2012, 10-08 Permit: SW-12002340 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number. SW -12002340
' Permit Issued Date:
10/08/2012
Expiration Date:
Project Description: SEWER ALTERATION TO EXISTING SEWER
Project Name: WOLFCREST ULID
Permit Type: SEWER
Primary Contact. MOREHEAD, WILLIAM & SHERRY
Applicant. MOREHEAD, WILLIAM & SHERRY
Address. 1501 S BLAKE RD
SPOKANE, WA 99216
Phone.
Email
SITE INFORMATION:
Site Address: 1501 S BLAKE RD Owner: MOREHEAD, WILLIAM & SHERRY
Parcel Number 45224.2572 Address: 1501 S BLAKE RD
SPOKANE, WA 99216
Subdivision: Phone:
Assessor's Description: VERA PT OF B180 S13OFT OF N390FT OF W1/2 Email:
EXC W25FT
Inspection Area.
Water District: Vera Fire District. Spokane Valley Fire
Irrigation District #15
Zoning: Land Area. 39000 Square Feet
CONTRACTOR INFORMATION'
Owner Acting As Builder
OWNER
OWNER ACTING AS BUILDER
SAME AS SITE ADDRESS
SAME, WA 00000
509-475-7648
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER ALTERATION TO EXISTING 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 10108/2012 11:54:26
Printed by: IIS APPPOOLtASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002340 10/08/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19 122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 10/08/2012 11 54 26
Printed by: IIS APPPOOLV.SP.NET v4.0