2014, 06-30 Permit: SW-14000974 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14000974
Permit Issued Date: 06/30/2014
Expiration Date: 06/30/2015
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
SHP-14-06
SWEATT, BERNADETTE / DEUTSCH, THOMAS A
323-706-9855
Applicant:
Address:
Phone:
Email:
SWEATT, BERNADETTE / DEUTSCH,
THOMAS A
PO BOX 3807
COEUR D ALENE, ID 83816
323-706-9855
SITE INFORMATION:
Site Address:
Parcel Number:
Assessor's Description:
Inspection Area:
Zoning:
12117 E BOONE AVE
45161.0784
OPPORTUNITY PTN OF BLK 36 DAF; BEG AT SE
COR TH N299.7FT T H S89DEG 42MIN W273.6FT
TO POB TH CONT W190FT TH S TO S LN TH E
190FT TH N TO POB
:(509)-477-3675
Owner:
Address:
Phone:
Email:
Water District: Modern Electric Water
Company
SWEATT, BERNADETTE / DEUTSCH,
THOMAS A
PO BOX 3807
COEUR D ALENE, ID 83816
323-706-9855
Fire District: Spokane Valley Fire
Land Area: 54150 Square Feet
CONTRACTOR INFORMATION:
JLHAWE*222LE, Exp. 05/31/2016
J L HAWKINS EXCAVATING
9722 E NORA AVE SPOKANE, WA 99206-0000
509-924-9025
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.64
$125.00
$151.64
1
$125.00 $125.00
$125.00
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 06/30/2014 14:29:44 Project Coordinator: Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14000974 Permit Issued Date: 06/30/2014
Expiration Date: 06/30/2015
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 06/30/2014 14:29:44 Project Coordinator: Kathy Cummings