2005, 01-28 Permit: 05000267 AdditionSpokane
oValley
BUILDING DIVISION
11707 E Sprague Avenue Suite 106
Spokane Valley, WA 99206
Site Information
Project Information
Site Address: 2017 N BESSIE RD
Parcel Number: 45074 0330
Subdivision:
Block: 3 Lot: 4
Zoning: UR -3 Urban Residential 3.5
Owner: WIDRIG, ANDY
Address: 2017 N BESSIE RD
SPOKANE VALLEY, WA 99212-2421
Building Inspector BARRY HUSFLOEN
Water Dist:
Project Number: 05000267 Inv: 1 Issue Date: 01/28/2005
Permit Use: ADD 28 SQ FT DIMNG ROOM BUMP -OUT
Applicant: SMART CONCEPTS INC
PO BOX 1178
MEAD, WA 99021
Contact: SMART CONCEPTS INC
PO BOX 1 178
MEAD, WA 99021
' Phone: (509)927-0130
Phone: (509) 927-0130
Sethacks- Front: N/A Left: EXI Right: EXIS Rear: 12+
S
Group Name:
Project Name:
Permits
Building Permit
Contractor: SMART CONCEPTS CONST LLC
License #: SMARTCC963KR
Group: R-3 Type: VH
Total Area 28
BUMP -OUT
Total Value:
FOR BUILDING INSPECTIONS CALL, (509) 688-0054.
R-3 VB 0
54,000 00
RESIDENTIAL PERMIT FEE
STATE SURCHARGE
RESIDENTIAL, PLAN REVIEW
'rota) Permit Fee:
597.25
54.50
$38 90
5140 65
Payment Summary
Total Fees AmountPaid AmountOwinv
$140 65 $140.65 $0.00
Processed By: KATHY CUMMINGS
Printed By: DOMPIER, DAWN
Tran Date
01/28/2005
Page 1 of 1
Receipt #
206
Payment Amt
$140.65
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE' This inspection includes review of the structure's setback from property lines Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines The responsibility to comply with applicable
setback provisions Iles solely with the permittee -neither the City of Spokane Valley nor Its authorized representatives assume any
responsibility for the verification er location of your property lines. Please verify their location prior to locating your structure Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete
PLUMBING - after rough -in, before covering, and final
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing
FINAL - when complete and prior to occupancy and/or use. All permits require final Inspection.
NOTE' In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy
MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy;
completed inspection record card must be available on site
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Permits and inspections for eleclncal wiring, Slake Department of Labor Permits and inspections for Sewer Connection, Spokane County Utilities Division
And Industries 324.2610 477-3604
Permits and inspections for on -sae septic systems, Spokane Regional Fre spnnkler and alarm systems and pnvate access road inspections. Spokane Valley
Fore Department 892-4122
Health DsInct 324-1560
Slate law RCW 19 122 requires that pnor to any excavat:on the -CALL BEFORE YOU DIG' center must be notified Call before you dig al least 2 working days in advance. 456-8000
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected Refunds of not more than 80% of a permit fee may be
authorized when no work has been done un. - - .ermlt issued Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelleā¢ .nor to the plan review being completed.
Owner / Agent
Date 12S zC
Staff Approval Date