Loading...
14-175.00 Spokane Rock Products: Sprague Ave Reconstruction NCS TYokane 4i0 . Malleya CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 14-029 DEPARTMENT OF PUBLIC WORKS I PROJECT: Sprague Street Preservation Project CHANGE ORDER NO: 5 CONTRACTOR: Spokane Rock Products, Inc. CONTRACT DATE: 7/10/2014 JECT NO: 0187 DESCRIPTION OF CHANGES This change order provides payment for removing Plastic Wide Lane Line Type Cl and installing Plastic Type B Plastic Wide Lane Line on the west side of the Sprague Ave UP RR underpass per the attached CO 5 Gore Plan. It also pays for installing Type B Plastic Crosswalk 2'x 8' panels at the following intersection crosswalks on Sprague Ave: E. Farr, 1 CL panel and 1 panel at south curb; W. Farr 1 CL panel and 1 panel at south curb; E. Mullan 1 panel at south curb side; E.Vista 1 CL panel;W. Vista 1 CL panel. Item No Description Unit Quantity Unit Price Total 156 Pavement Marking Remobilization LS 1 $100.00 $100.00 157 Remove Wide Lane Line Type C-1 LF 193 $0.25 $48.25 157 Plastic Crosswalk Line, Type B SF 112 $9.63 $1,078.56 158 Plastic Wide Lane Line, Type B LF 330 $6.43 $2,121.90 Total Amount of this Change Order: $3,248.71 SUBSTANTIAL COMPLETION Original Date: Prior to this Change Order: Including this Change Order: Original Working Days: 40 Working Days Added by this CO: 0 Working Days including this CO: 40 THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT $ 962566.49 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT(Thru CO 3) $ 19024.55 TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $ 981,591.04 NET THIS CHANGE ORDER $ 3248.71 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 984,839.75 CONTRACTOR ACCEPTANCE: C ,44 - DATE: ID/211 contractor hereby accepts this adj ent under the terms of the original contract for all work perfomed. RECOMMENDED BY: DATE: /d Z N P oject Manager APPROVED BY: . ...*/�,,i.,,;���►. DATE: (O`Z l )41 Eri uth,Public Works Director APPROVED BY: 4/7A DATE: Mike Jackson,City Manager ATTACHMENTS: CO 5 Gore Pavement Marking Plan Distribution: ORIGINALS TO: City of Spokane Valley Clerk's Office COPIES TO: Contractor, PW Project File,Finance dept,City Manager CJo\y-17S 7/1/2014 Wo W CNI CC Z C3 f, O O z IX ; i i :'4e. 4,. / 0 1 !I ,4A:4, 4: a > W Q C ( CNI III p r r 1 C/ m CO 0 p W / Z h{ LJ L,J w U Q W03 LI 1-21 _ Q I / t w 14 N Z U `I I0- II- O � L� UI I J1 F— U) C) J I-LIz I Z m I1 i V) � J U o m 11 Lo • Z z CO h Q Q 2 i 0 o U II 1 I / -, o / 't cwt I,. CLi 0 4 .._ . „.. , 11 1cn w E — O i O N it a) O O, Q, a) >. .0 O Q O C p L.L '. 111 I{ U) r NW N NQ I✓ a > Q7 Il p a1 0.. O N `. 2 �� I O N Q ! a7 W re) D I� I r0 1o z I 5<-- (2 ;0( _ LL, ,....., I Q I J I1 CD c i 0_Wit W Q 0- II — NWWHSIO a_ w 11 � JZ W V z QCSIw I L -- io I il ( l' .t.7412` it III I w 1 " Il771,,,,•11,:; O � O C/) I I Rd SO 00•I PLOZ/Z/OI a^1PZI7y83H O.L vLSIA-3rI0 IdS-IIw LSIO\QVJ0I V ASOOI..^' G\Ple A1314,?A-any a' °S-L8IO\s!.,U1 S\sl02I°d lel@eO\srlioM .'4 d SjÔk '1hIhCapital Improvement Program Valley11707 E Sprague Ave Suite 106 • Spokane Valley WA 99206 4.00. 