Loading...
2012, 08-31 Permit: SW-12002118 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT APPLICATION Penalties will be assessed for commencing work without a permit. Application Number: SW -12002118 Application Date: 08/31/2012 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION SOUTH GREENACRES PH 4 B & M LANDSCAPING & REMODELING 509-496-7366 Applicant: B & M LANDSCAPING & REMODELING Address: Phone: Email: 18424 E. SINTO AVE. • SPOKANE, VALLEY, WA 99016 509-496-7366 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description Inspection Area: Zoning: 18317 E BOONE AVE 55181.2709 PLAT A VALLEY VIEW ADD PT OF L4-5 612 S141FT OF W1/2 L4;S104F T L5 : (509)-477-3675 Owner: Address: Phone: Email: Water District: Consolidated Irrigation District #19 ORTON, RANDALL L 18317 E BOONE AVE SPOKANE VALLEY, WA 99016 509-496-7366 Fire District: Spokane Valley Fire Land Area: 18497 Square Feet CONTRACTOR INFORMATION• BMLANML923M4, Exp. 06/14/2013 B & M LANDSCAPING & REMODELING 18424 E. SINTO AVE. SPOKANE, VALLEY, WA 99016 509-496-7366 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00.,, $125.00 FEE DETAIL' Processing - Utilities Utilities Permit Total Fee: $25.94 $125.00 $150.94 REVIEW STEPS REQUIRED: Utilities Sewer 08/31/2012 Stella Matei-Rowley COMPLETE CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 08/31/2012 09:57:25 Project Coordinator: Julie Shatto SPOKANE COUNTY BUILDING AND PLANNING PERMIT APPLICATION Penalties will be assessed for commencing work without a permit. Application Number: SW -12002118 Application Date: 08/31/2012 FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. . ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF;;. UNDERGROUND FACILITIES. SIGNATURE AND DISCLAIMER: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of law and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Date Printed: 08/31/2012 09:57:25 Project Coordinator: Julie Shatto