Loading...
14-133.00 Spokane Rock Products: Appleway Street Preservation141 DEPARTMENT OF PUBLIC WORKS' CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 14-028 PROJECT: Appreway BIvd'Street Preservation Project CONTRACTOR: Spokane Rock Products, Inc. PROJECT NO: 202 CHANGE ORDER NO: 3 CONTRACT DATE: 6/18/2014 DESCRIPTION OF CHANGES This Change Order adds curb, sidewalk and pedestrian ramp work on the northwest corner of Bradley Rd and Appleway Blvd, The changes are shown on the attached Plan sheets 4 and 7, dated 7-30-14. Item No peecrIptlort MOH Quantity Unit Price 105 REMOVE CEMENT CONCRETE CURB AND GUTTER LF 54 $9.00 106 REMOVE CEMENT CONCRETE S.W. AND D.W. APPROACH SY 20 $9.00 108 CRUSHED SURFACING TOP COURSE 2" DEPTH SY 3 $30.00 109 CRUSHED SURFACING TOP COURSE 4" DEPTH SY 54 <$16.00„ 114 HMA CL. 1/2" PG 70-28 MISC. AREAS SY ' 3 $225.00 122 CEMENT CONCRETE TRAFFIC CURB AND GUTTER LF 38 $22.00 123 CEMENT CONCRETE SIDEWALK SY 4 $26.00 124 CEMENT CONCRETE CURB RAMP TYPE PARALLEL AEA 1 $950.00 127 CEMENT CONCRETE PEDESTRIAN CURB LF 22 $11.50 128 DETECTABLE WARNING SURFACE RETROFIT SF -8 $25.00 201 VMA PATCH REMOVAL SY 3 $3,00 Total Amount of this Change Order: $ Total $486.00 $180,00 $90.00 $810.00 $675,00 $792,00 $104,00 $950.00 $253.00 ($200.00) $9.00 $1,012,00 SUBSTANTIAL COMPLETION Original Date: 8/29/2014 Prior to this Change Order: 8/29/2014 Including this Change Order: 8/29/2014 Original Working Days: 20 Working Days Added by this CO: 0 Working Days Including this CO: 0 THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER (through 00'#2 ) NET THIS CHANGE ORDER AM 11.04( TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER 4:444$, $ :.u,,,,,., 294,624.45 3839,00 290,785.48 1,012,00 291,797,45 CONTRACTOR ACCEPTANCE: The contractor hereby accepts this adjustment under the lens of the original contract for all work perfomed. RECOMMENDED BY: APPROVED BY: APPROVED BY: rorsc an ger Erfo Guih, isubttc Works Director Mike Jackson, City Manager DATE: 7 g/--- 294 624.45 / DATE: 7.3 DATE: DATE: ATTACHMENTS: Revised Plan Sheet4 and 7 lls1ribritlont, ORIGINALS TO: City of Spokane Valley Clerk's Otllca COPIES TO; Contractor; PW Project File, Finance dept, Clty Manager 7/1/2014 sSji'ukanValley e " Public Works Department Capital Improvement Program 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 • Fax: 509.688-0261 ♦ cityhall@spokanevalley.org Change Order Memorandum Date: August 1, 2014 /7 To: Eric Guth Through: Steve Worl From: Craig Aldworth Re: Change Order 3 — Appleway Blvd St. Pres. Project, CIP 0202 Budget Account No. 311.000.202.595.30.63.00 Spokane Rock Products Contract 14-028 This Change Order provides payment for removing the existing Portland Cement Concrete pedestrian ramp and replacing it with a new ramp meeting current ADA standards at the northwest corner of Bradley Rd and Appleway Blvd. When the project was scoped, the grades on the existing ramp were incorrectly measured as meeting ADA standards. Prior to the start of construction the ramp was discovered to not meet ADA requirements and this Change order pays, under bid item prices for the replacement. This Change Order increases the cost of the project by an estimated $1,012. This project is funded by Spokane Valley Street Preservation Fund 311 and Fund 303 for Appleway Landscaping work. There are sufficient funds in the project budget to cover these costs. Original Contract amount = Previous Change Order Cost = Change Order #3 Cost = Project Cost including Change Order #3 = 15% of Original Contract amount = Max Public Works Director Contract authority = Change Order Cost to date = Remaining P.W. Director Contract Authority after CO #3 Cc: Finance Department Clerk's Office $ 294,624.45 $ -3,839.00 $ 1,012.00 $ 291,797.45 $44,193.67 $44,193.67 $(2,827.00) $44,193.67 LLI 0 m 0 0 JOINT ADHESIVE 60 LE JOINT ADHESIVE 80 LF 00640 AC 2.146:10 8' TAPER GRIND 6EIN PR�"ECT STAC 1 0$00 009EE14EMT0000,C3. PAVEMENT BEAC£ 91/ 54 71E BARS: N CC Lu W 0 (/) E w W ¢0 UAL SWC woU 0-1 = z 0 - 1YTAPER GRIND ';©GNBN0000 ALONG SflUM,,'t�1Tl,E@>a,Nea: 8 - ADHESIVE •y-- .iSI6' PSLNP0F'-.