14-068.00 HDR Engineering: Sillivan Corridor Studya
7S
YYason h ngbstate Depaltnent sore
Supplemental Agreement
Number 1
Original Agreement Number
Project Number
Organization and Address
HDR Engineering, Inc.
500 108th Ave., NE Suite 1200
Bellevue, WA 98004-5549
Phone: 425-450-6200
Project Title
Sullivan Road Corridor Study
Description of Work
Sullivan Road Corridor Study
Execution Date Completion Date
6/6/2013 12/31/2014
New Maximum Amount Payable
$ 175,113.00
The Local Agency of City of Spokane Valley
desires to supplement the agreement entered into with HDR Engineering, Inc.
and executed on 06/06/2013 and identified as Agreement No.
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows.
Section 1, SCOPE OF WORK, is hereby changed to read:
No rhanpec
11
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for
completion of the work to read: Contract Extension to December 31 7014
Section V, PAYMENT, shall be amended as follows:
No change
111
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action. —
BY' Ronald GjJhlsen Senior Vire President By:
Consultant Signature
DOT Fonn 140-063 EF
Revised 9/2005
Approving Authority Signature
Date