Loading...
1993, 09-08 Permit: 93007981 Mechanical Fixtureso SPOKANE COUNTY DEPARTMENT OF BUILDINGS WEST 1026 BROADWAY • SPOKANE, WA 99260-0050 (509) 456-3675 SITE ADDRESS: PARCEL NUMBER: SUBDIVISION: LOT INSPECTOR: WATER DIST: SITE INFORMATION 7611 E BEVERLY DR SPOKANE WA 99212 45193.0609 BEVERLY HILLS 1ST ADD. . 9 BLOCK: ZONE: AGSUB DAVE SILVA OWNER: VALKER, DIANE PHONE: 509 924 4868 ADDRESS: 7611 E BEVERLY DR SPOKANE WA 99212 OJECT INFORMATION PROJECT NUMBER: 93007981 ISSUE DATE: 09/08/93 PERMIT USE: GAS FURNACE, WATER HEATER, & PIPING APPLICANT: AIRE VALLEY HEATING PHONE: 509 924 18 ADDRESS: 000521 N ELLA RD SPOKANE WA 99206 CONTACT: AIRE VALLEY HEATING PHONE: SETBACKS -> FRONT: NA LEFT: NA RIGHT: NA REAR: NA LENDER NAME: PHONE: ADDRESS: VOID PE T(S MECHANICAL PERMIT CONTRACTOR AIRE VALLEY HEATING & COOLING LICENSE #: AIREVHI1410H GAS APPLIANCE<=100,000B 1 GAS WATER HEATER 1 GAS PIPING 2 PROCESSING FEE 25.00 TOTAL PERMIT FEE $49.00 PAYMENT DATE 09/08/93 TOTAL FEES 549.00 ISSUED PERMIT RECEIPT# PAYMENT AMOUNT 00009331 $49.00 AMOUNT PAID AMOUNT OWING $49.00 BY: DAWN DOMPIER $.00 NOTICE xis the responsibility of the permittee, not Spokane County, to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the owner's/permittees expense. At a min|mvm, the following inspections ARE REQUIRED by County Code: 1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway hght-of'way, whichever provides the greater setback from the center line of the roadway right-of-way. Curb lines and fence lines are not necessarily indicative of properly lines, In some residential a,eao, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee —neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to Iocating your structure. Failure to properly Iocate the structure may require its relocation at the owner's/permittee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. (Blocking for a manufactured home is required to be inspected prior to the installation of skirting.) 3. FRAMING after alt framing, bracing and blocking is in p|ace, and prior to concealing. 4. INSULATJON - prior to the instaliation of drywall. 5. PLUMBING after mv '|n, before covering, and final. 6. MECHANICAL rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hyu,anto, fire department access, on-site drainage ("208 swales"), road improvements, parking, and Iandscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. In additioto the abovany plumbing or mechaical systems or materials which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. CALL 456-3676 FOR INSPECTIONS. TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE. YOUR INSPECTOR IS UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES: • Road cuts tor utilities or drives, County Engineer's Office 450'30Oo or State Department of Transportation 456-3000 • Sewer connection, County Utilities Department 456-3604 or City Public Works Department 625-6300 • On-site waste disposal system, Spokane County HeaIth District • Electrical wiring, State Department of Laboand Industries 324-1560 • Construction in a flood plain, County Engineer's Office 456-3600 324-2640 EXPIRATION Unless otherwise nnted, this permit will be considered null and void by limitation of the work authorized by the permit if not commenced or is stopped for period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at Ieast once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain |imitationo--p|eaoeoaU us if you have any questions. PV1N511)11]4:1E51? 11 you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed 10 the Department of Buildings at the address found on the face of this permit. | certify tha| have examined this pennNopp|icwinn, state that the information contained in hand submitted by me or my agent to compile said permit/application is true and correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and agree to comply with same. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. | understand that the issuance of this permit/application and any subsequent inspection approvals or Certificates of Occupancy shall not be construed to give authority to violate or cancel the provisions of any state or local law regulating construction, or as a warranty of conformance with the provisions of any state or local laws regulating construction. SIGNATURE OF APPLICATION OWNER OR AGENT DATE Pv# Dept Vendor Contact/Tel LGFS PAYMENT DOCUMENT SPOKANE COUNTY AUDITOR SFS TO: BILL TO: Confaming Order Change Order # Bid ID Blanket# RC# VI# FOB: ACCTG. PERIOD: COMMENTS - COMM LN# DESCRIPTION COMMODITY NO 1 PO DATE: DELIVERY DATE: ENTERED BY: BLDG/ROOM: WAREHOUSE: BUYER PURC • ► • C •: REF ACCT LINE 1 QUANTITY 1 UNIT 1 UNIT PRICE ER — DUPLICATE PENH f "iO #93001 s'a ,UOI REFUND LINE NO. FUND AGCY I ORG SB ORG I ACT OBI SB OBI I REV SRC TOTAL PRICE PAGE TOTAL: ;r RAN; TOTAL: SB REV 1 RPT CAT BS ACCT I JOB NO. y, • ? P' , PAY THIS ANJQUNT 1 P/F RECEIVING CERTIFICATION Materials noted in quantity ✓ have been received in good condition or contracted for. SIGNED TITLE DATE PAYMENT CERTIFICATION 1, the undersigned do hereby certify under penalty of perjury that sufficient funds have been budgeted for this claim, the materials have been furnished, services rendered or labor performed as described herein or contracted for, that the claim is a just, due and unpaid obligation against Spokane County or fund agency indicated above, that I am authorized to authenticate and certify to said claim. SIGNED -- DATE TITLE DEPARTMENT 2 TRAVEL CERTIFICATION 1 hereby certify under penalty of perjury that this is a true and correct claim for necessary expenses incurred by me and that no payment has been received by me on account thereof. SIGNED TITLE DATE PAGE