Loading...
2013, 10-29 Permit: SW-13001902 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13001902 Permit Issued Date: 10/29/2013 Expiration Date: 10/29/2014 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION HILLVIEW ACRES RICHARDSON, ANTHONY B Applicant: RICHARDSON, ANTHONY B Address: 12113 E BOONE AVE SPOKANE VALLEY, WA 99206 Phone: Email: SITE INFORMATION: Site Address: 12113 E BOONE AVE Owner: RICHARDSON, ANTHONY B Parcel Number: 45161.0708 Address: 12113 E BOONE AVE SPOKANE VALLEY, WA 99206 Phone: Assessor's Description: OPPORTUNITY PT OF B36 BEG AT SECOR TH Email: N299.7FT TH S89D EG 42MIN W463.6FT FOR TRUE POB TH S89DEG 42MIN W9OFT TH S TO SL TH E9OFT TH N TO TRUE POB Inspection Area: : (509)-477-3675 Water District: Modern Electric Water Fire District: Spokane Valley Fire Company Zoning: Land Area: 32373 Square Feet CONTRACTOR INFORMATION: OWNER, Exp. 12/31/2015 OWNER PERFORMING THE WORK SAME AS SITE ADDRESS SAME, WA 00000 509-218-7562 DETAILS: Class Type Quantity Unit Charge Value SEWER ALTERATION TO EXISTING 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.32 $125.00 $151.32 $125.00 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 10/29/2013 13:27:10 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13001902 Permit Issued Date: 10/29/2013 Expiration Date: 10/29/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 10/29/2013 13:27:10 Project Coordinator: Kathy Cummings