509.921.1000♦ Fax: 509.688-0261 • cityhall@spokanevalley.org Change Order Memorandum Date: October 2, 2014 To: Eric Guth Through: Steve Worley From: Craig Aldworth G-/4 Re: Change Order 5—Sprague St. Pres. Project, CIP 0187 Budget Account No. 311.000.187.595.30.63.00 Spokane Rock Products Contract 14-029 This Change Order pays for installing crosswalk panels with Type B Plastic (heat applied) at locations where the Type C-1 Inlay pavement marking could not be installed because they fell on the Centerline step-wedge joint or they were partially on existing pavement. These panels will be installed with Type B Plastic. It also pays for installing a gore line west of the UP RR underpass center bridge abutment as Type B plastic after it was discovered that the re-installation of Jersey barriers on the west side of the UP Railroad underpass center bridge abutments would conflict with the southern existing Type C-1 gore line. The southern gore line was removed. After the Jersey Barrier was installed the gore line will be reinstalled to not conflict with the barrier placement with Type B heat applied Plastic. The change order is estimated to increase the cost of the project$3,248.71. This project is 86.5%funded by Federal Grant STPUL -3840 (010)and the 13.5%match is funded by Spokane Valley Street Preservation Fund 311. There are sufficient funds in the project budget to cover these costs. Original Contract amount= $ 962,566.49 Previous Change Order Cost(Through CO 4)= $ 19,024.55 Change Order#5 Cost= $ 3,248.71 Project Cost including Change Order#5= $ 984,839.75 15% of Original Contract amount= $144,384.97 Max Public Works Director Contract authority= $75,000.00 Change Order Cost to date= $22,273.26 Remaining P.W. Director Contract Authority after CO #5 $52,726.74 Cc: Finance Department Clerk's Office sCITY OF Public Works Department ookane Capital Improvement Program Valley 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000♦ Fax: 509.921.1008 • cityhall@spokanevalley.org Change Order Memo Date: October 2, 2014 By: Craig Aldworth Re: Change Order 5 Sprague Street Preservation Project, CIP 0187 1. Describe the Change This Change Order pays for removing Plastic Wide Lane line, Type C-1 and installing Type B wide lane line defining the south side center gore line on the downstream end of the UP RR underpass bridge abutment. It also pays for installing Type B Plastic Crosswalk Lines at locations where rolling in the C1 inlay tape into hot asphalt was not possible. 2. Evolution of the Change It was discovered that the re-installation of Jersey barriers on the west side of the UP Railroad underpass center bridge abutments would conflict with the southern existing Type C-1 gore line. The southern gore line was removed. After the Jersey Barrier was installed the gore line will be reinstalled to not conflict with the barrier placement with Type B heat applied Plastic. Several C-1 inlay Crosswalk panels could not be installed because the fell on the Centerline step-wedge joint or they were partially on existing pavement. These panels will be installed with Type B Plastic. 3. Payment The cost was based on the $8.60 /square foot price for Type B Plastic Crosswalks on the Argonne and Sprague Street Preservation Project. Since the Argonne and Sprague unit bid price was for a much larger quantity, it was used to establish the price for the Subcontractor and 12% was added for Prime overhead and profit to obtain the change order price. The linear foot unit price for the 8 inch wide lane line was derived from the crosswalk square foot unit price by multiplying by 2/3. The Plastic Lane Line, Type C-1 removal price was set at the cost for Temp pavement marking because it could be removed by simply pulling it off in strips. 4. Time No additional time was granted or taken away. 5. Prior Approval The Change Order was approved 10/2/14 by Eric Guth, Public Works Director. 6. Attachments CO 5 Gore Striping Plan