Loading...
2013, 04-08 Permit App: BLD-2013-0011 Approach-Siokane FValleyx Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenterColsooka nevalley.orq (Staff Use Only) lq PERMIT NUMBER: Pa— 1 - II PERMIT FEE: APPROACH PERMIT APPLICATION PROJECT ADDRESS: /- / ,12/.3 /S/ p S 5 •Q-' A v•" , START DATE: ANTICIPATED COMPLETION DATE: BUILDING OWNER NAME: f7e„f„,37-y 4/ 4, G h 4 Af rj £R MAILINGG ADDRESS: is l.3 .7r- c S s`Y A vE , {1hi . 415 -Q -I , a(')' ) CITY: -SPD/r/R/Yc'S'o / /TATE: LL/f& S it ZIP: 99,-7/C CONTACT PERSON NAME: PHONE: / 20 8,"— (, Com' 9 - 3 0 L/ a FAX: '—_- CELL: StitH� CONTRACTOR NAME: -rive " 1 Project # P'�- / f �M ,/1_ -n [� MAILING ADDRESS: i S 1M • 1 ' aithen.k.. QS • 3 r'1 r" "I-' r -i i / an 1 v`1 e ry CITY: f{C] O �T 4ATE: WTI • ZIP: PtgO 3'7 L ' PHONE: 4-15i t 4t74 FAX: 'CELL: AEpI! O S 2013 ^„�-�E�13 CONTRACTOR LICENSE No.: FIVESS2R4.3OQXPIREs: W( Ail bet. CITY BUSINESS LICENSE NO.: „( 4, T 49 PROJECT DESCRIPTION (Please Provide Site Sketch F.EV, # n O Existing Curb & Gutter Q Culvert Installation O Other Conditions: ommerclal/Ind ustrlaLDriveway Q Rural Road Section ID Sidewalk Repair/Construction Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for construction or on a dwelling, the dwelling Is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature Date: 1, Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Approach_Permit_1-11-11.doc APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑ Sidewalk ft wide ft from back of curb ❑ Streetside Swafe ❑ Drainage Ditch ❑ Drywell (show location on sketch) ❑ Other (please describe below) CURB EDGE OF ASPHALT DI STANCEFROM NEAREST PROPERTY UNE inBE LEFT OR RIGHT SIDE) FT(SEE TABLE) CONCRETE APPROACH !- • 4' -1 --THROAT WIDTH ®FT —k4' WING (SEE TABLE) WING ., STREET,NAME CURB RETURN IF CORNER LOT; •,. DISTANCE FROM CURB RETURN' n FT (SEE TABLE) STREET WITH CURB • DISTANCE FROM NEAREST PROPERTY UNE AY BE LEFT OR RIGHT SID FT (SEE TABLE) ASP AP clipptic_avtf COrin�Lf fi is v1 0.ip,prcrz(63 VJ rJ. t-ccki t o t,j- s,Jo L Ick ✓'C(f.t f[. RADIUS ACV;ca.{;p4 RETURN Si JILe I fl�L �inc�ly a iOAck .vv�lc NIF CORNER LOT, DISTANCE FROM RADIUS RETURN FT (SEE TABLE) 15' RADIUS THROAT WIDTH nIFT-1 (SEE TABLE) STREET NAME /1/ce- cid STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width (flat portion) 16' min., 30' max.30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' =1 . Spokane ao•WValley Development Engineering 11707 E Sprague Ave Suite 106 t Spokane Valley WA 99206 509.921.1000 t Fax: 509.921.1008 t cityhall®spokanevalley.org Approach Permit Application Review TO: Building Department Site Address: 13213 E Blossey Avenue Project No: APR -2013-0011 Reviewed By: Date: 4//(0//3 Accepted Not Accepted Approach X Building Location Paved Access Notes: One of the two existing approaches may be expanded to a maximum of 30 feet; a separation (curb) must remain between the two; applicant may place asphalt behind back of curb where it remains between the two approaches. Saw cutting of existing curb to create an approach is not allowed within the City's jurisdiction. Approach is to be inspected by the City's ROW Inspector prior to concrete placement. Approach to be designed per City of Spokane Valley Street Standards, Standard Plan R-112. Reviewed By: Date: 4//(0//3 TRANSITION AREA 3/8' EXPANSION JOINT FM' 3' 3' -PROJEC 'EU TOP OF CURB ELEVATION 6" PORTLAND CEMENT CONCRETE SECTION A -A GENERAL NOTES 1. EXPANSION JOINT MATERIAL SHALL BE PLACED IN THE CENTER OF ALL DRIVEWAYS OVER 20' IN WIDTH. 2, EXPANSION JOINT REQUIRED IF POUR INCLUDES ADDITIONAL DRIVEWAY AREA. 3, PORTLAND CEMENT CONCRETE SHALL BE CLASS 3000, AIR ENTRAINED. 4, ALL EXTERNAL EDGES TO BE TROWELLED MTh 1/4" RADIUS EDGER. 5. SIDEWALK TO BE SCORED EVERY 5'. 3/8" EXPANSION JOINT TO BE INSTALLED AT LOCATIONS WHERE SIDEWALK INTERSECTS OTHER SIDEWALKS AND DRIVEWAYS. 6, MIN. 4" THICK CRUSHED SURFACING TOP COURSE LAYER UNDER DRIVE APPROACH. 7. FIRST 2' OF DRIVE APPROACH (AT CURB SIDE) SHALL BE THICKENED TO MATCH BOTTOM OF CURB. THROAT WIDTH DISTANCES TYPE MIN. MAX. COMM. 30' 40' RES. 16' 30' EXPIRES 9/Z -9/2o/ 0 DEVELOPMENT SERVICES SENIOR ENGINEER APPROVED FOR PUBLICATION / 2 / a SPYOliane jValley. DRIVEWAYAPPROACH ADJACENT SIDEWALK STANDARD PLAN NO. R-112