Loading...
2013, 10-15 Permit App: APR-2013-0053 ApproachCIIY OF ������%%% 11 Spokane _#Valley Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (50n Fax: (50 permitcenter@spokanevalley.orq (Staff Use Only)n PERMIT NUMBER: in I-53 PERMIT FEE: APPROACH PERMIT APPLICATION PROJECT ADDRESS: / / 3Q77 (. 12)01 51" 0151" START DATE: 1O/ (e)/l 2j f/ ANTICIPATED C BUILDING OWNER NAME: ( 6L ( in I MAILING ADDRESS: rePa PLETIONDATE: �/ ^� fl P v�IBJ-� CITY: STATE: ZIP.: CONTACT PERSON NAME: UC 1 1 5 2013 PHONE: �'-40--a-2 FAX: 1 CSVGELL::% CONTRACTOR NAME: FP IIT I1' h)ii*) SUB # 11 r,t STATE: Li n4 ZIP: rq a -os MAILING ADDRESS: CITY: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: XPIRES: ) 4 CITY BUSINESS LICENSE NO.: PROJECT DESCRIPTION (Please Provide Site Sketch) XResidential Driveway Q Commercial/Industrial Driveway Q Existing Curb & Gutter Q Culvert Installation 2 Other Conditions: O Rural Road Section ▪ Sidewalk Repair/Construction o9v Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their sgnature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory i5 the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done In full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional Information may be required to be submitted and subsequently approved before this application can be processed. Signature Date: i0 -/)-?_)L5 Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/fllestorage/124/938/210/948/1496/Approach_Permit_1-11-11.doc CURB RETURN APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑ Sidewalk ft wide _ ft from back of curb ❑ Streetside Swale ' ❑ Drainage Ditch o Drywell (show location on sketch) ❑ Other (please describe below) wi ai ai DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) /Lt„i-- CONCRETE APPROACH 11"(z-eHlo_ CURB h-4' 1 THROAT WIDTH ®FT WING • (SEE TABLE) STREET NAME I i� w 0 0 CC! a1 EDGE OF ASPHALT 4' WING STREET WIT URB DISTANCE FROM NEAREST PROPERTY UNE MAY BE LEFT OR RIGHT SIDE) E—IFT (SEE TABLE) \IF CORNER LOT, DISTANCE FROM CURB RETURN in FT (SEE TABLE) ASPHALT 15'RADIUS APPROACH STREET ME T WIDTH n FT (SEE TABLE) STREET WITH ASPHALT EDGE RADIUS RETURN ace, 6fPacA_- \i IF CORNER LOT, DISTANCE FROM RADIUS RETURN Q FT (SEE TABLE) Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Reside al Approac \ Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' / 5' Sp®kane 'alley Development Engineering 11707 E Sprague Ave Suite 106 • Spokane Valley WA 99206 509.921.1000 1 Fax: 509.921.1008 • cityhall®spokanevalley.org Approach Permit Application Review TO: Building Department Site Address: 13207 E Blossey Project No: APR -2013-0053 Reviewed By: Date: lqi S1/4,j Accepted Not Accepted Approach X Building Location Paved Access Notes: 1. Approach to be constructed pursuant to City of Spokane Valley Street Standards, Standard Plan R-112. 2. Saw cutting of existing curb to create an approach is not allowed within the City's jurisdiction. 3. Approach is to be inspected by the City's ROW Inspector prior to concrete placement. Reviewed By: Date: lqi S1/4,j