2008, 07-01 Permit: 08002254 Duplex*Wanes%
41 alley
BUILDING DIVISION
11703 E. Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Site Information Project Information
Site Address: 1316N
Parcel Number: 55182.1148
Subdivision:
Block:
Zoning: R-4
Owner: DIAMOND
Address: 2602
SPOKANE
Building Inspector: EAST
Water Dist: CONSOLIDATED
BELL RD
Lot:
SF Res Urban District
ROCK CONST
N SULLIVAN
VALLEY WA 99216
ID 1119
Project Number: 08002254 Inv: 1 Issue Date: 07/01/2008
Permit Use: NEW DUPLEX LT 3 BLK 3
Applicant: DIAMOND ROCK CONST
2602 N SULLIVAN
SPOKANE VALLEY WA 99216 Phone: (509) 924-8964
Contact: DIAMOND ROCK CONST
2602 N SULLIVAN
SPOKANE VALLEY WA 99216 Phone: (509) 924-8964
Setbacks - Front: Left: Right: Rear:
Group Name:
Project Name: LT 3 BLK 3/1316
IPermits
Building Permit
Contractor: DIAMOND ROCK CONSTRUCTION License #: DIAMORC0320Q
FOR BUILDING INSPECTIONS
1&2 FAMILY
COV DECK
GARAGE
Total Value:
CALL (509) 688-0054.
R-3 VB 1,982 RESIDENTIAL PERMIT FEE $1,542.55
R-3 VB 25 WSBC SURCHARGE $4.50
U -I VB 470 HOURLY REVIEW FEE 1 $58.00
$197,575 18 Total Permit Fee: $1,605.05
Mechanical Permit
Contractor: COMFORT CENTRAL HEATING & AIR License #: COMFOCF1990G
FOR MECHANICAL
DUCT SYSTEMS
GAS APPLIANCE<=100,000BT
VENTILATING FANS
GAS LOG OR GAS INSERT
INSPECTIONS CALL (509) 688-0054.
2 $20.00 GAS WATER I (EATER 2 $20 00
2 $24.00 GAS PIPING 4 $4 00
6 $60.00 CLOTHES DRYER 2 $20 00
2 $20.00 HOOD -TYPE 11 2 $20.00
Total Permit Fee: $188 00
Plumbing Permit
Contractor: DIAMOND ROCK CONSTRUCTION License p: DIAMORC0320Q
FOR PLUMBING
TOILETS/BIDETS
TUBS
CLOTIIES WASHER
INSPECTIONS CALL (509) 688-0054.
4 $24 00 SINKS 6 $36.00
4 $24.00 DISH WASFIERS 2 $12.00
2 $12.00 MISCELLANEOUS FIXTURES 4 $24.00
Total Permit Fee: $132 00
Processed By: Main, Jodi L
Printed By: PATRICIA PRINCE Page 1 of 2
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING — when forms and reinforcement are In place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense
FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING — after rough -in, before covering, and final.
MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL — when complete and prior to occupancy and/or use. All permits require final Inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site Improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants. fire department access,
on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover.
RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall. concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Wiley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Permits and inspections for eieclncal wrong. State Department of Labor Permits and inspections for Sewer Connection. Spokane County Utilities Division
And Industries 324-2640 477-3604
Permits and inspections for on-site septic systems. Spokane Regional Fire spnnkier and alarm systems and pnvate access road inspections, Spokane Valley
Health Distract 324-1560 Fire Department 892-4122
State law RCW 19 122 requires that pnor t0 any excavation the -CALL BEFORE YOU DIG'centermust be notified Call before you dig al least 2 working days in advance. 455-8000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit. or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application Is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent Date
Staff Approval Date
Spokane
F1 alley
BUILDING DIVISION
11703 E. Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
ISite Information
Project Information I
Site Address: 1316 N BELL RD
SPOKANE VALLEY, WA 99206
Parcel Number: 55182.1 148
Project Number: 08002254 Inv: 1 Issue Date: 07/01/2008
Permit Use: NEW DUPLEX LT 3 BLK 3
IPermits
I
Payment Summary
Total Fees AmountPaid
$1.925.05
$1,925.05
AmountOwing
$0.00
Tran Date Receipt # Payment Amt
07/01/2008 14685 $1,925.05
Processed By: Main, odi L
Printed By: PATR CIA PRINCE Page 2 of 2
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owners expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete
PLUMBING — after rough -in, before covering, and final.
MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL — when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover.
RIGHT-OF-WAY/APPROACH — pnor to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Permits and inspections for eleancal vnnng, State Department of Labor Permits and Inspections fa Sewer Connector. Spokane County Utilities D,xsmn
And Industnes 324-2640 477-3604
Permts and inspecions for on-site sepLc systems. Spokane Regional Fire spnnkier and alarm systenw and private access road inspections. Spokane Valley
Health Dlstnet 324-1560 Fire Department 8924122
State law RCW 19122 requires that pnor to any excavation the 'CALL BEFORE YOU DIG'centermust be notified Call before you dig at least 2 working days in advance. 456-8000
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit. or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued Refunds of not more than 80% of a plan. review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed
Owner / Agent /
Date ///c)
Staff Approval Date