Loading...
2004, 07-26 Permit: 04005438 SewerTflll SroKiii, Coma SPOKANE COUNTY DEPARTMENT OF BUILDING & PLANNING 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Site Information Project Information Site Address: 1119 N BOWDISH RD Parcel Number: 45162.0950 Subdivision: OPPORTUNITY TR # 01-354 Block: 49 Lot: Zoning: UNK Unknown Owner: TIPPS, EDWARD W & PATRICIA J Address: 1119 N BOWDISH RD SPOKANE, WA 99206-4907 Building Inspector: BOBBY STONE Water Dist: Project Number: 04005438 Inv: 1 Issue Date: 7/26/2004 Permit Use: SEWER CONNECTION - HILLVIEW ACRES Applicant: INLAND NW EXCAVATING PO BOX 11932 SPOKANE, WA 99211 Contact: INLAND NW EXCAVATING PO BOX 11932 SPOKANE, WA 99211 Setbacks - Front: Left: Right: Group Name: Project Name: Phone: (509) 994-5654 Phone: (509) 994-5654 Rear: 1 Permits Sewer Connection Permit Contractor: INLAND NW EXCAVATING License #: INLANNE973QK SEWER CONNECTION 1 585.00 PROCESSING FEE Total Permit Fee: FOR SEWER INSPECTIONS CALL (509) 477-3604 UTILITIES 8:30-5:00 PM MONDAY THRU FRIDAY Call for inspection prior to cover. ONE WORKING DAY NOTICE REQUIRED. Contractor or applicant is to field locate and confirm the elevation and position of sewer stub prior to any other excavation. Sewer stubs are to be checked prior to connection to ensure that they have acceptable grade and are clear and unobstructed to the main sewer. Sewer lines should be constructed to allow for gravity flow from the lowest level of the structure. This permit must be presentcd to the job site inspector for verification. To locate buried cables, gas piping, water lines, ctc. CALL BEFORE YOU DIG, (509)456-8000. STATE LAW RCW 19.122 REQUIRES THAT PRIOR TO ANY EXCAVATION THE "CALL BEFORE YOU DIG" CENTER BE NOTIFIED. CALL BEFORE YOU DIG AT LEAST 2 WORKING DAYS IN ADVANCE, (509)456-8000. Spokane County Code requires the installer comply with all requirements of the Washington State Dept of Labor and Industries, including those related to trench safety. $15.00 5100.00 1 Payment Summary Total Fees AmountPaid AmountOwing $100.00 $100.00 $0.00 Tran Date 7/26/2004 Processed By: SHATTO, JULIE Printed By: HINTZ, FAITH Page 1 of 1 Receipt # 4150 Payment Amt $100.00 PERMIT NOTICE ^~~~~ It is the responsibility of thoappocant/pennittee to see to 1 that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of-way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right- of-wayuot~oenyou,p,opo,tyanomeoomu|impmveuat"eoocu,u.Tho,aoponuibmtyt000mp|y*itkappooau|enotuaoxp,ovioionoUooso|wywimmo permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing. 4. INSULATION prior to the installation of drywall. 5. PLUMBING - after rough -in, before covering, and final. 6. MECHANICAL rough -in of piping, before covering, metal chimneys before concealrnent, and final. 7. FINAL - when complete and prior 10 occupancy and/or use. Please provide 24 hours riotice. Alt permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be com- pleted prior to final approval of a building or issuance of a Certificate of Occupancy. om'p|medp,|or»ofme|oppmva|ofahuiNinOn,isovonueo+aCortiUoateofOcuvpenuy 8. MANUFACTURED HOMES Final inspection required when uomp|v^o, staim, hundnsi|n, nwrting, etc. inmaneo, and prior 10 occupancy; completed inspection record card must be available on site. 9. SEWERS prior 10 cover 10. RIGHT-OF-WAY/APPROACH prior to ptacemerit of concrete. or, if gravel approach, after completion. In addition to the oUuvo, any plumbing or mechanical systems or material which would be concealed by framing, drywao, ovnomm, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/4HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire inspections, Department ofBuilding &Planning 477-3675 • Construction in a flood p|ain, Division of Engineering & Roads 477-3600 • Permits and inspections for etectricat wiring, State Department of Labor and lridustries 324-2640 • Permits and inspections for on-site waste disposal system, Spokarie Regional Health District 324-1560 • Road cuts for utilities or driveways, Division 01 Engineering & Roads - 48-HOLJR NOTICE REQUIRED 477-3600 or State Department 01 Transportation 456-3000 • Sewer connection, Division of Utilities 477-3604 or City Public Works Department 625-6300 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, this permit will be considered null arid void by limitation 1 the work authorized by the permit is not commenced or is stopped for a period of 180 days, untess a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions. All refund requests must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days after the date of fee payment. Retunds 01 not more than 80% 01 the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after fee payment. MISTAKE? If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Building and Planning at the below address. Spokane County Department of Building & Planning 1026 West Broadway Avenue Spokane, WA 99260 Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133 FORM 30-050202 BI DG PERNIIT