Loading...
2014, 05-29 Permit: SW-14000737 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14000737 Permit Issued Date: 05/29/2014 Expiration Date: 05/29/2015 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION HILLVIEW ACRES LARRY MILLER EXCAVATING 509-218-3335 Applicant: LARRY MILLER EXCAVATING Address: Phone: Email: 7117 E RUTTER AVE SPOKANE, WA 99212 509-218-3335 SITE INFORMATION: Site Address: Parcel Number: 710 N BOWDISH RD 45164.0169 Assessor's Description: OPPORTUNITY PTN TR 88 DAF: BEG AT NW COR TR 88, TH S ALG W LN 160FT TO POB, TH E PARA WITH N LN SD TR 165FT, TH N PARA WITH W LN 160FT TO N LN TR 88, TH E ALG SD N LN 11.93FT, TH S PARA WITH E LN Inspection Area: : (509)-477-3675 Zoning: Owner: SCHLECHT, DEBRA J Address: 710 N BOWDISH RD SPOKANE VALLEY, WA 99206 509-991-1600 Phone: Email: Water District: Modern Electric Water Company Fire District: Spokane Valley Fire Land Area: 48177 Square Feet CONTRACTOR INFORMATION: LARRYME918DR, Exp. 03/19/2015 LARRY MILLER EXCAVATING 7117 E RUTTER AVE SPOKANE, WA 99212 509-218-3335 DETAILS: Class SEWER Type Quantity Unit Charge Value FEE DETAIL: Processing - Utilities Utilities Permit SEWER CONNECTION Total Fee: $26.64 $125.00 $151.64 1 $125.00 $125.00 $125.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 05/29/2014 09:53:17 Project Coordinator: Julie Shatto SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14000737 Permit Issued Date: 05/29/2014 Expiration Date: 05/29/2015 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 05/29/2014 09:53:17 Project Coordinator: Julie Shatto