2012, 07-17 Permit: SW-12001761 SewerSPOKANE COUNTY BUILDING AND PLANNING
- PERMIT
Application Number: SW -12001761
Permit Issued Date:
07/17/2012
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: CORBIN
Permit Type: SEWER
Primary Contact: OVERLAND EXCAVATION INC
Applicant: OVERLAND EXCAVATION INC
Address: P.O. BOX 277
NEWMAN LAKE, WA 99025
Phone: (509)939-7984
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
18602 E BOW AVE
55184.3504
BOW SUBDIVISION
BOW SUB PT B24 CORBIN ADD TO
GREENACRES L4 B1
Water District:
Consolidated Irrigation
District #19
Zoning: Land Area: 9600 Square Feet
Owner:
Address:
Phone:
Email:
WOOD, CAROLYN
18602 E BOW AVE
GREENACRES, WA 99016-9784
Fire District: Spokane Valley Fire
CONTRACTOR INFORMATION:
General Contractor
OVERLEI951 LE
OVERLAND EXCAVATION INC
24811 E WELLESLEY AVE
OTIS ORCHARDS, WA 99027
509-226-1127
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER
SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 07/17/2012 09:08:02
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001761 07/17/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 07/17/2012 09:08:02
Printed by: IIS APPPOOL\ASP.NET v4.0