HomeMy WebLinkAbout2014, 07-29 PRE-COMM-2014-0049, A,B,CSpokane e
�Ualley
STAFF USE ONLY
Object # �/tCCMM' °SDI''
RECIIV�' EQ�OmYun
JUL 2 8 2014
CSV PERMIT CENTER
SUB#I
REV. # T1
0 90)(9)(�)
evelopm pAtrptrD�tQp�jgttp¢mepAntt
11703 EastS r'd�OCR1i'n ,S iS3
11703 EastitimamteMeteomi5004
Spokangf l(509Y 2CPSNO
Fax: (509) 688-0037
permitcenteraspokanevalley.org
Date Submitted:
Received by:
Complies with Zoning District
Fee:
IA
4
PRE -APPLICATION CONFERENCE FORM
® COMMERCIAL (Complete Sections 1-4) 0 LAND USE (Complete Sections I, 3 and 4)
SITE ADDRESS:UKN
145807 -- AIkt
.PARCEL NUMBER(S):55173.0501
PROJECT LOT SIZE(S) (ACREAGE OR SQ FT):52,570
EXISTING USE OF SITE:RV, TRAILER, VEHICLE STORAGE/PARKING
PROPOSED USE OF SITE:RV, TRAILER, VEHICLE STORAGE/PARKING
EXISTING NUMBER OF LOTS:1
PROPOSED NUMBER OF LOTS: 1
RECEIVED
CSV Development Engineering
EXISTING: ® Sewer 0 Septic PROPOSED: 0 Sewer ❑ Septic
SECTION 1:
PROPERTY OWNER:
❑ CHECK BOX IF PRIMARY CONTACT
NAME:STANLEY J. JOCHIM
JUL 2 9 2014 atzlivk„
Project#.-91`:/s&t,
Name_ (b��
Submittal #
ADDRESS:PO BOX 174, LIBERTY LAKE, WA 99019
PHONE:509-255-9330 FAX:509-255-5451
EMAIL:SEABATT7@COMCAST. NET
OWNER'S REPRESENTATIVE:❑ Contractor ❑ Architect ❑ Engineer
® CHECK BOX IF PRIMARY CONTACT
.
e-
NAME:STANLEY J. JOCHIM
® Other OWNER
COMPANY:N/A
ADDRESS:PO BOX 174, LIBERTY LAKE, WA 99019
PHONE:509-255-9330
FAX:509-255-5451
EMAIL:
I CERTIFY THAT THE ABOVE INFORMATION FURNISHED BY ME IS TRUE AND CORRECT TO
THE BEST OF MY KNOWLEDGE.
7/25/14
Owner/Applicant Signature
PL -35 V -I
PL -35 V -I
Date
Page 1 of 6
Page 2 of 6
constructed trom as well oS how much space can be left open around it. The specifics related to this question
PL -35 V -I
Page 4 of 6
SECTION 2:
FOR COMMERCIAL BUILDING ONLY:
Occupancy Group: ❑A ❑B ❑E OF ❑H ❑I ❑M OR ❑S ❑U
Construction Type: Type V Type IV Type III Type II Type I
OA❑B DAUB OA❑B ❑A❑B PA❑E
Square Footage: Number of Stories:
Automatic Fire Suppression System: OYES ONO Building Waste Disposal: OYES ONO
Fire Alarm System: OYES ONO Proposed Food Service Facility: OYES ONO
SECTION 3:
Proposed name of project, if any;
BARKER/BROADWAY [2014]
PROPOSAL: Provide a detailed description of the proposed project including, but not limited to, the changes to the
site, landscaping, number of lots and uses proposed.
PARCEL 55173.0501 IS PRESENTLY A FENCED AREA OF BARE LAND THAT IS PRESENTLY LEASED FOR
THE PURPOSE OF TEMPOARY RV AND TRAILER STORAGE. THE PURPOSE OF THIS PROPOSAL IS TO
BRING THE PARCEL INTO CONFORMANCE TO SPOKANE VALLEY CITY CODE REQUIREMENTS FOR
ITS PRESENT USE.
