2014, 05-30 Permit: SW-14000742 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14000742
Permit Issued Date: 05/30/2014
Expiration Date: 05/30/2015
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
CORBIN
MUELLER EXCAVATING
509-326-1016
Applicant:
Address:
Phone:
Email:
MUELLER EXCAVATING
3743 W OLYMPIC AVE
SPOKANE, WA 99205
509-326-1016
SITE INFORMATION:
Site Address:
Parcel Number:
18518 E BOW AVE
55184.2412
Assessor's Description: (CITY OF SPOKANE VALLEY) PARCEL "A" OF
ROS (AFN #5752768) EXC/ PTN LYG NELY OF
FOL DESC LN: COMMENCING AT NWLY COR OF
LT 5 BLK 1 TH S71 °57'03"W ALG NLY LN OF LT 3
BLK 24 CORBIN ADD TO GREENAC
Inspection Area: : (509)-477-3675
Zoning:
Owner:
Address:
Phone:
Email:
Water District: Consolidated Irrigation
District #19
MCBRIDE, LORNA R
4003 VIOLET RD
CORPUS CHRISTI, TX 78410
Fire District: Spokane Valley Fire
Land Area: 16054.5 Square Feet
CONTRACTOR INFORMATION:
MUELLE*181KK, Exp. 03/01/2016
MUELLER EXCAVATING
3743 W OLYMPIC AVE SPOKANE, WA 99205
509-326-1016
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.64
$125.00
$151.64
1 $125.00 $125.00
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 05/30/2014 08:24:42 Project Coordinator: Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14000742 Permit Issued Date: 05/30/2014
Expiration Date: 05/30/2015
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 05/30/2014 08:24:42 Project Coordinator: Kathy Cummings