Loading...
2012, 07-17 Permit: SW-12001761 SewerSPOKANE COUNTY BUILDING AND PLANNING - PERMIT Application Number: SW -12001761 Permit Issued Date: 07/17/2012 Expiration Date: Project Description: SEWER CONNECTION Project Name: CORBIN Permit Type: SEWER Primary Contact: OVERLAND EXCAVATION INC Applicant: OVERLAND EXCAVATION INC Address: P.O. BOX 277 NEWMAN LAKE, WA 99025 Phone: (509)939-7984 Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: 18602 E BOW AVE 55184.3504 BOW SUBDIVISION BOW SUB PT B24 CORBIN ADD TO GREENACRES L4 B1 Water District: Consolidated Irrigation District #19 Zoning: Land Area: 9600 Square Feet Owner: Address: Phone: Email: WOOD, CAROLYN 18602 E BOW AVE GREENACRES, WA 99016-9784 Fire District: Spokane Valley Fire CONTRACTOR INFORMATION: General Contractor OVERLEI951 LE OVERLAND EXCAVATION INC 24811 E WELLESLEY AVE OTIS ORCHARDS, WA 99027 509-226-1127 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 07/17/2012 09:08:02 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001761 07/17/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 07/17/2012 09:08:02 Printed by: IIS APPPOOL\ASP.NET v4.0