Loading...
VE-8-85 ' ' - ZONING AUJUSTOR SPOKANE COUNTY, WASHINGTON IN THE MATTER OF RELAXATION UF FRONTAGE ) FINDINGS OF FACT, REQUIREMENT (VE-8-85) VINCE SEIPP ) CONCLUSIONS, DECISION ANU ) CONDITIONS OF APPROVAL TNIS MATTER, Being the consideration by the Zom ng Adjustor of Spokane County, in heari ng appl icati on VE-8-85, herei nafter referred to as the "Proposal", and the Zom ng Adjustor of Spokane County having held a public hearing on February 21, 1985 and having fully considered all testimony presented thereat, and further having visited the site and vicim ty in question, and having rendered a decision on the 26th day of February, 1985, APPROVING the proposal, makes the following F IND INGS OF FACT 1 That the proposal is general ly 1 ocated north of and fronting on the intersection of Glenn Court and Nora Avenue in Section 9, Township 25, Range 44 and is further described as Lot 7 of the proposed preliminary plat MISSION RIDGE SECOND ADDITION, PE-1488-84, heard before the P1 at Heari ng Exami ner Committee and the Zom ng Adjustor on February 21, 1985 2 That the proposal const sts of a rel axation of 5 feet, to 50 feet from the centerline, for the westerly portion of Lot 7 with regard to Nora ~ Avenue/Glenn Court, whereas strict application of the Spokane County Zo m ng , Ordinance, Section 4 05 110 a 1, woul d requi re 55 feet from the centerl ine of ~ the road right-of-way or 25 feet from the property 1ine, whi chever provi des ~ the greater setback, that larger setback being required to be 55 feet for the westerly portion of Lot 7 3 That the adopted Spokane County Future Land Use Plan designates the area of the proposal as URBAN within the PSSA and the proposal is consistent with the County's entire Comprehensive Plan, including the Future Land Use Pl an 4 That the site is zoned Agricultural with the ASA Overlay Zone, but proposed to become R-2 with the ASA Overlay Zone at finaliaation of the plat, which would allow the proposed use upon approval of this app1ication 5 That the existing land uses in the area of the proposal include existing duplexes to the east and south and proposed to exist to the immediate west on Lots 1- 6 af the proposed preliminary plat, all of which are compatible with the proposal 6 That pursuant to the State Environmental Policy Act the enviroronental checklist and other data has been reviewed and the project has been found to not have any probable significant adverse impacts to the physical environment A Determination of Nonsigm ficance (DNS) was issued on January 189 1985 The agencies reviean ng the checklist neither indicated that a more detailed environmental review should be provided nor commented that the DNS should be re-considered Conments regarding environmental matters were not made at the public hearing There was not sufficient evidence presented pursuant to WAC 197-11-340 (3) (a) to withdraw the DNS 7. That there were no specific recommendations from other departments, either individually or as associated with the recommended conditions of approval associated with the proposed preliminary plat which would affect the 1 ~ FINDIN6S OF FACT, CONCLUSIOHS, DEGISION AND CONDITIONS OF APPROVAL FILE # VE-8-85 PAGE 2 decisi on of the Zom ng Adjustor, except that recommendati on #28 of the Spokane County heal th 0istrict (appeari ng on page 23 of the February 21, 1985 Staff Report for PE-1488-84) addressed a need to set the buildings on Lots 6 and 7 considerably northward in order to allow the accommodation of drainfields on the southern portions of the lot, but that the Health District representative, in the February 21, 1985 hearing did verbally remove, with the approval of the Hearing Examiner Committee, the requirement for the buildings to be shifted northward on Lots 6 and Lot 7 8 That the revised Condition of Approval #28, as described immediately above, thus allows the placement of the dwelling unit structure on the southerly portion of Lot 7 with the opinion being offered that the drainfield can most 1 i kely be acconmodated either on the north portion of the 1 ot partially utilizing the gentle slope or possibly on Lot 7 to the west of the dwel l i ng uni tif such space exi sts after pl acement of the dwel 1 ing uni t is determi ned. 9 That the Health District representative and the applicant concurred that every effort would be made to locate the structure utilizing the proper setbacks from the roadway right-of-way and to locate an adequate drainfield without altering the design of the developers standard duplex um t, and that upon a determination by the Health District that it is not possible to place the structure and the drai nfiel