Loading...
2005, 07-29 Permit: 05002649 Plumbing Reversal*Wane jValley BUILDING DIVISION 1 1707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Site Information Project Information 1 Site Address: 12021 E BOONE AVE Parcel Number: 45161.0628 Subdivision: Block: Lot: Zoning: UR -3 Urban Residential 3.5 Owner: PIERCE, VICKIE Address: 12021 E BOONE AVE SPOKANE VALLEY, WA 99206 Building Inspector: BARRY HUSFLOEN Water Dist: Project Number: 05002649 Inv: 1 Issue Date: 07/29/2005 Permit Use: ROAD OBSTRUCTION FOR SEWER REVERSAL Applicant: Z -BEST CONSTRUCTION PO BOX 13421 SPOKANE, WA. 99213 Contact: Z -BEST CONSTRUCTION PO BOX 13421 SPOKANE, WA. 99213 Setbacks - Front: Left: Right: Group Name: Project Name: ROW Phone: (509) 891-9949 Phone: (509) 891-9949 Rear: Permits Plumbing. Permit Contractor: BELKNAP PLUMBING License #: BELKNP*071D6 WATER PIPING - DWV FOR PLUMBING INSPECTIONS CALL (509) 688-0054. 1 $6.00 PROCESSING FEE $35.00 Total Permit Fee: $41.00 Right of Way Contractor: Z BEST CONSTRUCTION License #: ZBESTC*077RH OBSTRUCTION / INSPECTION I $70.00 FOR RIGHT OF WAY INSPECTIONS CALL (509) 869-5373 ENGINEERING Total Permit Fee: $70.00 Payment Summary Total Fees AmountPaid AmountOwing $111.00 $111.00 $0.00 Tran Date Receipt # Payment Amt 07/29/2005 2157 $111.00 Processed By: MIKE TURBAK Printed By: KURTZ, KARI Page 1 of 1 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for electncal winng, State Department of Labor Permts and inspections for Sewer Connection, Spokane County Utilities Division And Industries 324-2640 477-3604 Permits and inspections for on-site septic systems, Spokane Regional Fire spnnkler and alarm systems and pnvate access road inspections, Spokane Valley Health Distnct 324-1560 Fire Department 892-4122 State law RCW 19.122 requires that prior to any excavation the "CALL BEFORE YOU DIG- center must be notified. Call before you dig at least 2 working days in advance, 456-8000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the 91an re w be acompleted. Owner / Agent / ��� / /Y ���7//�i12•,� \ Date Staff Approval Date Sfilkane Valley Call 24 hours before inspection required Phone 509.688-0195 Fax 509.688-0037 DEPARTMENT OF. PUBLIC WORKS Anticipated start date 7/ /0 Permit # ROW CONSTRUCTION PERMIT Location of property h)O--/ E. rrjx-e (Address Parcel #, If available) Applicant Name Fax Address Phone Contractor's Name ..Z- -15 "65-1 (10/1,775-10-7--; Cirl Address Po.d7,77.3c.f/ Phone 2W -97V? Contractor's Reg.# Z Bi.A57-04()97/qg Expires PR ECT DESCRIPTION (Provide site sketch or plan as necessary for clarity) EDriveway Sewer Connection Curb & Gutter Cable/Conduit/Pole n Water Installation/Repair Pavement Cut r Gas Installation/Repair Sidewalk Repair/Construction ri Other Dimensions Bond/insurance certification must be on file with the City. Bond # SPECIAL CONDITIONS: Permittee Signature Approved Date I hereby authorize the City of Spokane Valley to charge the fee for this permit to my credit card. Card # Expiration Date Name of Holder Signature Fees Paid$ Date Init (Application) (Inspection) In addition to the permit application fee of $16.00 (utility) or $25.00 (construction), inspection on each permit will be billed to the permittee at a rate of $50.00 per hour with a $25.00 (1/2 hour) minimum. Permittee signature constitutes an agreement to these terms and provisions. Work completed satisfactorily (Signed) Date Permit not valid until One -Call Notification Ticket # entered here 5-43-45-5/3 PERMIT MUST BE KEPT ON SITE Excerpts from Spokane Valley Standards (3.24, and details A8 and A -8a): • Every driveway approach must provide access to an off road parking area located on private property. The driveway shall be of sufficient length so a vehicle In the driveway does not project into the road right of way, sidewalk, or pathway. • Public or private driveways in industrial, commercial, multiple family, church or any like use shall be constructed to allow vehicles to exit without backing onto a public road. • Driveway approaches shall be constructed to avoid interference with existing drainage inlets, culverts, road lighting standards, utility poles, traffic regulating devices, fire hydrants or other public utilities. The applicant shall bear the cost of relocating any such public facility. • Driveway approach grades within the right of way shall not exceed 8% in urban area, or 2% in rural areas. Driveway grades shall not exceed 10% within ten feet of a city right of way. See Standards for a more complete listing of requirements.