2014, 07-23 Permit: BLD-2014-0205 Duct Leakage Affidavit (2)TASH INGTON $TATC{UNIVL RS
EXTENSION ENERGY PROGRAM,.
Permit ti:
Duct Leakage Affidavit (New Construction)
House address or lot number: j32-1 Arc S1 -
City: SCokt, r e Jolley
Cond. Floor Area (ft2):
lygo
Zip: ggol6
Source (circle one):
Estimated Measured
❑ Duct tightness testing is not required. The total leakage test is not required for ducts and air handlers located
entirely within the building thermal envelope. Ducts located in crawl spaces do not qualify for this exception.
Air Handler in conditioned space? ❑ yes ® no Air Handler present during test? ® yes ❑ no
Circle Test Method:
Leakage to Outside otal Leakage
Maximum duct leakage:
Post Construction, total duct leakage: (floor area x .04) = CFM@25 Pa
Post Construction, leakage to outdoors: (floor area x .04) = CFM@25 Pa
Rough -In, total duct leakage with air handler installed: (floor area x .04) = sq CFM@25 Pa
Rough -In, total duct leakage with air handler not installed: (floor area x .03) = CFM@25 Pa
Test Result: 1-I9 CFM@25Pa
Ring (circle one if applicable):
Duct Tester Location: 1-ylrvnc,Ct
Open
1
0
3
Pressure Tap Location: Lpt,uer leer \ re -Fork
I certify that these duct leakage rates are accurate and determined using standard duct testing protocol.
Company Name: Nor i -Z
Technician Signature:
Date: 7-7 3-14
Phone Number: (ZoA) Q6L,-SaSct
Technician
ICy 1 r SL, )Ct1nSnt