Loading...
1976, 06-01 Permit App: L4093 DuplexCc.inty of Spokane, Wash1.igton BUILDING CODES DEPARTMENT, N. 811 JEFFERSON, SPOKANE, WASHINGTON 99201 APPLICATION FOR LAND USE OR STRUCTURE PERMIT GENERAL REQUIREMENTS PERMIT FEE /" PERMIT REQUIRED. A land use or structure permit is required by County Resolution to erect a building or structure of any kind or alter any building or structure already erected, or to change a land use. Construction mast conform with the Spokane County Building Code and Zoning Ordinance. Construction is subject to inspection. WATER. Water supply must be approved by the County and State Health Departments. Where work on water connections disturbs the surface, shoulders or ditches of County Roads, permission must be obtained from the County Engineer's Office. SEWAGE SYSTEM. Permits are required in all cases by County Resolutions Nos. 45-133 and 47.235. SET -BACK FROM PROPERTY LINES. In most zones and under most circumstances, a set -back from the front property line, of at • STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set -back and and egress. COUNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and work performed in accordance with stakes. Points of ingress and egress must be approved by the County Engineer. MOVING OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County Highway, clearance must be obtained from the County Engineer and/or State Highway Department. ACCESSORY BUILDINGS. Accessory buildings (garages, sheds, etc.) require a separate permit. RESTRICTIVE COVENANTS. Builders should check provisions of covenants or dedications and easements running which are enforceable through civil action. County Officials can not bring action to enforce covenants or APPLICANT FILL IN BELOW THIS LINE least 25' is required, a 5' side yard, 15' side yard from a flanking street, and a 25' rear yard are required. ingress j must be or State with the land dedications. Name of Owner S ASTAit.. (2-D Architect Engineer Contractor iNr-ctA,41.- Co e_p Address Address Address Address , is Legal Description of Property Give complete description from deed, tax receipt, etc 1 (. N +2 a Phone Phone Phone Phone Gz-4Z.11C, We -L ►i OO cl. 't DESCRIPTION OF WORK: New _ Addition Size of Lot SQ.t2 A'C t Al- N iItD/)7=- %3 32/ rii 1`,i .• ,, iSc)lawn 3 .4 c4- -01,Q.J Rem #31...)%4‘1 J.y,-.. j" N /t.7.v i odel Moving oving ,q� j,y � Bldg. Zone " Fire Zone Sewage System Csonst. (Fr., Con Br., etc.) au Sq. Ft Valuation S� ��0• — Chimneys Lireplace `.. (Kind) (Number Int. Wall Finish u.)4t% Stories imensions D --Q)009 Total Rooms 12- Baths a Basement T--•At1 Foundation Const GC31JC-L' F-1-� ¢� Full, part, none Heat. Systemi-At'.J(&. Ci-eC.Type of Roofing Use of Bldg. VCS ► CVO utt3 , Z/ /7_, ,.�fy Ext. Finish T - t t i No. of Units a Bedrooms PLOT PLAN Draw sketch with dimensions showing: (1) property lines; (2) street or road locations; (3) location of existing and proposed buildings; (4) distance to property lines and streets; (5) dimensions of buildings; (6) location of sewage sys- tem and water supply lines. NORTH RESIDENTIAL — COMMERCIAL Kcc'cl4QA's SOUTH ify 1.1. mation submitted is correct State License No. 22,3-,I -115-%% Ind. Ins. Acct. No. REQUIRED Plumbing Permit Heating Permit Sewage Permit Plans Received Plans Checked Plans Returned Plans Picked Up Plans Mailed t and there are no other structures located on this property except k Owner or Agent ate A LAND USE OR STRUCTURE PERMIT MUST BE ON THE PREMISES BEFORE CONSTRUCTION COMMENCE1. THIS IS NOT A PERMIT. (d3,1,L. /P .C) DO NOT WRITE BELOW THIS LINE Tour street address will be 1 \ 9 a...\ 'E er3ov to Sewage Permit Number Issued Building Perm1C' r�Receipt Remarks (;) 41) 46 Form 523 Bldg. Code e r 0 at3OCIE_ fl c , PARCEL NO. 16541 9034 ADDRESS - 11721 East Boone LEGAL DESCRIPTION: That portion of Tract 34, Opportunity Described as follows: Begin at A point on south line of said tract, 199.2 ft. east of SW corner then north 221.8 ft., then West 26 ft., then north 100 ft., then east 153.6 ft., then south 321.4 ft., then West 127.6 ft., to the point of beginning.