2012, 04-11 Permit: SW-12001114 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001114
Permit Issued Date:
04/11/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: H & S CONSTRUCTION
Applicant: H & S CONSTRUCTION
Permit Type: SEWER Address: 11817 E VALLEYWAY AVE
SPOKANE, WA 99206
Phone: 509-926-8964
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description
Inspection Area:
1022 N BEST RD
45142.9209
14-25-44 N9OFT OF N180FT OF W130FT OF S1/2
OF N1/2 OF W1/ 2 OF W1/2 OF SE1/4 OF NW1/4
EXC RD
Owner:
Address:
Phone:
Email:
JOHNSTON LIVING TRUST
3812 S RIVGEVIEW DR
SPOKANE, WA 99206
Water District: Fire District: Fire District 1
Consolidated Irrigation
District #19
Zoning: Land Area: 0.32 acres / 13939 sqft
CONTRACTOR INFORMATION:
General Contractor
HSCON"123KF
H & S CONSTRUCTION
11817 E VALLEYWAY AVE
SPOKANE, WA 99206
509-926-8964
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing - Utilities $25.94
Utilities Permit $125.00
Total Fee:
$150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed. 04/11/2012 14:09:16
Printed by: 115 APPPOOLWSP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001114 04/11/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed. 04/11/2012 14:09:16
Printed by: IIS APPPOOL\ASP.NET v4.0