-8550
Phone:
Email:
Fire District: Spokane Valley Fire
Land Area: 0.2547 acres / 11096 sqft
CONTRACTOR INFORMATION:
General Contractor
KALINE*04318
KALIN EXCAVATION
9229 E WOOLARD RD
COLBERT, WA 99005
509-954-9101
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
$125.00
Total Fee:
$25.94
$125.00
$150.94
CONDITIONS:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5.00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed: 06/15/2012 09:20:04
Printed by: IIS APPPOOLVISP.NET v4 0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001567 06/15/2012
Expiration Date:
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 06/15/2012 09:20:04
Printed by: IIS APPPOOL1ASP.NET v4.0