2006, 05-30 Permit: 06003469 SewerSPOKANE COUNTY
DEPARTMENT OF BUILDING & PLANNING
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
1
Site Information
Project Information
Site Address: 1315 S BETTMAN RD
Parcel Number: 35243 0913
Subdivision: BETTMAN'S ADD
Block:
Zoning: UNK
Lot:
Unknown
Owner: KOZUBENKO, PAVEL & OLGA
Address: 515 S FERRALL
SPOKANE, WA 99202
Building Inspector: F PALADICHUK
Water Dist: UNKNOWN
Project Number: 06003469
Inv: 1 Issue Date:
Permit Use: SEWER CONNECTION - BETTMANS ADD
Applicant: KOZUBENKO, PAVEL & OLGA
515 S FERRALL
SPOKANE, \VA 99202
Contact: KOZUBENKO, PAVEL & OLGA
515 S FERRALL
SPOKANE, WA 99202
Setbacks - Front:
Group Name:
Project Name:
1
5/30/2006
Phone: (509)532-1490
Phone: (509)532-1490
Left: Right: Rear:
Permits I
Sewer Connection Permit
Contractor: II & S CONSTRUCTION
License #: HSCON•' 123KF
SEWER CONNECTION
I S85.00 PROCESSING FEE
1 81500
Total Permit Fee: S100.00
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPLAT (509) 477-3604 FROM 8:30-5.00 MONDAY -FRIDAY PRIOR TO
COVER. ONE WORKING DAY NOTICE REQUIRED, PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL
INSPECTION FEES APPLY AFTER 30 MINUTES. '
THE INSTALLER IS RESPONSIBLE TO INSURE ALL'\VASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND
MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE
ELEVATION AND POSITION OF SEWER STUBn PRIOR TO ANY OTHER -EXCAVATION.
�
SEWER STUBS ARE TO 13E CHECKED PRIOR`TO'CONNECTION TO,ENSU_RE THAT THEY HAVE ACCEPTABLE GRADE
AND ARE CLEAR AND UNOBSTRUCTED TO THE MAIN:,SEWER LINES:SHOULD 13E CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVET OF THE STRUGTURE74..'
THE INSTALLER AND THIS PERMIT MUSTBE'PRESENT ATTHE JOB:SITEPATITHE SCHEDULED INSPECTION TIME.
BOTH STATE LAW RCW 19.122 AND.doUNTY_CODE. REQUIRESTHE'INSTARLER TO GIVE NOTICE OF EXCAVATION TO
OWNERS OF UNDERGROUND FACILITIES---r•-,.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE
REQUIRES THE INSTALLER COMPLY WITH,ALL,REQUIREMENTS OF THE WASTATE DEPT OF LABOR & INDUSTRIES,
INCLUDING THOSE RELATED TO TRENCH SAFETX_. g\j! ii (if 11'{ C6\1 �i V
c:=912 'Yet \4 \1:. ` Lid �.1`J' :bfl \‘11. LL
Payment Summary
Total Fees AmountPaid AmountOwing
$100 00 $100.00
50.00
Tran Date Receipt # Payment Amt
5/30/2006
Processed By: CUMMINGS, KATHY
Printed By: HINTZ, FAITH Page I of I
2783 $100.00
PERMIT
NOTICE
It is the responsibility of the apphcant/perrttee to see that the use described on the front of this permit complies with applicable codes and requirements and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are
required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections
ARE REQUIRED by County Code:
L FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations Typically,
side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property line or the center line of the
roadway right-of-way, whichever provides the greater setback from the center line of the roadway nght-of-war. Curb lines and fence lines are not necessanly indica-
tive of property lines In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb.
The responsibility to comply with applicable setback provisions hes solely with the permittee—neither Spokane County nor its authonzed representatives assume any
responsibility for the verification or location of your property lines Please verify their location prior to locating your structure. Failure to properly locate the structure
may require its relocation at the owner's/permittee's expense.
2 FOUNDATION - when fors and reinforcement are in place and prior to placement of concrete.
3 FRAMING - after all framing, bracing and blocking is in place, and prior to concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - after rough -in, before covering, and final. .
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use Please provide 24 hours notice. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by
ordinance or as a condition of approval of this period Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road
improvements, parking, and landscaping are common requirements of a perrUsite plan which must be completed prior to final approval of a building or issuance
of a Certificate of Occupancy.
8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc installed. and prior to occupancy, completed inspection record
card must be available on site. Manufactured home installations must comply with the manufactures installation instructions.
9. SEWERS - prior to cover
10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete. etc - must be inspected prior to cover
Check with the department for "special inspections" in conjunction with commercial projects.-
FOR
rojects:
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Budding, plumbing, mechanical and fire inspections, Department • Road cuts for utilities or driveways, Division of Engineering &
of Budding and Code Enforcement Roads - 48-HOUR NOTICE REQUIRED
477-3675 477-3600
or State Department of Transportation
• Construction In a flood plain. Division of Engineering & Roads 456-3000
477-3600
• Electrical wiring, State Department of Labor and Industries
324-2640
• Sewer connection. Division of Utilities
477-3604
or City Public Works Department
625-6300
• On-site waste disposal system, Spokane Regional Health District
324-1560
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted, this permit will he considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for a period of 180
days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be
requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the onginal fee,
subject to certain limitations—please call us if you have any questions
Any refund requests must be made in writing by the applicant/permittee (shown on the reverse) no Tater than 180 days after the date of fee payment. Refunds of not more
than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after fee payment.
MISTAKE?
If you think we've made an en -or in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the pent, please bring it to our
attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Division of Building and
Code Enforcement at the below address.
Spokane County Department of Building and Planning
1026 West Broadway Avenue, Spokane, WA 99260
Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133
www.spokanecotavtyorg/bp bperspokanecountyorg
P RM 3046 .06 911X1 1,510411