2012, 08-01 Permit: SW-12001886 Sewer1i
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001886
Permit Issued Date:
08/01/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
SUTTERS PH 3
SEWER
Primary Contact: CYCLOPS PIPE SERVICES, LLC.
Applicant: CYCLOPS PIPE SERVICES, LLC.
Address: P.O. BOX 700
NINE MILE FALLS, WA 99026
Phone: 509-413-9529
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision.:
Assessor's Description
Inspection Area:
812SBEST RD
45233.0610
TALLY HO SUBDIVISION
VERA TALLY HO B148 L2B2
Water District: Vera
Irrigation District #15
Zoning. Land Area
Owner:
Address:
Phone:
Email.
SHANKLIN, CAROLY J
8125 BEST RD
VERADALE, WA 99037
Fire District: Spokane Valley Fire
0780 Square Feet
CONTRACTORINFORMATIQN:
General Contractor
CYCLOPS924K9
CYCLOPS PIPE SERVICES, LLC.
P.O. BOX 700
NINE MILE FALLS, WA 99026
509-413-9529
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5.00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 08/01/2012 14:11:38
,u.
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY EEUILDING AND PLANNING
tbs
PERMIT
Permit Issued Date:
Application Number: SW -12001886 08/01/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 08/01/2012 14:11.38
Printed by: IIS APPPOOLIASP.NET v4.0