-00 APPLEWAY o1__1._5/10P044140,: JOINT ADHESIVE 80 LE 30 15 0 30 60 SCALE FEET I- 0 LJ in 0 6- 0 0 4- 03 ROADWAY WORK O REMOVE CEMENT CONCRETE 51DEWALK/0RIVE APPROACH 0 REMOVE CEMENT CONCRETE CURE AND CUTTER 0 REMOVE PEDESTRIAN CURB 0 HVA PATCH REMOVAL OREMOVE PAVEMENT MARKINGS UTILITY WORK 20 ADJUST E01S7110 MANHOLE 21 ADJUST 161011NG CATCH DA0N OR ORTAELL 22 ADJUST 0015140 WATER VALVE 23 INSTALL CONDUIT PIPE 2. DIA AND GAL, STEEL CASING PIPE, 6. DIA JOINT ADHESIVE 811 LF LEGEND TAPER GRIND AREA 0 TO 3/8' SII "IIIIII RMA MSG PATCHDACK GRAVEL PATO016034 H5DRO5EEO:NG P03006006 50D PATCHBACS EA HIAA PAVEMENT PATCH V/n v 4131 Aft PLANING 10151101801.16 PAVEMENT, 2' DEP1H NOTES: 3/6" PLANING NOT 500091 FOR CLARITY SEE PLANS AND SECTION SrIEETS FDR LOCATORS DIMENSIONS FOR CASING INSTALLATON ON SIDE STREETS ARE FROM. FACE OF CURBS SEWER - - - - TV - - - - COMMUNICATIONS -CABLE -N - - - - P - - - - ELECTRIC (BURRED) --- V'l- CATER CALL BEFORE YOU 21G 1-800-4245555 m D01 s/1s/1 7/15/1 7/30/14 City of Spokona Yolloy Deoodroonl of Public Work, 07 Loot Sprque Arena, 50E0 106 5001( ( 99306 509) 921-1000 APPLEWAY STREET PRESERVATION THIERMAN TO PARK PAVING PLAN 02 /1/20 SA C4SIDEWALK AND CURB PLAN 11A 10-00 L0 4JSIDEWALK AND CURB PLAN STA IRRIN RT OSIDEWALK AND CURB PLAN 4 STA 19,0 LT 10 5 0 10 20 SCALE FEET NOTE: AFC DIMENSIONS, (125'-6^f, SHOWN ON PLANS ARE Ai FACE OF CURD. REVISIONS DESCRIRTIoN 0/15/14 DELETE SIDEWALK AND CURB RAMP 0100 CNA 7/31/14 DED SEEN. JVD NAB Roo WORK, CO 4YJ Ciry a1 Spokane Volk e D1meni Ml P01e 11707 00Sp00 Avenue, Ra ID6 Valley. SPaRN(E VALLEY, WA, 99206 (Sas) 521-1700 O4 SIDEWALK AND CURB PLAN STA 15+33 LT APPLEWAY STREET PRESERVATION THIERMAN TO PARK SIDEWALK AND CURB PLAN XED 5 C1VA vw CALE •3G'1 CALL BERCRE YOU 01G 1-000.4245555 ED M 10 Spokane Valley® Public Works Department Capital Improvement Program 11707 E Sprague Ave Suite 106 • Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall@spokanevatley.org Change Order Memo Date: August 1, 2014 By: Craig Aldworth Re: Change Order 3 Appleway Blvd Street Preservation Project, CIP 0202 1. Describe the Change This Change Order provides payment for removing a non - ADA compliant pedestrian ramp and replacing it with a reconfigured ramp meeting current ADA requirements at the NW corner of Bradley Road and Appleway Blvd. 2. Evolution of the Change When the project was first scoped the ramp grades were incorrectly measured and thought to be within ADA limits. When marking the project removal limits the error was discovered. The change order will bring all pedestrian ramps within the project limits up to current ADA standards. 3. Payment The change order will be paid under contract bid item prices for an estimated total of $1,012.00. 4. Time No additional time was granted or taken away. 5. Prior Approval The Change Order was signed by the acting Public Works Director August 1, 2014. 6. Attachments Revised Plan Sheets 4 & 7. CHANGE ODER #3 QUANITIES ITEM# ITEM DESCRIPTION UNITS QUANITY PRICE TOTAL 105 REMOVE CEMENT CONCRETE CURB AND GUTTER L.F. 54 $9.00 $486.00 106 REMOVE CEMENT CONCRETE SIDEWALK/DRIVEWAY APPROACH S.Y. 20 $9.00 $180.00 108 CRUSHEC SURFACING TOP COURSE 2" DEPTH S.Y. 3 $30.00 $90.00 109 CRUSHEC SURFACING TOP COURSE 4" DEPTH S.Y. 54 $15.00 $810.00 114 HMA CL. 1/2" PG 70-28 MISCELLANEOUS AREAS S.Y. 3 $225.00 $675.00 122 CEMENT CONCRETE TRAFFIC CURB AND GUTTER L.F. 36 $22.00 $792.00 123 CEMENT CONCRETE SIDEWALK S.Y. 4 $26.00 $104.00 124 CEMENT CONCRETE CURB RAMP TYPE PARALLEL A EACH 1 $950.00 $950.00 127 CEMENT CONCRETE PEDESTRIAN CURB L.F. 22 $11.50 $253.00 128 DETECTABLE WARNING SURFACE RETROFIT S.F. -8 $25.00 -$200.00 201 HMA PATCH REMOVAL S.Y. 3 $3.00 $9.00 $4,149.00 NEED ITEM FOR STOP BAR REMOVE/REPLACE L.F. ? COUNTY DOES WORK?