Loading...
2013, 05-21 Permit App: BLD-2013-0939 Pole BuildingSpokane jcValley. Community Development Residential Construction Permit Application Permit center 11703 E Sprague Spokane V- " v; (509)688-C s www. spokaneva Ave, Suite B-3 WA 1I99206f�}� q t ey.oi�pp)�R 8 —1 3 — r 347 RECEIVED �,,Ney onstruction T r Adcfi ion/Remodel PERMIT NUMBER: PERMIT FEE: CSV F' ERrOtht iJTER Accessory Bldg Deck SITE ADDRESS: v sb% -cak EiEv, # 1 ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: �i .1 G ‘ S S1 h) Name: Name: City: N Q,c)o - . State: i, Zip: 0.15 b, Phone: 4bc6, `6,� b Fax: 4(09, 31 m "f \ Address: \ Svc • liM) L1,1� � fi'Q IMPERVIOUS SURFACE AREA: City: , State: Zip: Phone: V\1 oio C)(?' Fax: CONSTRUCTION TYPE: Contact Person Name: Phone: Describe the scope of work in detail: A Contractor: ,;V citi v` %1 'et% Name: Address: 'Ai 4 )cvi s llz.-Es a City: N Q,c)o - . State: i, Zip: 0.15 b, Phone: 4bc6, `6,� b Fax: 4(09, 31 m "f \ Contractor Lic No: vocAsi l tlExp Date: F-C� a2, 14 City Business Lic. No: 1 `4soi t f Cost of Project: $ 111 O Proposed Use: % -`\0_,\AW-i., **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: \�/ DIMENSIONS:,3,1 13t�� # OF STORIES: 1 TOTAL_ yABITABLE SPACE: MAIN FLOOR TO SQ. FTG: W 2"" FLOOR SQ. FTG: 'C' UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: ..3‘.- GARAGE SQ. FTG: DECK/COV TIO SQ. FTG: 30% SLOPES ON Qa TY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE- SEWE SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be irocessed. SIGNATURE: L- DATE: J ` o�, i- /2 Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check ❑ Mastercard 0 VISA Expires: VIN#: RESIDENTIAL CI�;K LIST DIRECTIONS:�m, Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Uh|itiea, septic tank/drain field locations and distances o Setbackto property lines o Distance between buildings o Right of way/easement Iocation & sizes o Driveway approach size and location BUILDNG PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: o Foundation PIan (crawlspace, basement or slab on grade): o Footing sizes and Iocations o Perimeter concrete foundation wafl sizes O Craw|upaooventilation oSupporting wood cripple wafls or beams o Thickened concrete pads supporting beams or girder trusses O Floor PIan of each level(finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete IinteI sizes o Brace wall panel !ocations o Water heater and furnace Iocations o Exhaust fan locations o Deck or concrete patio sizes and Iocations O Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing o Window and door iocation and sizes oWindow well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawi space access Iocations o Fire Wall construction o Ridge, eave and valley lines • Beam and girder size and location O Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Truss or rafter size, spacing & connection o Sheathing size and type Ceiling o Joist size and spacing 0 Size of ceUing gypsumum wall board Wall O top plate/ stud size and sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier o Attic insulation/ air space baffle/ ventilation Miscellaneous Construction Detalis O Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing O Sboimvay tread rise & run and nosing o Sidingexterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground levedepth O Horizontal & vertical reinforcement if any o Reinforcement if any 0 Active system with 6 mil vapor barrier o Footings/ postl and beam size and ocations O Handrail / Guard hihd8 spacing Sj�1t'!. Residential Driveway PAVING WAIVER Community Development — Planning Division 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.720.5026 ♦ Fax: 509.688.0037 • planning@spokanevalley.org Spokane Valley Municipal Code (SVMC) Section 19.40.020.8; "All residential driveway and off-street parking areas shall be paved with asphalt, Portland cement, grasscrete, paver blocks or other equivalent hard surface material". A paving waiver can only be granted if the structure you are proposing is not going to require a driveway for daily use. PART I — OWNER INFORMATION OWNER NAME: .V,(N e \ (6 n N PARCEL #: ADDRESS: \SOL. S . QQ t.\ \INZ- CITY: C -Q - V STATE: \K\ VA Zip: PHONE: VA\ VOSCI FAX: CELL: EMAIL: PART II —DETAILS OF PAVING WAIVER 1. Do you have an existing garage for parking daily use vehicles? M YES ❑ NO 2. Is the proposed detached structure used for storage only? Kj YES ❑ NO 3. Do you plan on using the detached stru re to park vehicles? ® YES ❑ NO If yes, then what type of vehicles?-S''©CG �t- F11Z 4. Do you plan to conduct a business from proposed detached structure? ❑ YES NO If so, what is the nature of your business? PART III —AUTHORIZATION I,(PRINT NAME)�oiJ 61 get 1 owner, hereby confirm that the information provided on this form is true and correct. I acknowledge that any change in the foregoing conditions, could require the City to impose paving requirements. 1 further agree to report any change in these conditions to the Spokane Valley Community Development Department, Planning Division, within 30 days. f �( L9 -e i Owner Signature S --aQ- r, Date PART IV — DECISION STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT DIRECTOR AND FIND THE REQUEST IS G ANT1ED AT q /J© S 801.111,14. SAID ADDRESS FOR PERMIT #: IC1 - / .39 .5/2 /zo'3 Planning Division Staff Signature Date Created 6/27/11 Page 1 of 1 PLANNING DEPT. APPROVED BY: DATE: 6'2f 12003 /i4./ T/ 1 , Quality STEEL BUILDINGS, INC. 361 Sandy Shores Rd Newport WA 99156 LIC# QUALISBO81C7 SITE PLAN SHOW NORTH Project6td`(3"97, 1 'f { RECE En (509) 468-1606 office (509) 468+,'3720 fax ., CSS! ;:—.;-.., _. SUB ri 67-7 I S' SOP 90 7 f ‘13-()./ 42) SHOW STREETS/ALLEYS SHOW SEPTIC/SEWER/DRAINFIELD SHOW EXISTING BUILDINGS SHOW SETBACKS-FRONT,REAR,SIDE SHOW LOT SIZE SIDE YARD & REAR YARD SET BACKS. JOB NAME SD 1A '61B Sot PHONE # qq1 obsS ADDRESS PARCEL # \5e2s_eoL\ovzkb, Lis:t31.abe4 LLT = t2)03(o TA