SPECIFIC ISSUES/QUESTIONS YOU HAVE ABOUT YOUR PROJECT: (Examples: Landscaping, Paving,
Parking, Setbacks, Stormwater, Frontage Improvements, Traffic, Fire Sprinklers, and/or Accessible Requirements)
PAVING, LANDSCAPING AND ANY OTHER IMPROVEMENT REQUIREMENTS FOR CODE
CONFORMANCE.
Please list below the names of City staff you have been in contact wi
Staff Person Name
Department
KARIN KENDALL
PERMIT CENTER
BILL SCHULTZ
CODE COMPLIANCE
SECTION 4:
THE APPLICATION WILL NOT BE ACCEPTED IF THE REQUIRED MATERIALS ARE NOT PROVIDED
® $250.00 Application Fee: This fee will be deducted from the formal application fee (proposed in pre -application
request), if filed within one (I) year of the pre -application meeting date.
® Commercial Review Only: OR 0 Land Use Only: Two (2) copies of a Site Plan, to
I. Nine (9) copies of a Site Plan include:
(See separate sheet for commercial site plan 1. North Arrow and Scaled drawing (i.e. engineers scale)
requirements) 2. All abutting streets identified
2. Nine (9) copies of a Floor Plan; and 3. Property configuration - Existing & Proposed
3. Additional Information, if any. 4. All existing structures, identified and dimensioned
PI, 35 V -I Page 2 of 6
Spokane e'
• •
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509)720-5240
Fax: (509) 688-0037
PRE -APPLICATION CONFERENCE
INFORMATION AND CHECKLIST GUIDE
Pre -Application Conferences are offered for the following:
• Commercial and Industrial Buildings & • Conditional Use Permit
Structures — New, Remodels or Additions • Variance
Changes of Use or Occupancy • Rezones
• All Multi -family (tri-plex and above) • Planned Residential Developments
• Short Plat (dividing land into 9 or fewer lots) • Zero Lot Lines
• Subdivision (dividing land into 10 or more lots) • Text/Comprehensive Plan Amendment
• Binding Site Plan (division of commercial
and industrial zoned land)
What is the purpose of a Pre -Application Conference?
The purpose of the pre -application conference is to assist applicants in preparing their development applications for
submittal to the City, to identify potential problems, and to streamline the development review process. These pre -
application conferences are informal and provide an opportunity to meet with the City departments responsible for
development review. City representatives will review the submitted materials, provide comments, and may identify
issues or concerns wherever noted.
Who Should Attend the Pre -Application Conference?
The applicant, contact person, consulting design professionals and the property owner should attend the pre -
application conference. City staff in attendance may include representatives from Building, Planning, Engineering,
the Fire District, an appropriate water district and other outside agencies.
Application Procedures:
To schedule a pre -application conference, submit the required items to the City's Building Permit Center, open
Monday through Friday, 8:00 a.m. to 5:00 p.m. Once all pre -application items have been received and deemed
complete a date and time for the conference will be assigned. Commercial/Building Pre -Application meetings are
typically scheduled on Tuesdays and Land Use Pre -Application meetings on Wednesdays, two weeks from the date
of submittal.
City and agency staff members will review the request and prepare written comments. Please note that pre -
application meeting comments are preliminary and reflect the proposal submitted and the regulations in effect at the
time of review. They are not meant to be detailed final comments or requirements. Information received through
the pre -application process will help you design, prepare and submit the formal building permit application. Also
please note that all pre -application materials are public record (RCW 42.56).
PL -35 V-1 Page 3 of 6
The following lists are guides for preparing documents for a pre -application
submittal:
Site Plan: Site plans for a pre -application conference may be preliminary in nature, but should include enough
detail to accurately depict the full scope of the project. Site plans should be no smaller than 8 %s" x 1 I" and no
larger than 30"x 42". Plans must be to scale (i.e.. 1"= 30'. 40' or 50', etc. or fully dimensional.
