Loading...
2008, 01-08 PLUS: 05002240 Driveway LetterSpokane #Valley® 11703'E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 ♦509.688.0036 ♦ Fax: 509.688.0037 • January 8, 2008 Brian Main 2407 W Pacific # B Spokane WA 99204 RE: 13th and Bettman Driveways; PLUS Project # 05002240 Dear Mr. Main; This letter is in regards to the letter sent November 2, 2007 to William Custer of Storhaug Engineering. In that letter, Mary Kate Martin, City of Spokane Valley Building Official, notified Storhaug Engineering that the driveway installed at the 13th & Bettman project does not conform with submitted plans for that project, and that there is a number of problems associated with the installation. The City of Spokane Valley has been receiving complaints as a result of the driveway, and as of yet, we have not heard from Storhaug when the corrections will be started and/or completed. Please contact me at swallace@spokanevalley.ore or 688-0053, MK Martin at mmartin@aspokanevalley.org, or 688-0024, or John Hohman at jhohmanasnokanevalley.ore or 688- 0185 by January 31g, 2008, when these corrections will be made or code compliance will begin, proceedings. Sincerely, Scott Wallace City of Spokane Valley ROW Inspector Cc: MK Martin, Building Official John Hohman, Senior Engineer Kathy McClung, Community Development Director Chris Berg, Code Enforcement Bill Shultz, Code Enforcement William Custer, Storhaug Engineering File: PLUS Project # 05002240 Attachment November 2, 2007 letter Spol�ane _#Va11ey® Fr 4 of 6612-90 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ email: November 2, 2007 William Custer Storhaug Engineering 610 E Third Avenue Spokane WA 99202 RE: Certification for 13th and Bettman Driveways; PLUS Project #05002240 SE Project # 07-371 and 04-014 Dear Mr. Custer; The certification letter you submitted, dated October 18, 2007, was forwarded from Public Works Construction Inspector Rod Pegram to the Building Division for acceptance and consequent approval of project #05002240. The City has reviewed your letter and is unable to accept the certification at this time for the following reasons: 1. The deviations noted in the certification letter represent significant issues for the ultimate intended use of the driveways. a) Multiple issues have resulted from raising the grade of the road above the existing grade. i. The installed configuration Lacks standard drainage components and presents an obstruction to existing drainage patterns. ii. The driveway roadbed, as installed, is located in a designated floodplain and requires application for construction in the floodplain along with appropriate design and approval. b) The 12 ft strip of asphalt functionally reduced the driving surface from 20 ft. to 12 ft. c) The radii are significantly less that the 28.5 ft minimum indicated on the plans and are close enough together as to prevent passage of emergency vehicles without leaving the drive surface. d) Based on a site visit conducted on October 25, 2007, with Spokane Valley Fire Marshal Kevin Miller, the present condition of the road is not useable and is unacceptable for fire apparatus access to the lots. e) The impervious surface was not included/indicated on the original approved plans, therefore was not reviewed for potential impacts to drainage or the City's 5,000 sq ft threshold for additional drainage design. 2. The certification letter does not state that the road, as installed, will support a 75,000 Ib fire apparatus. 3. The permit for this project was issued in July 18, 2005 and has expired. A new application will be required before any activity can recommence on this site. , As stated above, the City is unable to accept the current certification as submitted. Please contact me at mmartinaspokanevallev.org or 688-0024 or John Hohthan at jhohmanaspokanevalley.org or 688-0185 with regard to this project by November 16, 2007. If we are unable to resolve the outstanding issues by that time, the City will proceed with filing notice on the titles of the affected lots with regard to the condition of the accesses. Sincerely, /UK. MK. Martin Building Official Cc: John Hohman, Senior Engineer Kevin