d on the si te al 1 properly north of the standard setback line, a letter would be sent to the Zom ng Ad,justor stating the same and supporting a 5 foot variance of the setback line to acconanodate the standard design duplex structure and an adequate drainfield From the Findings of Fact, the Zom ng Adjustor comes to these CONCLUSIONS 1) Lot 7 maty be indeed sufficiently disadvantaged by the slope on its north portion so as to deprive the developer of the privilege of locating the standard design duplex on the parcel and adequately accommodate a drainfield arrangement It is most desirable, however, to locate the dwelling um t behind the standard setback, and it is the intention to require this to be the case unl ess the Heal th Di strict submits a written commum cation to the Zom ng Adjustor indicating that a 5 foot variance of the front yard setback is needed in order to properly accomodate a drainfield 2) The proposal is not detrimental to and is compatible with the public health, safety and welfare 3) The subject property is deprived of privi 1 eges commonly erU oyed by other properties in the same vicinity and Zone and the granting of the variance will remedy the difference in privileges 4) The granting of the variance is not a grant of special privileges inconsistent wi th privi 1 eges enjoyed by other properties i n the vi cim ty and zone 5) The strict application of the standards of the Spokane County Zoning Ordinance deprives the subject property of rights and privileges of other properties in the area and under identical zones 6) The granting of the variance is not materially detrimental to the publ ic wel fare or injurious to property or improvements i n the vici m ty or zone in which the subject property is located DECISION From the foregoing Findings of Fact and Conclusions, the Zoning Adjustor APPROVES the proposal The following CONDITONS OF APPRUVAL are stipulated 1 . ~ FINDINGS OF FACT, CONCLUSIONS, UECISION AND CONDITIONS OF APPROVAL F ILE # VE-8-85 PAGE 3 CONDITIONS OF APPROYAL l) The granting of the 5 foot variance to the dimension as shown on the site plan contained in the file VE-8-85, shall be granted by the Zom ng Adjustor or his representative prior to the issuance of a building permit for Lot 7 upon recei pt from the Heal th District of the wri tten commum cation which describes the need to so locate the building in order to properly accommodate an adequate drainfield as associated with standard duplex design as utilized on Lots 1- 6 DATED TNIS 26th DAY OF February,, 1985 ~ ~ THOMAS G. MOS AYCP, ZONING ADJUST p SPOKANE COUNTY, WASHINGTON F ILED 1) Applicant 2) Parties of Record 3) Spokane County Engineers Office 4) Spokane County Dept of Buiiding & Safety NOTE ANY PARTY AGGRIEVED 6Y THIS DECISION MUST FILE AN APPEAL WITHIN TEN (10) CALENDAR DAYS OF THIS DATE UU53z 2/25/85 ; • ~ / / I~ i ~ / ~ ~ ,r- • ~ ~ ~ . ~ r ~ AV 40 ~ • ~ ~ Ict ~(Qv~-~~ ~ . _ ~ r ^ . , . , ~ . . 1, . , _ ~ ; y~ ~~r~ ' ~~y~, , , ~c.~ao~✓?- ~ -y~,-- a~ t Jk' C7/ J ~ ✓ t \ ~ jo . G+ G c ~ ~ ~ , ; ~ ~ ~.v►~ . ~,r~.. _ . _ • ~ ~t,. - . ~ • ~ ~ Gu r ~i~~MA, ~ ~ Vj ~ G .~,vckt ~ r •e V ' t ~ ~ ~ • ~'r~~- r► C , ~ tn r ~ ST ~ ~ 7 1 ' i - • i~r.rr~' \ ~ ' _ ~ ~ ~ ~ • 00011 L v. iamS (3 ~ ' y G T • ~ ' . : bc m o r Qpg ►r • , , z' V1 X " . . ~ ~ ' . ! ~ .r~ ~ ~ry C ' ~ . - . • ' . 1 ~0 OX •73 NOISCIW ~ > C ` . • _ . r, , _ f, , ~ ~ ~ ~ l~ . . ' ~ . . . . . r• t r ~ .1: 1 l L . ft c ! - ~ m ~ ~ r +.rf , ;%f 5 n:~~3~ti ~ ,n..S:` ~ ~ • • ~ A ~ h . ~ ~ r". Q'r N r mj • - . _ r d 1~.~ ` ~ ~ `-~1-~~t ~V^'~ri : • ~ ~ ~ . ,f . ~ . ~N IRM9 'f*t _ ' ~ a. ~ I ~ . < ~ . ~ , ~ ~~r~ ~ - • ~ - - " • ~ ~ ~ _ z s, ~ ~ ~ _ d • , , z rS ,L ~.1 ~ . _ _ . ~ : p .I~_~ ~0 .~3wJ~tv~~ ~ ' ` =3•w•._~.,.n . . ..~--:i~..r . • ~ ~R7 . a)f`~ ; y 5~~7• , ~ YO itl~w~~J►•••~ ~ O ~ r ~ • ~ G i w~~'r ~ . W . i 3 %A Dn A , Z OSb s . < • ~ ~ , Q Op /r r r - , r ^ . eT• r ~ ~i`~~"~ d ~ ~ . • ~d ~ 40 J- r,- ~ ~J~ ~'7.~ • , - ~ , • ` iN~ i ~ ~ ~ ' - r'•~ ~ y / I ~ s ~ • STAFF REPORT February Zl , 1985 TU: SPOKA14E CUUNTY h►RING EXAIr1INER COMMIT7EE SPOKANE COUNTY Z iING ADJUSTOR. FRUi+I : SPOKANE COUNTY P~NN ING DEPARThIENT STAFF RE : PREL It-l INARY SIIBD ' IS ION AND ZONE RECLASS IF ICAT ION , PE-1488-84, M IS :ON R IDGE 2ND ADD IT IOIJ ZE-6-859 Agr :ultural to R-2 VE-8-85, Yar nce 1. GENERAL INFORNIAT )N Sponsor: 928-25 . Surveyor/Engineer: 926-1322 Vi nce Sei pp Mi ctiael Phi 11 i ps S. 717 Pine Road N. 909 Argonne Road Spokane, WA )9206 - Spokane, WA 99212 Location: p the northeast intersection of University Road and • Nora Avenue n the SpokaneValley. Proposal: T, divide ten acres into eight lots. Seven (7) lots are approxii tely 