//
Show all rooms. Specify the use and size of all rooms (classify use per IBC Sec. 302)
Applicant's name, address and phone number
N
Li
-U
Property owner (s) name and address
E
if the proposed project is in an existing building with a tenant improvement or a change of occupancy,
then all of the above, plus a complete existing floor plan should be included for comparison
Vicinity map
X
Zoning
PI
Water District
Fa
North arrow and date
Cl
Dimensions of existing and proposed (if applicable) parcel boundaries and dimensions
//
Location(s), size(s) (in square feet) and use(s) of existing and proposed building(s) and structures
1Z
Location of existing & proposed drainage facilities (including swales & drywells) and utilities
►,/
Location of existing and proposed driveways and turning` radiuses, parking areas, outside storage
areas, road easements and right-of-way on the site and on adjacent properties (including across the
street)
N
Note paving (existing and proposed) of all parking and travel areas
N
Square footage of impervious surfaces (existing and proposed, excluding building footprint)
�/
Adjacent streets -
Q9
Proposed phasing (if applicable)
;Q9
All sensitive areas on or adjacent to the site such as any watercourse (stream, drainage, etc.),
unstable/steep slopes, areas of slope 30% or greater, and flood plains or wetlands
E
Location of all fire hydrants within close proximity to the property
Q9
Location of all utility poles, streetlights, etc., both on-site and in the adjacent public right-of-way
Floor Plan: Proposed interior building floor plan shall include a complete scaled or dimensional floor plan
showing all of the following (list includes items for restaurants/kitchens):
LJ
Show all rooms. Specify the use and size of all rooms (classify use per IBC Sec. 302)
U
Wall legend must delineate new, existing, demolished and relocated construction
Li
-U
Show location, size and door swing for all required exits
U
if the proposed project is in an existing building with a tenant improvement or a change of occupancy,
then all of the above, plus a complete existing floor plan should be included for comparison
Additional Information: A more complete review of the proposed floor plan is available by submitting the
following information (if applicable) in addition to the required information listed above:
L
Fire barrier(s) type and location
U
Alt accessibility features
U
Grease interceptor size and location
U
Kitchen equipment (Type 1 hoods, dishwashers, fryers, grills, etc.)
Questions....
The City has provided answers to some of the commonly asked questions to assist you in preparing for the Pre -
Application meeting request. Feel free to contact us at the Permit Center (509) 720-5240 or
permitcenter@spokanevalley.org, for additional questions.
BUILDING:
1. How big can my building be?
The State adoption of the International Building Code (IBC) specifies the maximum size of a building based
on its type of occupancy and construction type. The height, area, and fire- resistant construction requirements
for any building all come from the how the building will be used and the type of material the building is
constructed from as well as how much space can be left open around it. The specifics related to this question
\` •
Page4 of 6
PL -35 V -I
• •
can be found in IBC Section 302, Table 503, except as modified in Sections 504, 506 and 507, and Section
602.
2. When is fire-resistant construction required?
The requirement for fire-resistant construction depends on many factors. If it is important that fire-resistant
construction is not required for the project, please contact the Permit Center at 720-5240 and ask to speak to
the Senior Plans Examiner to discuss this issue.
FIRE:
1. Does the Fire Department require access?
All the specifics are found in the International Fire Code (IFC) Chapter 5 and Appendix D. Fire access is
required for new construction and building additions. If the proposed structure is over 150 feet from a public
street or is located on main arterials, on-site fire department turnarounds are required. All fire access roads
shall have a minimum width of 20 feet (26 feet for buildings over 30 feet tall) and a 30 -foot turning radius.
