Loading...
2005, 01-28 Permit: 05000267 AdditionSpokane oValley BUILDING DIVISION 11707 E Sprague Avenue Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 2017 N BESSIE RD Parcel Number: 45074 0330 Subdivision: Block: 3 Lot: 4 Zoning: UR -3 Urban Residential 3.5 Owner: WIDRIG, ANDY Address: 2017 N BESSIE RD SPOKANE VALLEY, WA 99212-2421 Building Inspector BARRY HUSFLOEN Water Dist: Project Number: 05000267 Inv: 1 Issue Date: 01/28/2005 Permit Use: ADD 28 SQ FT DIMNG ROOM BUMP -OUT Applicant: SMART CONCEPTS INC PO BOX 1178 MEAD, WA 99021 Contact: SMART CONCEPTS INC PO BOX 1 178 MEAD, WA 99021 ' Phone: (509)927-0130 Phone: (509) 927-0130 Sethacks- Front: N/A Left: EXI Right: EXIS Rear: 12+ S Group Name: Project Name: Permits Building Permit Contractor: SMART CONCEPTS CONST LLC License #: SMARTCC963KR Group: R-3 Type: VH Total Area 28 BUMP -OUT Total Value: FOR BUILDING INSPECTIONS CALL, (509) 688-0054. R-3 VB 0 54,000 00 RESIDENTIAL PERMIT FEE STATE SURCHARGE RESIDENTIAL, PLAN REVIEW 'rota) Permit Fee: 597.25 54.50 $38 90 5140 65 Payment Summary Total Fees AmountPaid AmountOwinv $140 65 $140.65 $0.00 Processed By: KATHY CUMMINGS Printed By: DOMPIER, DAWN Tran Date 01/28/2005 Page 1 of 1 Receipt # 206 Payment Amt $140.65 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE' This inspection includes review of the structure's setback from property lines Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines The responsibility to comply with applicable setback provisions Iles solely with the permittee -neither the City of Spokane Valley nor Its authorized representatives assume any responsibility for the verification er location of your property lines. Please verify their location prior to locating your structure Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete PLUMBING - after rough -in, before covering, and final MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing FINAL - when complete and prior to occupancy and/or use. All permits require final Inspection. NOTE' In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover. RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for eleclncal wiring, Slake Department of Labor Permits and inspections for Sewer Connection, Spokane County Utilities Division And Industries 324.2610 477-3604 Permits and inspections for on -sae septic systems, Spokane Regional Fre spnnkler and alarm systems and pnvate access road inspections. Spokane Valley Fore Department 892-4122 Health DsInct 324-1560 Slate law RCW 19 122 requires that pnor to any excavat:on the -CALL BEFORE YOU DIG' center must be notified Call before you dig al least 2 working days in advance. 456-8000 PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected Refunds of not more than 80% of a permit fee may be authorized when no work has been done un. - - .ermlt issued Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelleā€¢ .nor to the plan review being completed. Owner / Agent Date 12S zC Staff Approval Date