Loading...
2012, 08-28 Permit: BLD-2012-1081 Mechanical & Plumbing FixturesSOlane Valley° Permit Center 117O3ESprague Ave Suite B3Spokane YoKeyWA99ZU6 509.720-5240 • Fax: 509.688.0037 • email: permitcenter@spokanevattey.org BKD-2012-1081 PROJECT NAME: SITE ADDRESS: 1226 N BOEING RD SPOKANE VALLEY BLD -RES -TRADE ISSUED: 08/38/2012 EXPIRES: 02/24/2013 PARCEL: 45172.0416 APPLICANT: SHCHERBININ, SLAVIK 1226 N BOEING RD SPOKANE VALLEY, WA 99206 509-768-4754 OWNER: GHCHERB|N|N.8LAVK 1226 N BOEING RD SPOKANE VALLEY, WA 99206 509'7684754 GENERAL CONTRACTOR: OWNER: OWNER NOT KNOWN AT TIME OF ENTRY UNKNOWN, UK 00000 WAUGMAN, DARYL L 1206 N BOWMAN SPOKANE, WA 99212 License: OWNER Expires: 12/31/2015 VALUATIONS: Total: FEES: Paid Due Plumbing Permit $0810 $lUO Mechanical Permit $100.00 $0.00 Total Due: $0.00 FIXTURES Qty Mechanical Fixtures 1 Appliance vents installation; relocation; replacement Duct work system Gas water heater Hood, type 11 Air handler.nachunhup0u1U.00Oufm. including ducts Insta!Iation or relocation of Furnaces and suspended heaters, up to and including 100.000 btu 1 Incinerators, residential installation or relocation 2 Gas pping system outlet Printed: 08-28-2 12 16o7:35 Qty Plumbing Fixtures 1 Repair or alteration of water piping, drainage or vent piping 14 Each plumbing fixture on a trap (includes garbage disposals, dishwashers, backflow device, drainage, hot tubs, built-in water softener, water closets, /avatohou, oinko, dmino, etc.) Qty Electrical Fixtures Page 1 of 2 .0, '•,... SOokane ,Valleye Permit Center 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206 509.720-5240 • Fax: 509.688.0037 • email: permitcenter@spokanevalley.org BLD -2012-1081 PROJECT NAME: SITE ADDRESS: 1226 N BOEING RD SPOKANE VALLEY BLD -RES -TRADE ISSUED: 08/28/2012 EXPIRES: 02/24/2013 Final Plumbing Inspection REQUIRED INSPECTIONS Final Mechanical Inspection CONDITIONS I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: Date: Printed: 08-28-2012 16:57:35 Page 2 of 2 NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are at the applicant's/permittee's or property owner's expense. A0aminimum.MhefuUowinginopoohonoAREREOU|REDbydheSpokanoVe|leyK4unidpm|Coda(SVMC): FOOTING - when forms and reinforcements are in place and prior to placement of concrete-aII otrumums, including manufactured homes. NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions hen solely with the permitee-neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION when forms and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough -in, before covering and final. MECHANICAL rough -in of piping, before covering, metal chimneys before concealment and final. FRAMING after ati framing, bracing and blocking is in p/uoo, rough m|octrica|, plumbing and mechanical systems are complete, and prior to concealing. FINAL when complete and prior to occupancy and/or use; all permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants, fire department access, on-site drainage /'208'xwm/ooj. road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover RIGHT-OF-WAY/APPROACH prior to placement of concrete / asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, dryvvall, concrete, etc., must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects. State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3 working days in advance. PERMIT EXPIRATION AND REFUNDS Expirations: Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit ioxuonco, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for haif the permit fee based on the value of the remainder of the work required to finish the original permit. Right-of-way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the date of issuance, with a one-time 30 -day extension availabte. Right-of-way permits issued between October 1, and March 31, shall be valid until the following April 30. Refunds: All refund requests must be made in writing by the original permitee to the Buitding Official no later than 180 days after the date of fee payment. Futi refunds wilt be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane VaIIey Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available for reference on the city website at: http://www.spokanevallev.orq and search for "fees" Owner/AgentC _ ^�/c^v6]/4^/ /�l Staff Approval Date: