Loading...
14-068.00 HDR Engineering: Sillivan Corridor Studya 7S YYason h ngbstate Depaltnent sore Supplemental Agreement Number 1 Original Agreement Number Project Number Organization and Address HDR Engineering, Inc. 500 108th Ave., NE Suite 1200 Bellevue, WA 98004-5549 Phone: 425-450-6200 Project Title Sullivan Road Corridor Study Description of Work Sullivan Road Corridor Study Execution Date Completion Date 6/6/2013 12/31/2014 New Maximum Amount Payable $ 175,113.00 The Local Agency of City of Spokane Valley desires to supplement the agreement entered into with HDR Engineering, Inc. and executed on 06/06/2013 and identified as Agreement No. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows. Section 1, SCOPE OF WORK, is hereby changed to read: No rhanpec 11 Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: Contract Extension to December 31 7014 Section V, PAYMENT, shall be amended as follows: No change 111 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. — BY' Ronald GjJhlsen Senior Vire President By: Consultant Signature DOT Fonn 140-063 EF Revised 9/2005 Approving Authority Signature Date