Loading...
14-099.00 S & L Underground: Valley Regional Decant Facility Ph 2 STioliatte 4..00 CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 14-009 DEPARTMENT OF PUBLIC WORKS PROJECT: Phase 2-Spokane Valley Regional Decant Facility CHANGE ORDER NO: 3 CONTRACTOR: S&L Underground, Inc. CONTRACT DATE: 3/14/2014 PROJECT NO: 0173 PO* 43193 DESCRIPTION OF CHANGES This change order deletes item#8,"Unsuitable Foundation Excavation"and adds item#47,"Minor Changes". Minor changes to the project include: grading and piping of secondary storage pad leacheate to tipping floor, standpipe material type change per engineers recommendation,upgrade existing fiber optic box lid for Heavy Duty lid in valor travel path,and retrofit of pipe size to manholes from previous phase which helped result in a cost savings to the overall project of$50,000. Item No Description Unit Quantity Unit Price Total 47a Secondary storage drainage grading change LS 1 $5,462:00 $5,462.00 47b Change 6"PVC Standpipe to 6'Ductile Iron LS 1 $1,610.00 $1,610.00 47c Change existing Fiber Optic box lid for HD lid LS 1 $1,000.00 $1,000.00 47d Retrofit existing MH#4&CB#3 for 8-inch LS 1 $1,840.00 $1,840.00 8 delete item -not needed,required,or used CY 330 -$18.00 -$5,940.00 TAX 8.7%SALES TAX :.. $345:56 Total Amount of this Change Order. $4,317.56 SUBSTANTIAL COMPLETION Original Date: 3/24/2014 Prior to this Change Order 8/2812014 Including this Change Order. 9/52014 Original Working Days: .110 , Working Days Added by this CO: 5 Working Days including this CO: 115 THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT $ $750,865.90 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT $ $102,69t61 TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $ $853,557.51 NET THIS CHANGE ORDER $ $4,317.56 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ $857,875.07 CONTRACTOR ACCEPTANCE „cell ` DATE �—/f—/y The contractor hereby accepts this a.'ustment under e terms of the original contract for all work performed. �1. RECOMMENDED BY: A I DATE i$ ,Tyr t) Zo 1-7 - ..Project Manager /�, '- APPROVED BY: 1 DATE: r ,�. / ,/.Y1I e Guth,Public Works Director J APPROVED BY: iiii1111°1i [ DATE: 6/FA Mike Jackson,City Manager f _ cot y-ocic(