2013, 02-13 Permit: SW-13000068 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -13000068
Permit Issued Date:
02/12/2013
Expiration Date: 02/13/2013
Project Description:
Project Name:
Permit Type:
ALTERATION TO EXISTING SEWER
SHP-2003-23/LOT 1
SEWER
Primary Contact
Applicant:
Address:
Phone:
Email:
VISTA CONSTRUCTION &
DEVELOPMENT, LLC
VISTA CONSTRUCTION &
DEVELOPMENT, LLC
3420 N TSCHIRLEY ST # 1
SPOKANE, WA 99216
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessors Description
Inspection Area:
Zoning:
1725 N BESSIE LN
45074.2501
SHP-23-03
SP 2003-23 LT 1 BLK 1 (AFN# 5372927)
Owner:
Address:
Phone:
Email:
BESSIE ROAD PROPERTIES LLC
PO BOX 74
LIBERTY LAKE, WA 99019-0074
Water District: Spokane Fire District: Spokane Valley Fire
County Water District #3
Land Area. 20098 Square Feet
CONTRACTOR INFORMATION;
General Contractor
VISTACD999DE
VISTA CONSTRUCTION & DEVELOPME
3420 N TSCHIRLEY RD #1
SPOKANE, WA 99216
509-926-2243
DETAIL$:
Class
Type
Quantity Unit Charge Value
SEWER ALTERATION TO EXISTING
FEE DETAIL:
Processing - Utilities
Utilities Permit
1
$125.00 $125.00
Total Fee:
$125.00
$26.32
$125.00
$151.32
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 02/12/2013 0734:25
Printed by: IIS APPPOOL\SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -13000068 02/12/2013
Expiration Date: 02/13/2013
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5.00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 02/12/2013 07:34:25 Printed by: IIS APPPOOL\SmartGavProdApp