13,5U0 sq.ft. in size and are proposed for R- zoning (all, s duplexes with separate ownership of each unit). Lot 8 is ap; oximately 7.5 acres in size and will remain - Agricultura y zoned. Additionally, Lot 7 as proposed is askir for a 5 ft. ariance f rom the f ront yard setback requirements c the Spokane ounty Zoning Ordinance due to a ridge through the lot which h- ders development with a standard setback. I I. S ITE PLAN INFORMATION A. Site Size: Apprc .10 acres; Lots 1 through 7= 5.6 units per acre B. Comprehensive Pli : Urban, within the Priority Sewer Service Area. C. Site Characteris! cs: The site is generally flat along the roadway and then drops ol along a sloping ridge towards Interstate 90. The site is currentlN undeveloped. . D. Neigborhood Chari teristics: The area to the south and east of the proposal is c rrently developed in duplexes along Nora. To the east of the si te t Uni versi ty are si ngl e fami ly uses. E. Zoni na: Proposal - RE lassify land presently Agricultural to R-2. Si te - R- and Agricul tural . North - Ac icultural. East - Ac icultural. South - R- . West - Ag cultural Suburban. - 16 - • ■ E 1488 84 . - - - - - - . ' i . . . . ...1........ i ' ~ , , , . . . , . ~ j j ' I i I ~ i ~ ~ i ~ ~ ~ i • ~ ~ ; I I ~ ' ` ~ ~i ; ~ ' I ~ ' ~ ~ i ~ i ! } ~ ~ ~ ~ • ; ~ ' : ~ 1 ~ , I 1 ~ ~ ` I ~ I ~x ~ ; I 1 I ~ I I ~ C( I I ! • ~ ~ 1i ~ i ~ ! ~ ! ' ~ ' I . . " 'r-~+~-~a ~ ' ,....1.. ..f. .l ...1....i.....~.....~...1.....i....l..... ....J..... ~ i ~ i . ; ~ . , i. , T. I... , . ~ ..i . I . I .r.. .I.......... r..~.. ~ N ~jj I 0 ~ i4 !S E I ~ • . . I._. ~ . _1 _ . _ . ..L,... I.. . I ..1....=..... y ~►r ~•.~e' ~ i . . , . . it M I ~ w ~ dt 10. ~f" ~ ~ ~ - _ ~ _ - ►r'~ - . , bcar t ~ I ( I y~fr,~V ~-d,[ I,q/ AdDirKM1 i 1 • ~ EcOCa Ir r~ I ~ i ~ I j \ \ ~ --~-----r-----~-----+, i i~ ~ w \ \ \ ~ • ~ N ~ ~ rK~Mrr ~w ltl~t MISSION RIDGE SECOND ADDITION tcY17 PiercrMrNaar ALAr S, rC DATA TIC1fM4~ilrS56 L ~o► +tt ` ~.ro c~ ,~rr w ~~n ~ ~ • ~ i ~ SW yI ~ !fC 5115N, PIdlK'- /vcv i i ew r• ar MwAw rdrhu un , y.wss W+e49 tas 004rr110 rd r e+r ob rps I ~.w +WA 'C•e iw~+wryt « 4 w inw rr «url r~+a nu a r~um N,10l~MGOHME ROAD /41' 12b 1322 ' fwr~~t ~~w wu. ~rNi~~ivi~~~ N) rr~rifW y,~~~! •f/ I+11 . Uw M,46 art M "WVt~IE D40~~~+ ~ I • STA1=F REPUkT, February 21, 1985 PE-1488-84, MISS ION R IDLE 214U ADD ITION II. SITE PLAW INFURhIATION (cont'd) h. Special Information (cont'd) F. Land Use: Site - Vacant. North - I-9U. East - Generally duplex development. South - Duplexes. West - Si ngl e fami 1y. G. Comprehensive Plan Designation: The proposal is in general accord with the use and density of the Spokane County Comprehensive Plan for the Urban category. H. Speci al Informati on : Circulation - Access to the site will be f rom University road and Nora. Design - The proposed R-2 lots are consistent in size, frontage and access as the existing duplex development. ~ To o ra h- The site slopes downward between Nora and the Freeway which will require site design consideration in the location of building land drainfield sites. County-Health recommendations indicate that the proposed setbacks on Lot 7 may not be feasible. Water Supply - Modern Electric Water Go.will provide water. An approved water Plan will be required prior to finalizing this prel imi nary pl at. Sewage Disposal - On-site systems may be authorized subject to County heal th Di stri ct approval. I School - The proposal is in the Central Valley School District #356. Cultural Resources - None have been identified ~ III. HISTORY/ANALYSIS The proposal is similar to 14ission Ridge lst Addition immediately to the south. The development of Lot 8 which comprises 7.5 acres will not be buildable at this time due to its lack of public f rontage. Greater than normal building setbacks f rom the road may be required due to the ridge line that traverses Lots 1 through 7. - 18 - • STAFF REPORT, February 21, 19b5 PE-1488-84, MISSION RIDGE 2ND ADDITIUN IV. ENVIRONMENTAL REVIEW An Environmental Checklist has been reviewed by the County Planning Uepartment staff. The review connsidered the specifics of the proposal, County ordinances and other regulations. County Planning Department has determined that "No probable significant adverse impacts" would result from the proposal being developed and has issued a Determination of Non-Significance ("DNS"). The Hearing Examiner Committee may consider additional environmental related testimony and the "UNS" at the public hearing. V. LEAD AGENCY SUMMARY The proposal appears consistent with the Comprehensive Plan Urban Category and development in the irrtimmediate vicinity. YI. CONDITIONS OF APPROVAL If approval is granted, the following conditions are reconmended. COUNTY PLANNING DEPARTMENT 1. That the Final Plat be designed substantially in conforniance with the*preliminary plat of record as legally described and advertised. No increase of density or lot number shall occur without prior approval of the Hearing Examiner Committee. 