Loading...
14-150.00 Spokane Rock Products: Sprague Ave Reconstruction "oFkane Valley' CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 14-029 DEPARTMENT OF PUBLIC WORKS PROJECT: Sprague Street Preservation Project CHANGE ORDER NO: 2 CONTRACTOR: Spokane Rock Products, Inc. CONTRACT DATE: 7/10/2014 JECT NO: 0187 DESCRIPTION OF CHANGES This change order provides payment for furnishing, installing to finish grade a monument case, cover and anchor pipe in accordance with attached WSDOT Std Plan A-10.30-00 and General Special Provision 8-13 . The monument will replace the existing monument near Sprague Ave Station 131+45, O'RT+/-. Item No Description Unit Quantity Unit Price Total 153 Monument Case and Cover EA 1 $524.55 $524.55 Total Amount of this Change Order: $524.55 SUBSTANTIAL COMPLETION Original Date: Prior to this Change Order: Including this Change Order: Original Working Days: 0 Working Days Added by this CO: 0 ting Days including this CO: 0 THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT $ 962566.49 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT(Thru CO 1) $ $15,000.00 TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $ 977,566.49 NET THIS CHANGE ORDER $ $524.55 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 978,091.04 CONTRACTOR ACCEPTANCE: Q4,4 DATE: 8 r-I'/� The contractor hereby accepts this adjudinent under the terms of the original contract for all work perfomed. RECOMMENDED BY: DATE: 5z�7 /7/ Project Manager /1/ fr APPROVED BY: k?J% a g 'LL,q-8/1/4 -I ►�1� DATE: f /7 7 g4 Eric Guth,Public Works Director M APPROVED BY: IV/ DATE: Mike Jackso ,City Manager ATTACHMENTS: GSP 8-13 and WSDOT Std Plan A-10.30-00 Distribution: ORIGINALS TO: City of Spokane Valley Clerk's Office COPIES TO: Contractor, PW Project File, Finance dept, City Manager 0011-1-1 0 7/1/2014 001°.\\ii Public Works Department Spokane Capital Improvement Program 0000 Valley11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.688-0261 • cityhall@spokanevalley.org Change Order Memorandum Date: August 29, 2014 To: Eric Guth Through: Steve Worley From: Craig Aldworth G/1 Re: Change Order 2—Sprague St. Pres. Project, CIP 0187 Budget Account No. 311.000.187.595.30.63.00 Spokane Rock Products Contract 14-029 This Change Order provides payment for furnishing and installing a monument case, cover and anchor. The contract included a pay item to adjust existing monument cases to grade. However, an existing monument case was discovered to be cracked and not re-useable. The Change order increases the cost of the project $524.55. This project is 86.5%funded by Federal Grant STPUL -3840 (010) and the 13.5%match is funded by Spokane Valley Street Preservation Fund 311. There are sufficient funds in the project budget to cover these costs. Original Contract amount= $ 962,566.49 Previous Change Order Cost(Through CO 1)= $ 15,000.00 Change Order#2 Cost= $ 524.55 Project Cost including Change Order#2 = $ 978,091.04 15% of Original Contract amount= $144,384.97 Max Public Works Director Contract authority= $75,000.00 Change Order Cost to date= $15,524.55 Remaining P.W. Director Contract Authority after CO#2 $59,475.45 Cc: Finance Department Clerk's Office 8-13 Monument Cases (******) 8-13.1 Description Add the following: This work also includes salvaging the existing monument; coring the asphalt or setting the monument case within concrete pavement; furnishing and placing the monument case; adjusting the existing monument case; and coordinating with a City Consultant Surveyor who will re-establish the restored point on the set monument within the monument case. 8-13.2 Materials Add the following: Monument shall be furnished by the City. The case, rod and cover shall be furnished by the Contractor. The Case and rod shall conform to Spokane Valley Standard Plan R-145. 8-13.3 Construction Requirements The last sentence is replaced with the following: The Contractor shall salvage the existing monument and deliver it to the Engineer. The Contractor shall coordinate with the licensed Land Surveyor (City Surveyor) who the City has retained to be responsible for the filing of permits for monument removal and replacement with the Washington State Department of Natural Resources, as required by WAC-120-070. The Contractor shall furnish and install the monument case and the monument anchor pipe. The Contractor shall set the monument in cement epoxy with a minimum compressive yield strength of 5,000 psi. The Surveyor Consultant, hired by the City shall furnish, install, label, and mark the monument cap inside the monument case. The Contractor shall notify the City Surveyor at least 7 calendar days prior to the date that the monument case will be placed. (******) When surrounded by hot mix asphalt pavement, a new monument case or adjustment of an existing monument case shall be set after the first lift of paving is completed. The Contractor shall center the case on the point. The Contractor shall place the final HMA lift around the case so that the top of the monument cover shall be recessed below the surrounding pavement elevation in accordance with Section 5-04.3(13). 