Loading...
2014, 06-30 Permit: SW-14000974 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14000974 Permit Issued Date: 06/30/2014 Expiration Date: 06/30/2015 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION SHP-14-06 SWEATT, BERNADETTE / DEUTSCH, THOMAS A 323-706-9855 Applicant: Address: Phone: Email: SWEATT, BERNADETTE / DEUTSCH, THOMAS A PO BOX 3807 COEUR D ALENE, ID 83816 323-706-9855 SITE INFORMATION: Site Address: Parcel Number: Assessor's Description: Inspection Area: Zoning: 12117 E BOONE AVE 45161.0784 OPPORTUNITY PTN OF BLK 36 DAF; BEG AT SE COR TH N299.7FT T H S89DEG 42MIN W273.6FT TO POB TH CONT W190FT TH S TO S LN TH E 190FT TH N TO POB :(509)-477-3675 Owner: Address: Phone: Email: Water District: Modern Electric Water Company SWEATT, BERNADETTE / DEUTSCH, THOMAS A PO BOX 3807 COEUR D ALENE, ID 83816 323-706-9855 Fire District: Spokane Valley Fire Land Area: 54150 Square Feet CONTRACTOR INFORMATION: JLHAWE*222LE, Exp. 05/31/2016 J L HAWKINS EXCAVATING 9722 E NORA AVE SPOKANE, WA 99206-0000 509-924-9025 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.64 $125.00 $151.64 1 $125.00 $125.00 $125.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 06/30/2014 14:29:44 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14000974 Permit Issued Date: 06/30/2014 Expiration Date: 06/30/2015 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 06/30/2014 14:29:44 Project Coordinator: Kathy Cummings