2014, 08-01 Permit: SW-14001084 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14001084
Permit Issued Date: 08/01/2014
Expiration Date: 08/01/2015
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
SHP 13-0008
FOLSOM EXCAVATING INC
509-891-1232
Applicant:
Address:
Phone:
Email:
FOLSOM EXCAVATING INC
16701 E VALLEYWAY AVE
VERADALE, WA 99037
509-891-1232
SITE INFORMATION:
Site Address:
Parcel Number:
Assessor's Description
Inspection Area:
Zoning:
11019 E BOONE AVE
45162.0548
OPPORTUNITY E204FT OF S264FT OF TR 30
TOGETHER WITH THE SOUTH 3.41 FT OF LT 8
SHORT PLAT SP2004-04 AUDITOR'S #5155522
:(509)-477-3675
Owner:
Address:
Phone:
Email:
Water District: Modern Electric Water
Company
HOMESTEAD CONSTRUCTION
312SFARR RD
SPOKANE, WA 99206-3666
509-892-0454
Fire District: Spokane Valley Fire
Land Area: 1.26 Acre(s)
CONTRACTOR INFORMATION-
FOLSOEI994DO, Exp. 04/20/2016
FOLSOM EXCAVATING INC
16701 E VALLEYWAY AVE VERADALE, WA 99037
509-891-1232
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.64
$125.00
$151.64
1 $125.00 $125.00
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed: 08/01/2014 10:16:03 Project Coordinator: Julie Shatto
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14001084 Permit Issued Date: 08/01/2014
Expiration Date: 08/01/2015
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 08/01/2014 10:16:03
Project Coordinator: Julie Shatto