Loading...
2011, 10-07 Permit: 11003127 ResidenceSp"„okane Valley° Permit Center 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206 509.720-5240 • Fax: 509.688,0037 • email: permitcenter@spokanevalley.arg Site Information Project Information Site Address: 1220 S BOLIVAR LN Parcel Number: 45233.4502 Subdivision: Block: Lot: Zoning: R-3 SF Res District Owner: LOTS N LAND LLC Address: 122 N RAYMOND RD S"FE 3 SPOKANE, WA 99206 - Building Inspector: EAST Water Dist: VERA Project Number: 11003127 Inv: 1 Issue Date: 10/07/2011 Permit Use: SFR W/ATT GAR Applicant: KEVIN MADDEN HOMES, LLC 122 N RAYMOND #3 SPOKANE VALLEY, WA 99206 Phone: (509) 217-6700 Contact: KEVIN MADDEN HOMES. LLC 122 N RAYMOND #3 SPOKANE VALLEY, WA 99206 Phone: (509) 217-6700 Setbacks - Front: Left: Right: Group Name: Project Name: Rear: Permits Building Permit Total Area Building Height Stories Dwelling Units Impervious Surfaces Contractor: KEVIN MADDEN HOMES I.LC 1&2 FAMILY R-3 V13 588 2ND FLOOR R-3 V13 649 BASEMENT U R-3 V13 526 DECK OPEN R-3 V13 90 GAR WOOD U -I V13 572 2335 27 2 1 0 Total Value: $127,628.89 FOR I3UILDING INSPECTIONS CALL (509) 688-0054. Mechanical Permit License #: KEVINMH954N3 RESIDENTIAL PERMIT FEE WSRCC SURCHARGE SF PLNS RVW < 7999 SQ FT SFR / DI1P SITE PLN REVIEW Total Permit Fee: Contractor: KEVIN MADDEN HOMES LLC License #: KEVINMH954N3 DUCT' 1VORK SYSTEM 1 GAS APPLIANCE<=I00.000BT 1 VENTILATING FANS I DUCT 3 FOR MECHANICAL. INSPECTIONS CALL (509) 688-0054. Plumbing Permit Contractor: KEVIN MAIDEN HOMES LLC TOILETS/BIDETS TU135 GARI3AGE DISPOSAL FLOOR DRAINS FOR PLUMBING INSPECTIONS CALL (509) 688-0054. Processed By: DAVIS..IENNA Printed By: MORRIS, HEATHER Page 1 of 2 2 1 1 $11.00 $13.00 $33.00 GAS WATER I (EATER GAS PIPING ADPL VENTS INSTL/MOVE/RP Total Permit Fee: License #: KEVINMH954N3 $12.00 $12.00 $6.00 $6.00 SINKS DISH WASHERS CLOTIIES WASHER PERMIT Total Permit Fee: 2 $1.150.55 $4.50 $460.22 $50.00 $1.665.27 $11.00 52.00 $10.00 $80.00 4 $24.00 $6.00 $6.00 $72.00 Silikane jValley® Permit Center 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ email: permitcenter@spokanevalley.org Site Information Project Information Site Address: 1220 S BOLIVAR LN SPOKANE VALLEY, WA 99206 Parcel Number: 45233.4502 Project Number: 11003127 Inv: 1 Issue Date: 10/07/2011 Permit Use: SFR W/ATT GAR Permits Payment Summary Total Fees AmountPaid AmountOwing $1,817.27 $1.817.27 $0.00 Tran Date 10/04/2011 10/07/2011 Processed By: DAVIS, JENNA Printed By: MORRIS, HEATHER Page 2 of 2 Receipt14 Payment Amt 28581 $460.22 28636 $1,357.05 PERMIT NOTICE ^ The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee thathe use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC): FOOTING - when forms and reinforcements are in place and prior to placement ofoonnmte'aU otmctuneo, including manufactured homes. NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC. Curb lines and fence lines are nof necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the ponniteo'nodhor the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION when forms and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough -in, before covering and final. MECHANICAL rough -in of piping, before covering, metal chimneys before concealment and final. FRAMING - after all homing, bracing and blocking is in p|aoo, rough e!entriva|, plumbing and mechanical systems are onmp|nte, and prior to conceahng. FINAL when complete and prior to occupancy and/or use; all permits require final inspection. NOTE: In addition to inspection of the uhuo&une, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants, fire department access, on-site drainage /'208'owm6eoj' road improvements, parking and /andscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover RIGHT-OF-WAY/APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects. State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 o1least 3 working days in advance. PERMIT EXPIRATION AND REFUNDS Expirations: Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) woris not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit \oauanoe, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for haif the permit fee based on the value of the remainder of the work required to finish the original permit. Right-of-way permits (regulated under SVMC Chapter 22) issued between April 1. and September 30, are valid for 30 days after the date of issuance, with a one-time 30 -day extension available. Right-of-way permits issued between October 1, and March 31, shall be valid until the foliowing April 30. Refunds: AU refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee payment. Full refnds will be granted for any permit issued in error. Rate of refndahaUb000sethorthinUhoCdyoySpokaneVo|ley Master Fee Schedue in effect atthe time of permit application. A copy ofthis schedule is available at Permit Center and also available for reference on the city website at: http://www.spokanevallev.org, and search for "fees" �� Owner/Agent � ' "���- ^�~-� ~�~�� DoVo: /0 Staff ApprovaDate: