1976, 06-01 Permit App: L4093 DuplexCc.inty of Spokane, Wash1.igton
BUILDING CODES DEPARTMENT, N. 811 JEFFERSON, SPOKANE, WASHINGTON 99201
APPLICATION FOR LAND USE OR STRUCTURE PERMIT
GENERAL REQUIREMENTS
PERMIT FEE
/"
PERMIT REQUIRED. A land use or structure permit is required by County Resolution to erect a building or structure of any
kind or alter any building or structure already erected, or to change a land use. Construction mast conform with the
Spokane County Building Code and Zoning Ordinance. Construction is subject to inspection.
WATER. Water supply must be approved by the County and State Health Departments. Where work on water connections disturbs
the surface, shoulders or ditches of County Roads, permission must be obtained from the County Engineer's Office.
SEWAGE SYSTEM. Permits are required in all cases by County Resolutions Nos. 45-133 and 47.235.
SET -BACK FROM PROPERTY LINES. In most zones and under most circumstances, a set -back from the front property line, of at
•
STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set -back and
and egress.
COUNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and work
performed in accordance with stakes. Points of ingress and egress must be approved by the County Engineer.
MOVING OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County
Highway, clearance must be obtained from the County Engineer and/or State Highway Department.
ACCESSORY BUILDINGS. Accessory buildings (garages, sheds, etc.) require a separate permit.
RESTRICTIVE COVENANTS. Builders should check provisions of covenants or dedications and easements running
which are enforceable through civil action. County Officials can not bring action to enforce covenants or
APPLICANT FILL IN BELOW THIS LINE
least 25' is required, a 5' side yard, 15' side yard from a flanking street, and a 25' rear yard are required.
ingress j
must be
or State
with the land
dedications.
Name of Owner S ASTAit.. (2-D
Architect
Engineer
Contractor
iNr-ctA,41.- Co e_p
Address
Address
Address
Address
, is
Legal Description of Property Give complete description from deed, tax receipt, etc 1
(. N
+2 a
Phone
Phone
Phone
Phone
Gz-4Z.11C,
We -L ►i OO cl. 't
DESCRIPTION OF WORK: New _ Addition
Size of Lot SQ.t2 A'C t Al- N iItD/)7=- %3 32/
rii 1`,i .• ,, iSc)lawn 3 .4 c4- -01,Q.J
Rem
#31...)%4‘1 J.y,-.. j" N /t.7.v i
odel Moving
oving
,q� j,y �
Bldg. Zone " Fire Zone
Sewage System Csonst.
(Fr., Con Br., etc.)
au
Sq. Ft
Valuation S� ��0• —
Chimneys Lireplace `..
(Kind) (Number
Int. Wall Finish u.)4t%
Stories imensions D --Q)009 Total
Rooms 12- Baths a Basement T--•At1 Foundation Const GC31JC-L' F-1-�
¢� Full, part, none
Heat. Systemi-At'.J(&. Ci-eC.Type of Roofing
Use of Bldg. VCS ► CVO utt3 , Z/ /7_, ,.�fy
Ext. Finish T - t t i
No. of Units a Bedrooms
PLOT PLAN
Draw sketch with dimensions showing: (1) property lines; (2) street or road locations; (3) location of existing and
proposed buildings; (4) distance to property lines and streets; (5) dimensions of buildings; (6) location of sewage sys-
tem and water supply lines.
NORTH
RESIDENTIAL — COMMERCIAL
Kcc'cl4QA's
SOUTH
ify 1.1. mation submitted is correct
State License No.
22,3-,I -115-%%
Ind. Ins. Acct. No.
REQUIRED
Plumbing Permit
Heating Permit
Sewage Permit
Plans Received
Plans Checked
Plans Returned
Plans Picked Up
Plans Mailed
t
and there are no other structures located on this property except
k
Owner or Agent ate
A LAND USE OR STRUCTURE PERMIT MUST BE ON THE PREMISES BEFORE CONSTRUCTION COMMENCE1.
THIS IS NOT A PERMIT.
(d3,1,L. /P .C) DO NOT WRITE BELOW THIS LINE
Tour street address will be 1 \ 9 a...\ 'E er3ov to
Sewage Permit Number Issued Building Perm1C' r�Receipt
Remarks
(;) 41) 46
Form 523 Bldg. Code
e
r
0
at3OCIE_
fl
c
,
PARCEL NO. 16541 9034
ADDRESS - 11721 East Boone
LEGAL DESCRIPTION:
That portion of Tract 34, Opportunity Described as
follows:
Begin at A point on south line of said tract, 199.2
ft. east of SW corner then north 221.8 ft., then West
26 ft., then north 100 ft., then east 153.6 ft., then
south 321.4 ft., then West 127.6 ft., to the point of
beginning.