2. That the preliminary plat be given conditional approval for three (3) years to March 1, 1988.. The applicant may request an Extension of Time by submitting a written request forty-five (45) days prior to the above expiration date. 3. The Spokane County Subdivision Administrator shall review any proposed final plat to insure compliance with the findings and conditions of the Spokane County Hearing Examiner Comnnittee. 4. That the provisions of SEPA'S NOTICE OF ACTION pursuant to Chapter 43.21C,080 RCW be initiated by the project applicant within thirty (30) days of final disposition of this application, and prior to any on-site improvements unless the applicant(s)/sponsor(s) choose to file a notarized Waiver of Notice of Action with the Spokane County Planning Department. 5. That a Final Plat name be indicated before the final plat is filed; such name to be approved by the County Assessor and the Planning staff. 6. That appropriate names be indicated and approved by the County Subdivision Administrator. - - 19 - ' STAFF REPORT, February 21, 1985 PE-1488-84, MISSION RIDGE 2ND ADDITION VI. CONDITIONS OF APPROVAL (Cont'd) County Planning Department (Cont'd) 7. That appropriate utility easements be indicated on copies of the approved preliminary plat, for distribution to the County Planning Department and all applicable utility companies. Written approval of said utility easements by said utility companies must be received with the submittal of the final plat. 8. That a current certificate of title be furnished the County Planning Department prior to filing the final plat. 9. Upon filing the Final Plat the zone change of the Final Plat area shall be finalized and the existing Agricultural zone classification shall be changed to R-2 for Lots 1 through 7. Lot 8 shall remain Agriculturally zoned and be designated non-buildable. 10. That a pl an for water faci 1 i ti es adequate for f i re protecti on be approved by the water supplier, fire protection district, Spokane County Building & Safety Department and County Health authorities. The agencies will certify on said WATER PLAN, prior to the filing of the final plat or any phase of the preliminary plat that the plan is in conformance with their respective needs and regulations. The WATER PLAN and certification will be drafted on a transparency suitable for reproduction. The purveyor will also certify that appropriate contractual arrangements and schedule of improvements have been made with the plat sponsor for construction of the water system in accordance with the approved WATER PLAN. The time schedule will provide for completion of the water system and inspection by the appropriate health authorities prior to application for building permits within the final plat. The arrangements or agreements will include a provision holding Spokane County and the purveyor harmless from claims by any lot purchaser refused a building permit due to the failure of the plat sponsor to satisfactorily complete the approved water system. The plat sponsor shall also sign said WATER PLAN to conform the contractual arrangements or agreements. The final plat dedication will contain the following statement: "the public water system, pursuant the WATER PLAN approved by County and State health authorities, the local fire district, County Building & Safety Department, and water purveyor, will be installed within this plat, and the subdivider/sponsor will provide for individual domestic water service as well as fire protection to each lot prior to sale of each lot and prior to issuance of a building permit for each lot." - - 20 - STAFF REPORT, February 21, 1985 PE-1488-84, MISSION RIDGE 2ND AODITION VI. CONDITIONS OF APPROVAL County Planning Department (Cont'd) 11. That no building permit will be issued for any lot within the Final Plat until certified by a Washington State licensed engineer uthat the water system has been installed pursuant the approved WATER PLAN for the Flnal Plat", signed and stamped by said engineer. The ce rtification may be in the form of a letter but is preferred to be certified on a copy of said WATER PLAN as a schematic map showing the "As Built" water plan. COUNTY ENGINEER DEPARTMENT 12. That conditional approval of the plat is given subject to dedication of Right-of-Way and approval of the road system as indicated in the preliminary plat of record. 13. A statement must appear in the dedicatory language of the final plat: "that individual driveway access permits be required prior to issuance of a building permit for driveway approaches to the County road system." 14. Dedication of 30 ft. additional Right of Way along University Road. 15. A statment shall be placed in plat dedication that no direct access be allowed f rom o University Road. ; 6. Existing County roads providing direct access xo the pla shall be paved and curbed to SPokane CountY standards '4-0~ , , J7. That Public Road Standard TYPICAL Roadway Section be:"Section Number 2 for Uni versi ty Road wi th Maj or Arteri al Standard. " 08. The word "appl icant" shal 1 i ncl ude the owner or owners of the property, hi s hei rs, assi gns and successors. r. . 19. To construct the road improvements stated herein, the applicant may, with the approval of the County Engineer, join in and be a willing participant in any petition or resolution which purposes is the formation of a Road Improvement District (RID) for said improvements pursuant to RCW 36.88, as amended. At such time as an RID is created or any Road Improvement Project is sanctioned by Spokane County, the Improvements required (curb, sidewalk, drainage control and paving to existing pavement) will be at the sole expense of the undersigned owner, their heirs, grantees and assigns. - 21 - STAFF REPORT, February 21, 1985 PE-1488-84, MISSION RIDGE 2ND ADUITION VI. CONDITIONS OF APPROVAL (Cont'd) County Engineer Department (Cont'd) 20. As an alternative method of constructing the road improvement stated herein, the aplicant may, with the approval of the County Engineer, accomplish the road improvements stated herein by joining and participating in a County Road project (CRP) to the extent of the required road improvement. At such time as a RID is created or any Road Improvement Project is sanctioned by Spokane County, the Improvements required (curb, sidewalk, drainage control and paving to existing pavement) will be at the sole expense of the undersigned owner, their heirs, grantees and assigns. 21 That the following statement be placed in the plat dedication: The owners, their heirs, grantees and assigns, agree to join in the formation of a County Road Improvement District pursuant to RCW 36.88 at such time as a Road Improvement District is created or any Road Improvement Project is sanctioned by Spokane County. The improvements required (curb, sidewalk, drainage control and paving) will be at the sole expense of the owner, their heirs, grantees and assigns. 22. The proposed plat shall be improved to the standards set forth in Spokane County Board of Commissioners Resolution No. 8U-1592, as amended, which establishes regulations for roads, approaches, drainage, and fees in new construction. 23. That the County Engineer has examined this development proposal and has determined that the impacts of this proposal upon the existing County Road System warrants the roadway improvements herein speci fied. ` ~ i r . • ' ~2 /f `t ^ ~ ~ -cy C~~_,~ COUNTY UTIL ITIES DEPARTfhENT ~ 24. The dedication shall state: NThe Owner(s) or Successor(s) in interest agree to authorize the County to place their name(s) on a petition for the formation of ULID by petition method pursuant to RCW 36.94 which the petition includes the Owner(s) property and further not to object by the signing of a protest petition against the formation of a ULID by resolution method pursuant to RCW Chapter 36.94 which includes the Owner(s) property. PROVIUED, this condition shall not prohibit the Owner(s) or Successor(s) from objection to any assessment(s) on the property as a result of improvements called for i n conj uncti on wi th the formati on of a UL ID by ei ther peti ti on or resolution method under RCW Chapter 36.94." 25. Any water service for this project shall be provided in accordance with the Coordinated Water System Plan for Spokane County, as amended. 26. The dedication shall state: "Each dwelling unit shall be double plumbed for connection to future area-wide collection systems." - 22 - , ' STAFF REPORT, February 21, 1985 PE-1488-84, h1ISSI0N RIDGE 2N0 ADUITION VI. CONDITIONS OF APPROVAL (Cont'd) COUNTY HEALTN UISTRICT 27. A combined surface water and sewage disposal detailed plan shall be approved by the County Engineer and the Spokane County Health District prior to the issuance of any building permit for this project. ~ . ~ 28, he dedicatory language of the final plat will state that: "Subject -q o speci f i c appl i cati on approval and i ssuance of permi ts by the ' ~ealth Officer the use of an individual on- it w t , , s e se age system may t` be authori zed. "No_to ~BeE-au-se---o-f_ the "break'"--i-fl--t4te--temraphy toward the north, a minimum 63 ft. front yard setback (from road centerline) should be provided on Lots 6& 7 to accommodate drai n,f_i el ds -.an- the southern porti ons of the--Tflt: 290 The dedicatory language -on the plat shall state: "Use of private wells and water systems is prohibited." 30. The plat dedication will contain a statement to the effect that: "The public water sy stem as approved by County and State health authorities and the local fire district and purveyor will be installed within this plat, and the subdivider will provide for individual domestic water service as well as fire protection to each lot prior to sale of each lot." 31. Prior to filing the final plat, the sponsor shall demonstrate to the satisfaction of the Spokane County Health District that a suitable site for an on-site sewage disposal system is available on Lots 1 through 7. COUNTY BU ILD ING & SAFETY DEPART14ENT 32. The applicant or successor prepare the Water Plan for this site in conformance with standards of Spokane County Uniform Fire Code, as amended. AIR POLLUTION CONTROL AUTHORITY ~ 33. Air pollution regulations require that dust emissions during demolition, excavation and construction projects be controlled. I This may require use of water sprays, tarps, sprinklers, or suspension of activity during certain weather conditions. Haul roads should be treated and emissions from the transfer of earthern material must be controlled as well as emissions f rom all other construction related activities. 34. All air pollution regulations must be met. -23- , . . ' + * * * * PUBL IC IVOT ICE * * * * h~~.-~~►~~ . GC31U,1. X*lr ~ HEARING EXAMINER COMMITTEE PUBL IC HEARING FEBRUARY 21 , 1985 ' PLACE: Broadway Ceritre Bui 1 ding 2nd Floor, Public Hearing Room N. 721 Jefferson St., Spokane, WA 99260 SYOMAm( cau" „ cou., »a„sc Tel ephone : 456-2205 TIME: The' hearing wi 11 begin at 9 A.M. and recess f rom 12 NOON to 1: 30 P. M. fo r 1 urich . I tems not heard prior to 5 P.M. adjournment wi 11 be coriti nued to the next avai 1 abl e date as arinounced by the Chai rman of the Hearing Exami ne r Commi ttee . HEARING AGENDA, February 21, 1985 9 A.M. (or as soon thereafter as possible) PRELIMINARY SUBDIVISION AND ZONE RECLASSIFICATION l. PE-1488-84, MISSION RIDGE 2N0 ADDITION . . . . . . . . . . . . . page 4 ZE-6-85 & A9ri cu fturaFto R--2 VE-8-85 Sponsor: 928-20*92 Su rveyo r/ En gi nee r: 926-1322 Vince Seipp Michael Phillips S. 717 Piries i:d. N. 909 Argonne Rd. Spuicarie, 4Ja 9~.j2J6 Spokane, WA 99212 Location: At the northeast intersection of University Road arid Nor-a Avenue in the Spokane Valley. Section 9, Township 25, Range 44, Spoka!ia County. Compreherisive Plan: URdAN, withirl the Priority Sewer Service Area. P roposal : To di vi de ten acres i nto ei ght 1 ots . Severi (7) 1 ots are approximately 13,500 square feet in size and are proposed for R-2 zoning (allows duplexes with separate ownership of each urlit). Lot 8 is approximately 7.5 acres in size arid will remairi Agriculturally zoned. Additionally, Lot 7 as proposed is askirig for a 5' vari arice from the frorit yard setback requi rements of the Spokarie County Zoriing Ordiriance due to a ridge through the lot which hiriders development with a staridard setback. AGENDA, February 21, 1985 - HEARING EXAMINER COMMITTEE PRELIMINARY SUBDIVISION AND ZONE RECLASSIFICATION 2. PE-1484-84, ALCOTT GROVE 1ST ADDITION . . . . . . . . . . . . page 5 ZE-4-859 Mining and Agricultural to R-2 Sponso r: 32 7-9512 Su rve,Xo r/Engi nee r: 32 7- 7793 Pete Rayno r Ge ral d Mas gai W. 814 Ros ewoo d N. 2919 Mon roe Spokane, WA 99208 Spokane, WA 99205 Location: Between 8th and 12th Avenues, lying acjacent to and westerly of Carnahan Street in Section 23, Township 25, Range 43, Spokane County. Comprehensive Plan: URBAN, within the Priority Sewer Service Area. Proposal: To establish 29 residential lots for single family or duplex use. One lot is desi gnated as open space. The appl i cant i ndi cates a possi bi 1 i ty -of Ci ty of Spokane Sewer Servi ce. CHAiiGE OF CONDITIONS 3. PE-116D-789 MIDILOME 4TH ADDITION . . . . . . . . . . . . . . page 6 ZE-13-781, Change of 24 lots to R-2 zonirig Sporisor: 624-9131 Surveyor/Engineer: 926-1322 MIDILOME INC., Mike Phillips c/o Ed Bueshke N. 909 Argonne Rd. W. 606 3rd Ave. Spokane, WA 99212 Spokane, WA 99201 Locati on : The proposed R-2 zoni ng woul d be si tuated adjacent to arid westerly of Pines Road between 32nd and 40th Avenue. Comprehensi ve Pl an: URBAN, wi thin the Pri ori ty Sewer Servi ce Area. P ropos al : To cl assi fy 24 1 ots of Mi di 1 ome 4th Addi ti on to R-2 zoning from the previously approved R-1 zone. The appl i cant anti ci pates dupl ex devel opment of the 1 ots wi th in di vi dual uni ts owned by the occupant as a single family attached structure. 2 I a AGENDA, February 21, 1985 - HEARING EXAMINER COMMITTEE PRELIMINARY SUBDIVISION AND ZONE RECLASSIFICATION 1:30 P.M. (or as soon thereafter as possible) 4. PS-1487-849 BROWNE PARK TERRACE . . . . . . . . . . . . . . . page 7 ZS-5-849 Agri cul tural to R-1 Sponsor: 448-8877 Surve.Xor/En gineer: 467-0694 Patri ck Phalon Ri chard Maln Rt 12 Box 748 N. 7721 Whitehouse Spokane, WA 99203 Spokane, WA 99208 Locataon: Generally ad,jacent to and north of 61st Avenue, ending approximately 500' south of 57th Avenue, further lying ad,jacent to and easterly of Dearborn Street extending approximately 300' easterly of Custer Street. Comprehensi ve P1 an: SUBURBAN, within the Priority Sewer Servi ce Area. Propos al : To establ i sh 17 1 ots , each of approxi mately one (1) acre in size in the Moran Prairie area. The site consists of 16.3 acres. Zoning i s proposed to be R-1 (Singl e Fami ly Resi denti al 5 P.M. - ADJOURNMENT NOTE: The Hearing Examiner Committee members usually make a site inspection, indivi dually, or as a comrnittee. Contact the County Pl anning Department for when the Hearing Examiner is going to view the site. Envi rorimental review of the project and project site is made and a pre- liminary decision regarding environmental impacts will be presented to the Hearing Examiner Corrmittee. The publi c hearing wi 11 afford the . opportunity to present information as to whether or not a probable SIGNIFICANT ADVERSE i mpact upon the physi cal envi ronment wi 11 resul t from implementation of the proposal. The legal description and details of the p►roject are on file arid available i n the Spokane County Pl anning Department, Broadway Centre Bl dg. , 2nd fl oo r, N. 721 Jeffe rson St. , Spokane, WA 99260 ( tel ephone : 456-2205 3 ~ y , I . a - ~ ~ c _ - ~ ~ ~ ~ ~r.~ • ~ s ~ . . ~ ~ - - . P ~ • ' ~ ~ ~ ~ . ~ ~ - ~ i ' J I► ~ O O ~ . - ' 45CJ ? BuCK E Y E • ~ M A ~ > , ; . a ~ ~ ► ? ,~:•S ti E a,4 ~ : y' . r T ~ r~ L F T oA • . ~ ~ ir~~rrn . ~ O er~. ~.r~Ez I w~~TG('►~Ep'' G~ ~ Y . . ~l' : ~ ~"r' / p ~ 1 r > '-p , D 1 " t ,E • m ~ ~ ~ . . IM . r o4Q~A • . . . r . , , - - i. ~~'1-~y''~'ti ~ ~UN.aIL .A' FEZ s M A N N O N ~M~•~ ~ , ~ _ i: 1► I +j► _ J'- - ' - • - ~ ' ~r~.~ 1A N' I v - J l . • ' L:~ _ _ crT 7 '~.o o a: ~c~.:~ ~ r , • ~ ~ , ` M I-9 S I O N , 'M '"""'r~T - . ..t:.,a• ~ 'r~~ ~ ` - - - (J • ~x"A ~ ~ ~ r G w,.f E L l. wt► ~ - , ~ ~ a . . , ~ ~ 2►. 800 N E - . ~ tn ~ j~ w rot~ - , ~ 1,► ~ : . . ~ ' a O SNCT .LbT A L Q O • ~ ~ir , • - i . ~ ~ , ~ - 1:1000 _w..~.,.r. . . . . _ . r 4 r 6 • ~ ~ - . 0/ . . . ~ ~ .~r~, . r r ~T~.. I'►+ ♦L~ ~ ~ % ' f '1 , e- '"E ~ 1936 _SPRAG ~ * • ~ O Jt ~ xT ~ ~ J - - ~ ~ ~ ► - ~ ~ ~ + e c.A Fl p It ni 4 r ~ , ~ . v • ~ ' S 9 4'? ~s + 6 . ~ J l~ f, y Cr ► T h Qy g ~ r~w• , 4 : ~!+r~ s~.!T~ rs+.~ :r- • `_..~n- • . ' r 23 ~ , ~ ~ l • ~ ~ t AZo lorH_ i ~ v~ 1484m84= 12 f ZE=4=85 -3 l . ~ ~ 113 f H T rl - r r ~J Trr ` y 14T H _ : J 66 r -,.7~ jI l(OT" T ~ . . ..~1.~ • ~ . . . ~ i, ~ 'Z ~ . ~ - 0, W t ~I ~ W V ~ r, r , rw -4 ! I 4 i T~"~ ~ C+ - tt1 ~ ~ ~:1()QO TYVENTY F,P'- r ~✓E. ~ ~ - 5 . • . . .+~r .+r1 V f ~ 16 JLA * . ~ ON E. TM AV E _ • `r+' T .,r ~ . . ~E . . ~ = er+ i,2'go T srv -~Lv E ~ 3~ o ~ ' °1►, ' ~T,~ ~J 4L a I ' ' tF1 tj4b A C ' ~ • ~ iG - . A51 E ~ . . j ~ ~ .4 ei. A E. - ~ mwl . ,r ~ ~ ` . ~ ~ • ~ L' ~1~r3~~~' ~ ~ ' I~ / s w. 't ir . + ~ • ^ ~ r r) T ~ V ~ ~ 11 r . . . ~~ti•rl;~.w~:r~ f r Q • ~r l~ ~•frI ~ k~' ~ n # 9 . 'F~ ■ 4 ` 4' 11 ~ ~V } + ~ •a T ~i i • / ~ a ~ r ~ ~ . -prmt _ CO) cr- L ~ < > s ? . - , _ ~ ~ 34 . , ~ ~,a 7 . ~ 4 1 ~ ZE' 1-3i78 1; Btt Mo 4" ' ~ r e' : ` _M~S i • \ 6th St(]^I F ~ . . . . . . ~ « ~w+ ~ L ~ .w~~ . nc y~ PE , ~ • 4'~rr L1 ' ~ . t . ~ . i r ~ • 1O0U - , `'~i„ ~ ~ + a f 6 ~ V 1 S-o~ ~ ; . n~, o o ; Y a I ~ ` $or ~ i wkNETA 83 i 4 fr4 ` ~ ~ ~ I ' ~ 8EN BuRD. ► I ~tiMH~~ • I C u A a ~ -4 ( .4 x O z ~ z I m D ~ R OAO M 1'ANa ` , G ~~NROSE. M. . YA I , ~ S . ~ - . . ~ t m sTaEET C~ DE ARRORI- ` ~ ~ i LorD ~ ' 1 spuok t ~~,~r" 1~.0'►: 0 j ;r D ` n! a Z ~ ttA ~i tuSTEA S1. ' " - • C U S t E wlllAMtlli S1 ~ :4b ~j . • SuMAt ` , , , d irz / ' • ~ ~ _ ~ • . . . O r` • ~ ' • ♦ • ♦ ~ O , ~ ' , \ ~ , \ •t'. ♦ , : ~ , ~ ` I ~ ~ ~ ~ , . , / ~ • , . . p ~:i.. ~ ~ . ~ ~ A PA.- q SPOKANE COUNTY PLANNING DEPARTME~T ~ APPLICATIONS BEFORE THE ZONING ADJUSTOR/BOARD OF AOJU ve Ce rti f i cate of Exemption No Appl icati on No Name of Appl i cant ~~~r..1~►~~ ~'e. -CILNM.tir Wai Street Address S '1 1-1 PA *Rop%T.,*A . Cl ty 15%4A4,M State V-14~ Zi p Code 91!~20C,Q„ Tel e No N ame o f P rope rty Owne r( s) Requested Action(s) (Circle Appropriate Action) S1 FAaNT YWRD SETF3/qCK CT riance Conditional Use Permit e r y Permi t Waiver of Viol ation 4mmw VAR/ANGr tero Lot Line Non-Conforming Lot/Use LOT 7 OKLY QF - 'f 4 * FOR STAFF USE ONLY * * Cite 0 rdinance Section ~ Section ~ Township ~ Range ~ Property Size * Existinq Zontng Compre hens ve 1 an Des i9n ation lftmN * * * * * Legal Checked by Hearing Date Receipt #~~1~ * * Existing Use of Property 461 ( V 'T ~ Proposed Use of Property R=2- Street Address of Property C.~~ =•~i`~ Leqal Des cri pti on of P roperty ( i n 1 ude easement i f appl i cabl e) . ' Parcel # Source of Legal Total amount of adjoining land controlled by this owner/sponsor - ~ ~ What interest do you hold in the property e 7- e) ~ A/( ~ Please list previous Planning Department actions involving this property I SWEAR THAT I AM THE OWNER OF RECORD OR AUTHORIZED AGENT FOR THE PROPOSED SITE IF NOT THE OWNER, WRITTEN PERMISSION FROM SAID OWNER AUTHORIZING MY ACTIONS ON HIS/ HER BEHALF IS ATTACHED /V ~ Si gned ~ I d!" ~ ' te Address-'T Aee Phone No ~6, - °2 NOTARY-~Ekk NOTARY ~ _ DATE I12-4- I~ 5 ~ ~ . ~ A VARIANCES ` 1 In view of the above info rmation, what special circumstances (beyond you r control or actions ) depri ve you of the same general rights and privil eges of other property owners within the same zone and vicinity? - • &CL-ttP STLacTvZgr ~ 2 If the variance were ranted, how woul d it affect neighboring properties or improvements? W= LtjVr.Tj %'r_ CONDITIONAL USES, ZERO LOT LINE, NON-CONFORMING USE, TEMPORARY PERMITS, ETC , 0 1 Please give a concise explanation of the proposal including size, hours of operation, expected traffic and other features, etc WAIVER OF VIOLATION 1 How or why was the structure established outside the provisions of the Spokane County Zoning Ordinance? D SIGN-OFF BY COUNTY DEPARTMENTS 1 COUNTY HEALTH DISTRICT A preliminary consultation has been held to discuss the prnp al The appl i cant has been informed of requirements and standards ( Signature) ( Date ) ign-off Wai ved by P1 anning Staff) 2 COUNTY ENGINEER' S DEPARTMENT A preliminary consultation has been held to discuss the proSal The appl icant has been informed of requirements and standards (Signature) (Date) Sign-off Waived by P1 anni ng Staff ) 3 COU«TY UTILITIES DEPARTMENT A preliminary consultation has been held to discuss the propft" 1 he aPPlicant has been informed of requirements and standards ( Si gnature ) ( Date ) S gn-off Wai ved by Planning Staff) WATER PURUEYOR (if applicable) Name - - a) The propos al i s/ i s not 1 ocated withi n the boundary of oFveN__h1 sQ rv1 ce area b) We are/ are not abl e to serve thi s site wi th adequate wa , , c} Satisfactory arrangements have/have not been made ~o se `roposal ~ (Si gnature ) ( Date ) CSign-Qf 0ved by P1 ann ing Staff ) ` F .la NAME 2-1 IA' N4 FILE # 95 I VARIANCES The County Zoning Ordinance, Section 4 03 020 (64). cl arifies that vari an ce is an adjustment made to a "dimensional" regul ati on Websters New Collegiate Dictioriary (1979) defines "dimension" as a me as u re in one dire ct ion A State Law (36 70 020 (14) RCW) Is the subject property deprived of privileges commonly enjoyed by other properties in same vicinity and zone and does the vari ance remedy the di fference in pri vileges? (Must find positi vely) ~ 's B Zoning Ordinance (Section 4 25 030 b) Is the vartance a grant of special privile einconsistent witfi limttations on other properties in the V1Clntty and zone? ?Must find negatzvely) Q 1) AND because of speclal circumstances appl i cable to subject property, does strict application of Zoning Ordinance deprlve subject property of rights/ privileges enjoyed by other properties in area under IDENTICAL zones? (Must ftnd positivelyl 2) AND wi11 grdnt1ng of tfie variance be material ly detri mental to publ ic welfare OR injurious to property or lmprovements in the vicinity and zone in which subject property ts located? (Must firid negatively in at least one instance) ~ r` ~ I i S - ; ~ ~ I ~ ~ ~~J ~~..~~~r 1.. •-+r~~~~.~.~!'r ~ ~ - - - ~ ~ ~ ,r' • ~ ' sM , ~ i~ ~ / ~ ~ ~ ~ • • i n~I A1r►~ i C~ J ~s ~ .:7..~ ~ Y f do ~ ~ • ~.r ~ ~ 4 ~ e JI l ~ ♦ ~ ~ ~ • ~ r~~~~~~~r.~~~~ •~w~~► , ~ ~ ~ ~ ~ ~ ~ ~ r ~ ~ ~ ~ ~ r ~ ~ • ~ ~ ~ r ~ ~ ~ • ~ w. ~ ~ ~ ~ ~-~i f ~ 1 ~ 1 ~ + • ~ ~ ~ ~ ~ ~r ~ ~ r ' , s~ ~ ~ ~ ~~M ~ N rr ~ ~ ~ ~ ~ ~ ~ • ~ ~ ~ ~ • • ~ ~ Pr 1 ~ t 1 ~ ~r..r ~~~.r ~w~~~~~~~~►~~~~~, ~ LQ ~~•~.r~•*~w~' ,~~.~~r~~~r.~~~►~~~~~•ar.~~~~~~~~~+~~~ ~ ~ - h+~ • ~ ~ iz M ~ _ _ - - - - - - - - . s bo ,