Loading...
2012, 07-25 Permit: SW-12001823 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001823 Permit Issued Date: 07/25/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION ROCKWELL PH II SEWER Primary Contact: OVERLAND EXCAVATION INC Applicant: • OVERLAND EXCAVATION INC Address: P.O. BOX 277 NEWMAN LAKE, WA 99025 Phone: (509)939-7984 Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessors Description Inspection Area: Zoning: 4516 N BEST RD 45022.2311 THROOP & FITZPATRICK SUBDIVISION TRENTWDORCH THROOP&FITZ L11 B3 Owner: Address: Phone: Email: MARTIN, LESLIE M & AARON M PO BOX 343 NEWMAN LAKE, WA 99025 - Water District: Trentwood Fire District: Spokane Valley Fire Irrigation District #3 Land Area: 7199 Square Feet CONTRACTOR INFORMATION: General Contractor OVERLEI951LE OVERLAND EXCAVATION INC 5918 E TRENT AVE SPOKANE, WA 99212 509-939-7984 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 $125.00 Total Fee: $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 07/25/2012 09:40:26 Printed by: IIS APPPOOLASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001823 07/25/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 07/25/2012 09:40:26 Printed by: IIS APPPOOLVtSP.NET v4.0