1 Change Order 2 Sprague St. Preservation Project, CIP 0187 When surrounded by Portland Cement Concrete pavement the monument case shall be placed in the formwork prior to placing the concrete. The top of the monument cover shall be recessed below the surrounding pavement elevation in accordance with Section 5-04.3(13). 8-13.4 Measurement (******) Add the following: "Monument Case and Cover", shall be measured per each. 8-13.5 Payment (******) Add the following: "Monument Case and Cover", per each. "Monument Case and Cover", per each, shall be full payment for furnishing the monument case, cover and anchor pipe and all other tools, labor, equipment, and materials necessary or incidental to install these materials to finish grade. 2 Change Order 2 Sprague St. Preservation Project, CIP 0187 8 3.� TV MO1®itl YNLLYY 011101 M.'reY.SMILA9MU Q T�u eit g 1.014100.0)211.1212 NV BM LavuacanDEMEIG an„wawrunu mom hd : 1 R 1' R 8 13 w m m o Co_ '1�7.4 ow pa 6 .- E = m N O F J y .9 eE : °wZ. am m co14 gr S �.., .0 7Z G = o Wa� s l Za � �' = mYg4�f E ii O 8 P{I�F� 0 a u m '� mm a 2 ", f� Nr . E o m CO•0 a O UJ 2 r (NI M V ui tO . *1 `6- ' i /„..,------- Ihk O w W M �— CA / c -. - -4--J 5 b . e .bR mg A/E Z ,.41E - I .4/6 �, �1 Jr 1 " ii 1 \ ii��///////�//////////%i ii ,:i z re 4.8 QPi C7J2 0 c °a a w z Z \ " O W i W c c v -C F 0 -I- — Q Z m m 5 awJ N rc , z h V V 3 Le 01 LU 60 I— AAI. 111M0 .B-.L .b/E ZL 1 a o . c ° c - co • ,•.'',;';‹ ; ;• 'NIW XFJW.4/L.6L '� .NIP -:9'.Z O 0 • v ; 2 H * MINIMEM �' D. m z pa J o • 'o O O ZO 4.• GW o as G o a ° o w 16 Ow E re W re e 4IL U ��Y/ 113001114213A 4A13 NMtl210 • Sa11i1 CITY OF Public Works Department Capital Improvement Program pomne Valle ® y 11707 E Sprague Ave Suite 106 • Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall@spokanevalley.org Change Order Memo Date: August 29,2014 By: Craig Aldworth Re: Change Order 2 Sprague Street Preservation Project, CIP 0187 1. Describe the Change This Change Order pays for furnishing and installing a monument case, lid and anchor rod per WSDOT Std Drawings. 2. Evolution of the Change The Contract plans call for adjusting existing monument cases to finish grade. An existing monument case near Sprague Ave. Station 131+45, 0' Rt was found to be cracked and not re-useable. This change order will pay for a new monument case to be installed. 3. Payment The $524.55 cost was determined by adding the $149.55 cost of the monument case to the existing $375 bid item price for monument adjustment. 4. Time No additional time was granted or taken away. 5. Prior Approval The Change Order was signed by the acting Public Works Director August 29, 2014. 6. Attachments 8/28/2014 Eller email to John Brueher, SRP John Brueher From: David Eller<david@ellercorporation.com> Sent: Thursday,August 28, 2014 2:56 PM To: John Brueher Subject RE:Sprague St Pres- Draft CO 1 John, Our price on the Monument is$77.15+21%=$93.35+$375=$468.35 David Eller Eller Corporation Office(509).226-0333 Cell(509)-994-1421 From: John Brueher [mailto:]Brueher@spokanerock.corn] Sent: Wednesday,August 27, 2014 9:01 AM To: david@ellercorporation.com Cc: Craig Aldworth Subject: FW: Sprague St Pres - Draft CO 1 David, I received this from Craig,is this acceptable? I am guessing that it isn't as your current price to adjust existing is$375 and I know the monument cost is more than$25. Can you let me know what is an acceptable price so that we can forward this on to the Craig with the City of the Valley and get it approved.If you have any question, please do not hesitate to call. Thank you, 0 ri/(. k A , John Brueher Project Manager Spokane Rock Products,Inc. Office: (509) 789-1695 Cell: (509)720-4896 From:Craig Aldworth [mailto:caldwortht spokanevallev.org] Sent:Tuesday,August 26,2014 3:10 PM To:John Brueher Cc Ed Griner; Dana Haugen Subject:Sprague St Pres Draft CO 1 John The attached Change order pays for furnishing and installing a new monument case and cover at Sprague Ave Station 131+45. The existing monument case is in poor shape and needs replacing: It is also within the north side pave area. 1