Loading...
14-085.00 WSDOT: Sprague Street Preservation Vista to Herald • Agcy WilWashington State Department W Transportation Local Agency Agreement Supplement Agency Supplement Number City of Spokane Valley 1 Federal Aid Project Number Agreement Number CFDA No. 20.205 STPUL-3 840(010) LA-8058 (Catalog of Federal Domestic Assistance) The Local Agency requests to supplement the agreement entered into and executed on 5/17/2013 All provisions in the basic agreement remain in effect except as modified by this supplement. The changes to the agreement are as follows: Project Description • Name Sprague Ave Street Preservation Projects Length 1.17 Termini Vista Rd to Herald Rd • Description of Work ❑ No Change Grind and overlay of pavement surface, storm water facility upgrades, and curb ramp upgrades-Sprague Ave-Vista Rd to Argonne Rd(WA-051120)and Sprague Ave-Argonne Rd to Herald Rd(WA-05111) . Reason for Supplement Stormwater facility work has been added to the description. The City is requesting authorization of CN funding. Does this change require additional Right of Way or Easements? ❑Yes ®No Estimate of Funding Type of Work (1) (2) (3) (4) (5) yp Previous Supplement Estimated Total Estimated Agency Estimated Agreement/Suppl. Project Funds Funds Federal Funds PE a.Agency 89,200.00 89,200.00 12,042.00 77,158.00 86.5 % b. Other c.Other Federal Aid d.State 1,000.00 1,000.00 135.00 865.00 Participation Ratio for PE e.Total PE Cost Estimate(a+b+c+d) 90,200.00 90,200.00 12,177.00 78,023.00 Right of Way f.Agency % q.Other Federal Aid h. Other . Participation Ratio for RW I.State _ j.Total RNV Cost Estimate(f+g+h+i) Construction k.Contract 1,211,279.00 1,211,279.00 163,523.00 1,047,756.00 I. Other Mat Testing Consult 38,000.00 38,000.00 5,130.00 32,870.00 86.5 % m.Other Federal Aid n.Other • Participation o.Agency 38,421.00 38,421.00 5,187.00 33,234.00 Ratio for CN p.State 2,000.00 . 2,000.00 270.00 1,730.00 q.Total CN Cost Estimate(kd+m+n+o+p) 1,289,700.00 1,289,700.00 174,110.00 1,115,590.00 r.Total Project Cost Estimate(e+j+q) 90100.00 1.289.700.00 1379.900.001 186.287.00 1.193.613.00 The Local Agency further stipulates that pursuant to said Title 23,regulations and policies and procedures, and as a condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. Agency Official Washington State Departmen f Transportation B Y // f?/ • 8DAw5 BY �u� � Title r r/i>Li c. Akettes ))iedcr011 Director of FBe gtweyend Local Programs 5/74V Date Executed S -13--)f` DOT Form 140-041 EF • Revised 03/2011 C LI -o g5,