2. Do 1 need fire suppression and/or fire alarm systems?
If an existing building(s) is sprinkled and/or has a fire alarm system, the systems shall be extended into the
new addition Tenant improvements may require revisions to existing systems. If a change of occupancy is
occurring, and/or if new construction is proposed, sprinkler and fire alarm systems may be required, based on
the type of construction and on the proposed use. Specifics are found in the International Fire Code (IFC)
Section 903 & Section 907.
PLANNING:
1. The Planning Division addresses maximum building height determined by the zoning district. Contact the
Planning Counter at (509) 720-5310 or planningAspokanevalley.org for more details.
2. Is paving required?
Yes. All driveways, parking areas and travel ways must be paved with concrete, asphalt or an approved hard
surface, except gravel.
3. When is landscaping required?
If you are proposing new construction, a building addition or site improvements, then landscaping is
required. Most projects require a certified landscape architect to prepare a landscape plan. The Project
Planner reviewing your proposal will estimate you how much landscaping you will need based on Section
22.70.030 (Screening and Buffering) of the Spokane Valley Municipal Code (SVMC) and if a design
professional is required.
DEVELOPMENT ENGINEERING:
1. Will 1 need to dedicate street right-of-way?
When streets fronting a piece of property are not wide enough, public right-of-way and/ or border easement
dedications may be required to offset the traffic impacts of the project. Dedications may also be required if a
new street is necessary as required by the City's Street Standards, the Arterial Street Plan, or the Local
Access Connection Plan. Because the dedications are viewed as mitigation for increased traffic from the
project, no monetary compensation is provided.
2. Are street frontage improvements required?
If not already in place, street frontage improvements, including pavement, curb, gutter, swale and sidewalk,
may be required depending on the size and scope of your project. Specific requirements can be found in
Chapter 2 of the City's Street Standards
3. Will I need to prepare a traffic study?
Most projects require a review of the traffic generated by the proposal. In general, smaller projects that
generate less than 10 PM Peak Hour Vehicular Trips require a brief letter from the applicant describing the
project and number of expected new residents or employees. Projects generating more than 10 PM Peak Hour
Vehicular Trips need to submit a Trip Generation and Distribution letter from an engineer licensed in
PL -35 V -I Page 5 of
• •
Washington State. If a project generates more than 20 PM Peak Hour Vehicular Trips to an intersection of
two arterial streets, a Traffic impact Analysis prepared by an engineer is required. The size and scope of the
study is coordinated through the City's Traffic Engineer.
4. Will I need a drainage report?
Projects proposing new drywells or 5,000 sq. feet or more of new buildings or pavement typically trigger
stormwater storage and treatment requirements. This may require a drainage report, a drainage plan, and
erosion and sediment control plan prepared by an engineer licensed in Washington State. Projects replacing
impervious surfaces with in-kind materials usually do not trigger stormwater requirements unless the
improvements cause stormwater to flow differently. On redeveloped sites where pre-existing facilities
remain, the old facilities are not subject to stormwater requirements if they remain hydraulically isolated from
the new facilities. Specific requirements can be found in Chapter 2 of the Spokane Regional Stormwater
Manual.
