Loading...
2013, 08-01 Permit: SW-13001341 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13001341 Permit Issued Date: 08/01/2013 Expiration Date: 08/01/2014 Project Description: SEWER CONNECTION Project Name: CRONK Primary Contact: GOBER'S LLC Applicant: GOBER'S LLC Phone: 509-924-5372 Address: 11215 E TRENT AVE SPOKANE, WA 99206 Phone: 509-924-5372 Email: SITE INFORMATION: Site Address: Parcel Number: 19211 E BOONE AVE 55172.0157 Assessor's Description: CORBIN ADDITION TO GREENACRES LOT 28 EXC W 19.7FT THEREOFALL LOT 29 & PTN LT 2 DAF; BEG AT NE COR LOT 29 TH S 77DEG 18MIN W, 206.51FT; TH N 269.42 FT; TH S 89DEG 20MIN 24SDS E, 201.48FT; TH S 221.70FT Inspection Area: : (509)-477-3675 Owner: Address: Phone: Email: WARREN, JEFF 19211 E BOONE AVE GREENACRES, WA 99016 509-990-1116 Water District: Consolidated Irrigation Fire District: Spokane Valley Fire District #19 Zoning: Land Area: CONTRACTOR INFORMATION: GOBERL*899L7, Exp. 06/27/2015 GOBER'S LLC 11215 E TRENT AVE SPOKANE, WA 99206 509-924-5372 DETAILS: Class SEWER Type Quantity Unit Charge Value FEE DETAIL: Processing - Utilities Utilities Permit SEWER CONNECTION Total Fee: $26.32 $125.00 $151.32 1 $125.00 $125.00 $125.00 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 08/01/2013 12:30:38 Project Coordinator: Dawn Dompier SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13001341 Permit Issued Date: 08/01/2013 Expiration Date: 08/01/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 08/01/2013 12:30:38 Project Coordinator: Dawn Dompier