Loading...
14-125.00 Michael Terrell Landscape Architect: Discovery Playground CONTRACT AMENDMENT FOR THE AGREEMENT BETWEEN THE CITY OF SPOKANE VALLEY AND MICHAEL TERRELL LANDSCAPE ARCHITECT Contract #CO14-014 For good and valuable consideration, the legal sufficiency of which is hereby acknowledged, City and the Michael Terrell Landscape Architect mutually agree as follows: 1. Purpose: This Amendment is for the Contract for Discovery Playground Consulting by and between the Parties, executed by the Parties on February 4, 2014, and which terminates on August 31, 2014. Total compensation under the Original Contract is not to exceed $4,000.00. Said contract shall be referred to as the"Original Contract" and its terms are hereby incorporated by reference. 2. Original Contract Provisions: The Parties agree to continue to abide by those terms and conditions of the Original Contract, dated February 4, 2014, and any amendments thereto, which are not specifically modified by this Amendment. 3. Amendment Provisions: This Amendment is subject to the following amended provisions, which are attached hereto as Appendix "A." All such amendment provisions are hereby incorporated by reference herein and shall control over any conflicting provisions of the Original Contract, including any previous amendments thereto. 4. Compensation Amendment History: This is Amendment#1 of the Original Contract and the history of amendments to the Michael Terrell Landscape Architect's compensation is as follows: Date Compensation Original Contract Amount 2/4/14 $4,000.00 Amendment#1 7/22/14 $1,425.00 Total Amended Compensation $5,425.00 1 The parties have executed this Amendment to the Original Contract thi�' day of July 2014. CITY OF SPOKANE VALLEY: MICHAEL TERRELL LAND APE ARCHITECT: 4 / Mike Jack ,' : ichael Te -1 City Manager Its: Authorized Representative ATTES : APPROVED AS TO FORM: pstidthhristine Bainbridge, City Cle Office o 'he City A y 2 AntIOIX A Michael Terrell ■ Landscape Architect 5312 South Chapman Road Greenacres, WA 99016 Date: July 10, 2014 Client: City of Spokane Valley, WA Phone: (509) 720-5400 Contact: Mr. Mike Stone Fax: (509) 688-0188 Address: 2426 N. Discovery Place Spokane Valley, Washington 99216 Project: Discovery Playground - Construction Administration Address: 2426 N. Discovery Place Spokane Valley, Washington 99216 Michael Terrell ■ Landscape Architect Agrees To Perform The Following Scope of Services: Tasks Fees II. Bidding and Construction Administration A. Construction Administration: Review / process Contractor's submittals and other documents that includes, but is not limited to: shop drawings, product and material data and requests for information/clarifications (RFI's). Services shall include providing responses to Contractor as necessary, review of Owner-prepared change order proposal forms, and reviewing Contractor's proposed costs of Owner-approved changes in the work. B. Conduct a maximum of four (4) site visits to review the progress of the Work and/or attend project meetings as requested by the Owner. Task shall include preparing a written report of each site visit and issuing copies to all concerned parties. Site observations include: a. Substantial and Final Completion. Conduct site visits to prepare a separate 'punch list' of incorrect and/or incomplete work. Transmit 'punch list' to Contractor for review, correction and comment. Prepare 'punch list' for Substantial and Final Completion. C. Review Operation and Maintenance manuals prepared by Contractor. D. Review record documents prepared by the Contractor. PROPOSAL AND CONTRACT Project:Discovery Playground Consulting-Construction Administration 1 Project#:14-007 Client: City of Spokane Valley Subtotal: $1,350.00 Expenses: Printing, etc. $75.00 Total' $1,425 00. NOTE: The above fee is based on an estimate of hours to complete the proposed Scope of Services at our current hourly rates. For services not listed as optional or included in this proposal see "Extended Services". EXTENDED LANDSCAPE DESIGN SERVICES The following services are not included in the Scope of Services or fee and will be performed or coordinated as directed and authorized by the "client" at our current hourly rates or a negotiated fee if required. • Revisions to previously approved work. • Additional meetings, presentations, or site visits other than those listed in the Scope of Services. • Fountain and water features; mechanical, plumbing, and hydraulics consultants. • Design of retaining walls over four feet (4') in height. • Survey of property • Utility design • Entitlements: peri•' - •lannin• . • • • als Signature: /i_4, Date: 7/10/14 Michael D. 14 e, ASLA V Michael T,"re- rell ■ Landscape Architect. Acceptance Of Proposal: I have read the above proposal, fees, and terms and they are hereby accepted. Michael Terrell ■ Landscape Architect is authorized to commence work as specified and agreed to herein. Signature: Date: PROPOSAL AND CONTRACT Project:Discovery Playground Consulting-Construction Administration 2 Project#:14-007 Client:City of Spokane Valley