PL -35 V-1
Page 6 of 6
W
M
M
LC)
03
N
0013 £
Project #17(4C-
RECEIVED
,Z1•011
M
Hat
O
t ] M
,09'601
V 04-90
-41
-03
O
`P
03
•
,00'sZ l
GILIVIdNfl
,ZZ'S s
3 4,99,01.0 s (8 ',SP)
E -F
0
,00'S11 ,00'SZl
M „OS,ZI.O N
90'SL9 LCfS G V O 2
JULL,t
CSV PERMIT CENTER
SUB # bp REV. #
SCOUTS )
Printed from maps.spokanecounty.org on 07/22/2014 at 10:27 AM
Spokane County �?'�/
55181.2939
55151.2937
MB lip
5518i 3203 FP
55151 1301
55164.1310
55181.3508
55181.3353
ot
eftr
55172:0221
3T5 o.Av-
55172 022p
£ZZTELl 91
Av
55184 0607 ��
rim
rjIIIA i
o'�
55173 3102
w
Project #PR toM -)°II-E-o
RECEIVED
JUL 2 8 2014
CSV PERMIT CENTER
SUB # REV. #
1
ca)
SCOUT( ) Printed from maps.spokanecounty.org on 07/22/2014 at 01:24 PM
Spokane County �/
s
551111.3655
55 1134.1301
55164.1319
Id
■la
55164 1320
Ii
\
I
I
u1
0
6,72
55172.0221
a "Mtn
55172 0220
55172.0223
ng55172.04 02lu
—Pro s ti ay:Av-----�--
1011
55164.1427
517
-30501
57' 3
55173.3102
NXl J U S 1
�\ / Nr fJ.t u •1 r�tjij;
V b o o u
G
551]3.051] 111
A'^�
1.41111P11j52
55172.0217
55172.0420
55173'3
55173.0519
lor
ri
Project #fR COMN%- j/1A
RECEIVED
JUL 2 8 2014
CSV PERMIT CENTER
SUB#
REV.
(b)
Sent By: WOLFFAHISLOP NOLTE BITZ Attorney,50977718.00;
BROADWAY AVENUE
375'
18
t
389'37'20%
/11
I0 North line --
- • Block 4
May -3-07 8:41AN;
S89'37'20%
Page 1/1
10' Strip
Pending
Ownership
Resolution
375'
50.631
Sq.Ft.
201.3'
ti k 10�
375'0 �O
o��,1. tit#
Cb)
n
•
a
0
4
PROPERTY DESCRIPTION
Per Statutory Warranty Deed - AFN#4132185
Lot 5, Block 4, E Corbin Addition to Greenacres, according to plat
recorded In Volume 'S- of Plats, poge 30; Situate In the County
of Spokane, State of Washington.
EXCEPT the Ent 201.30 feet.
TOGETHER WITH -
Quit Claim Deed per AFN #4132188
The 40' abandoned canal right-of-way north of and adjoining
the following parcel 55173.0505 - Lot 5, Blk 4, Corbin Addition
to Greenacres. According to plot recorded in volume 'S' of
Plats, page 30, In Spokane County, Washington.
EXCEPT the Cost 201.30 feet.
N89'32'5811V
ALKI AVENUE
0 50 100 200
FOR: TODD ROOKS
Founded 1948
bimpson Engineers, Inc.
CIVIL ENGINEERS & LAND SURVEYORS
N. 909 ARGONNE ROAD, SPOKANE VA., 99212-2789
PH011E 0509) 926-1322 PAX 0509) 926-1323
:\Protects\15001 155U0\15203\dwg\IS 03.dwQ 5/i/2007 10140:58 AM PDT
SCOLJJT Printed from maps.spokanecounty.org on 07/22/2014 at 01:36 PM
Spolcmc County
55181.3655
55 to 1.320.3
ISM
Gra
55161.3506
y
55181.335
sm
oslunani
rodondill
1 $•
IJ
r(
5518406p1
551)2.0420
ismim way:Ay my�
Sst>3� 55, )33tUU 55113.3)01
tOt
8
8
5s lia aei3 '� �� /,c
55171 �� _.'.
...c.
.PPP\¢W'Y�^t�\. �sb1
�Mt
� . Ilk ���„��
5173 3102
N
0
55173.0519
0
Project #fg6- COMM-2Dt4-.
RECEIVED
JUL 2 8 2014
CSV PERMIT CENTER
SUB#REV. #I _�
mA o
mu! c
g
zmo
rn
\ OON
20' h-
1
20'
z
tn2646.65' -
1N0'12'50"W BARKER
$ R O A D 534.77'
85.25
01 X la
M o~ O O
ym Z Ntn o o
DZ0•• CO
Zr
Oim 5?
0
c
0N0 0 cn m
V tJ W 0 A
c.n co. co O Lo [p A. -
p
T b tD
W
t0
m —3
CO cm
A 01
O O
CO O
c c
r Z
S O
IN
+_
ZZ
c m
N 1
125.00'
125.00'
475.06'
N 0'12'50" W
125.00'
4.4 l
y
CO
O,
t0
O
Project # fAttOMP1 -2401 bo1-F9
RECEIVED
JUL 2 8 2014
CSV PERMIT CENTER
SUB#Crl REV.#r,I
423:00' 125.00'V
(485' R) S 010'56" E
515.22'
UNPLATTED
W
A
;Ca
1i
1, .APPL1 CArIT/Q ij3g
STRNLft44 ;coctiN1
• po &oil 1�gszrui1l n4
• ass-1;30/219-ISSI
�. W \Thz biST'.
• caNScl.i.biT6b
.-610113439; RC
4, IMPftevDuc SURFAce.
a I) Ka cop
a� f( o
(DODO SF
!U) EXIS1140(7
oR
PRn 12(.354 1h.11%
FAc11111c.
C, No SCKea Lq TS
7, A PP)( UA\P- -1)
2,o,o0O ST,
SCAL c
Parte
t
Ek1S111 P&ACe
O
€XGT Tor r
0 FENCE 1 1K
0
O
0
;3r)
pacxg.Tci %IAie
O
?U
H
Go
90
%Q
TI
a50,Ja et‘
04- cicM104JQ
0 --3u-N
4
EXSISTI N C -
3o' GP0-46
� 3v
k '6 v€%_
135
I?AvE1 AYLEA
GROVEL -
r
P FlJa. A2EA
CaAvec
30
,
POU
d
Project # e
RECEIVED
JUL 282014
CSV PERMIT CENTER
SUB #
REV.#0
th
NJ
• AP�j L1 Pohs uvNtR
• %iwut,_ CrA
▪ PD7 vv4, LimeatyLtw4
• aS5-`1330/a75-Ic‘c1
F- a5 S-913()
3. 4_6N11‘)&, RC_
4, IhPL2v(NS Sun(fk>Ct' I-lo6Sf
->CICTit 2L S
d5C,S-F
45sc) Sr
G2bwr:\ .77z_C;
9 A B C. t:; r u n
• SM&LLi . PLt:.til S Ar_ovi
west- EDGE C 'bRlvelcALc
h d t.1C� b Al icir,l-R Fncr_ 17)1
Nv STS° t- LIC +-l1
`i , A PPP'X 4.REft IS,.36o ST
I 4c1)
ale /S -
Pow 2&
por_c
Project # 'COMB t'?OItt'CO4- )
RECEIVED
JUL 2 8 2014
CSV PERMIT CENTER
SUB #
REV. #
a
Posc---b
Isms --,
Pd win_
PoLQ_
P2643277-
)
!)
0
r1apte___
r
o 1 tai»srlf-G
F c -c
0
m
0
0
SEWEI
MrafJ r-jL-2
lDU
10
T
00a4erc
• Pa ¶ d5 flj Ll VEely uM.t.
ass -9 0 21,1-Igsl
FAN aSs -Syl 51
• • Cgt‘SIV6
3. { �,i -'. 12C
IMP€tm tos Sierue
• APPS 133-4-� ST
S, PRbP c> PA\coMiscR
Appy r
(6, . oNe StQ LISA
?0
•
Ot
•
ExS7-01 /-EJ e
StPeET
RA IQ
-For oRt c3 i&Lc YrG jT
Pon_orci\)Posctc:
e
PRPe91)
Fen) ce
60
YC
14-6
k
Z PZwb�' U9\ff
Po2-R.
q
120
0
C. -c.
Project #.
RECEIVED
JUL 2 8 2014
CSV PERMIT CENTER
SUB #
1
REV. #
I/