Loading...
2011, 11-08 Energy Compliance CertProperty Address: (3d 7 S v L Conditioned Floor Area ' ? lir") Date (1 / $1 4I Builder or registered design professional : /cam ;47 ee LL C Signature: R -Values Ceiling: Vaulted R- .<1/1 Floors Over unconditioned space R - Attic R- /� Slab on grade floor R- `0 Walls: Above grade R- a.1 Doors 0 2,0 R - Below, int. R- R - Below, ext. R- R- U -Factors and SHGC Windows R. , )t) SHGC- Skylights U- SHGC- NFRC rating (or) Default rating (Chapter 10 WSEC 2009) 9 System Heating Cooling DHW Total Cqt: 9 Credits Heating, Cooling & Domestic Hot Water Type Duct & Building Air Leakage Emdency All ducts & HVAC in conditioned spade (yes /no ) In ation R - Test Method: Total leakage ✓Leakage to exterior Air handler present Test Target CFM@25Pa Test Result CFM@25Pa Building air leakage target: SLA<0.00030 - Tested leakage: SLA= 00021 System type: Onsite Renewable Energy Electric Power System Rated annual generation Kwh