Loading...
1976, 11-23 Permit App: L6313 Residence,n ru ._ ._ ... ...... .�' .. County of Spokane. Washington BUILDING CODES DEPARTMENT, N. 811 JEFFERSON, SPOKANE, WASHINGTON 99201 APPLICATION FOR LAND USE OR STRUCTURE PERMIT GENERAL REQUIREMENTS PERMIT FEE JOB #104 $27.00 PERMIT REQUIRED. A land use or structure permit is required by County Resolution to erect a building or structure of any kind or alter any building or structure already erected, or to change a land use. Construction must conform with the Spokane County Building Code and Zoning Ordinance. Construction is subject to inspection. WATER. Water supply must be approved by the County and State Health Departments. Where work on water connections disturbs the surface, shoulders or ditches of County Roads, permission must be obtained from the County Engineer's Office. SEWAGE SYSTEM. Permits are required in all cases by County Resolutions Nos. 45-133 and 47.235. SET -BACK FROM PROPERTY LINES. In most zones and under most circumstances, a set -back from the front property line, of at least 25' is required, a 5' side yard, 15' side yard from a flanking street, and a 25' rear yard are required. STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set -back and ingress and egress. COUNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and work must be performed in accordance with stakes. Points of ingress and egress must be approved by the County Engineer. MOVING OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County or Stat Highway, clearance must be obtained from the County Engineer and/or State Highway Department. ACCESSORY BUILDINGS. Accessory buildings (garages, sheds, etc.) require a separate permit. RESTRICTIVE COVENANTS. Builders should check provisions of covenants or dedications and easements running with the land( which are enforceable through civil action. County Officials can not bring action to enforce covenants or dedications. APPLICANT FILL IN BELOW THIS LINE Name of Owner Kapoen Constructi:n, 'nr Address N 2112 Pine Road Phone 99R-RFi6!l Architect Address Phone Engineer Address Phone Contractor Kanner'Conctrurtion Inc Address N. 9212 , Pines Poad Phone 928-8660 Legal Description of Property (Give complete description.from deed, tax receipt etc 1 Lot 1, Block 1, 11_th Add. to Veradale Heights pit .e.„r-L / 542- —02.026/ DESCRIPTION OF WORK: New X Addition Remodel Size of Lot 125' x66' x105' x86.24' Stories 1 Dimensions 36' X24' Rooms —a_ Baths Basement full Foundation Const Full, part, none) Heat. System elec. bbd Type of Rooting Use of Bldg. single family dwelling -unfinished Moving Bldg. Zone / Fire Zone -- Sewage System Septic c_onstfran(Fretc.) vaivation$ 10,9c0.00 Fireplace none (Kind) (Number concrete COm Ext Finish WOn basement — Total Sq. Ft. 894 Chimney none Int Wall Finish gyp hd n..it No of Units(_ Bedrooms 2 PLOT PLAN Draw sketch with dimensions showing: (1) property lines; (2) street or road locations; (3) location of existing and proposed buildings; (4) distance to property lines and streets; (5) dimensions of buildings; (6) location of sewage sys- tem and water supply lines. ni 0 H NORTH RESIDENTIAL — COMMERCIAL See Attached SOUTH State License No. Ind. Ins. Acct. Na. REQUIRED Plumbing Permit rn Heating Permit NSewage Permit Plans Received Plans Checked Plans Returned Plans Picked Up Plans Mailed I hereby certify information Submitted I correct and there are no other structur as shown. Owner or Agent s located on this property except ///9 3/7e Date A LAND USE OR STRUCTURE PERMIT MUST BE ON THE PREMISES BEFORE CONSTRUCTION THIS IS NOT A PERMIT. Tour street address will be Sewage Permit Number Remarks DO NOT WRITE BELOW THIS LINE . ,be_st £ad COMMENCES. Issued Building fermi � A r /7--- The zone is 4 ' / oe-c, (2 (t Receipt .f`70 Issued KAPPEN CONSTRUCTION, INC. North 2312 Pines Road Spokane, Washington 99216 928-8660 Basic: Requested Lot Cost PLOT PLAN Price As3cro °1 t'. ao / V e_. n w t. IOS 4 - ELEVATIONS: Crown of Street+7- Finish Floor tPS° FHA Case Sq. Ft. `Jo6 /C1y/ \,, Scale: L. i(, Mortgage Co. C'Power Co. • Corr /2-' P_ rG ti- 4l ter Co. L a 0/. da %r cl Excavator i Los/ xcugil PTum6er Ly/ /-/a f r Legal LI c Rik, //tc%old, (Aradt/c ,17/z: Address: