2012, 11-06 Permit: SW-12002516 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002516
Permit Issued Date:
11/06/2012
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: CORBIN
Permit Type: SEWER
Primary Contact. POOL CONSTRUCTION
Applicant. POOL CONSTRUCTION
Address 18902 E 2ND AVE
SPOKANE VALLEY, WA 99027
Phone 509-979-5872
Email.
SITE INFORMATION:
Site Address:
Parcel Number:
18917 E BLOOM CIR
55173.2104
Subdivision: CORBIN ADDITION
Assessor's Description: LA BERRY MOBILE PARK L4 B2
Inspection Area:
Water District:
Consolidated Irrigation
District #19
Zoning: Land Area. 9020 Square Feet
Owner. SELBY, VANESSA R
Address: PO BOX 745
GREENACRES, WA 99016
Phone:
Email:
Fire District: Spokane Valley Fire
CONTRACTOR INFORMATION:
General Contractor
POULCC*932B0
POUL CONSTRUCTION
18902 E 2ND AVE
SPOKANE VALLEY, WA 99027
509-979-5872
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125 00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS'
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY
Date Printed' 11/06/2012 101820
Printed by. 115 APPP00L\ASP NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002516 11/06/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8.30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER 15 RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed' 11/06/2012 10:18'20