PROJECT: Sprague Street Preservation Project CHANGE ORDER NO: 5
CONTRACTOR: Spokane Rock Products, Inc. CONTRACT DATE: 7/10/2014
JECT NO: 0187
DESCRIPTION OF CHANGES
This change order provides payment for removing Plastic Wide Lane Line Type Cl and installing Plastic Type B Plastic Wide
Lane Line on the west side of the Sprague Ave UP RR underpass per the attached CO 5 Gore Plan.
It also pays for installing Type B Plastic Crosswalk 2'x 8' panels at the following intersection crosswalks on Sprague Ave:
E. Farr, 1 CL panel and 1 panel at south curb; W. Farr 1 CL panel and 1 panel at south curb;
E. Mullan 1 panel at south curb side; E.Vista 1 CL panel;W. Vista 1 CL panel.
Item No Description Unit Quantity Unit Price Total
156 Pavement Marking Remobilization LS 1 $100.00 $100.00
157 Remove Wide Lane Line Type C-1 LF 193 $0.25 $48.25
157 Plastic Crosswalk Line, Type B SF 112 $9.63 $1,078.56
158 Plastic Wide Lane Line, Type B LF 330 $6.43 $2,121.90
Total Amount of this Change Order: $3,248.71
SUBSTANTIAL COMPLETION
Original Date: Prior to this Change Order: Including this Change Order:
Original Working Days: 40 Working Days Added by this CO: 0 Working Days including this CO: 40
THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF CONTRACT PRICE:
ORIGINAL TOTAL CONTRACT AMOUNT $ 962566.49
TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT(Thru CO 3) $ 19024.55
TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $ 981,591.04
NET THIS CHANGE ORDER $ 3248.71
TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 984,839.75
CONTRACTOR ACCEPTANCE: C ,44 - DATE: ID/211
contractor hereby accepts this adj ent under the terms of the original contract for all work perfomed.
RECOMMENDED BY: DATE: /d Z N
P oject Manager
APPROVED BY: . ...*/�,,i.,,;���►. DATE: (O`Z l )41
Eri uth,Public Works Director
APPROVED BY: 4/7A DATE:
Mike Jackson,City Manager
ATTACHMENTS: CO 5 Gore Pavement Marking Plan
Distribution:
ORIGINALS TO: City of Spokane Valley Clerk's Office
COPIES TO: Contractor, PW Project File,Finance dept,City Manager
CJo\y-17S
7/1/2014
Wo
W
CNI CC Z C3
f, O O z
IX ; i i :'4e. 4,. / 0
1 !I ,4A:4, 4:
a > W
Q C
( CNI
III
p r r 1
C/ m CO
0 p W
/ Z h{ LJ L,J
w U Q W03 LI 1-21 _ Q
I / t
w 14
N Z
U
`I I0-
II-
O �
L� UI
I J1
F—
U)
C) J I-LIz I Z m
I1 i V) � J U o m
11 Lo
• Z z
CO h Q Q 2
i 0 o U II 1 I / -, o
/ 't cwt I,.
CLi
0
4 .._
. „..
, 11 1cn w E — O
i O N
it a) O O,
Q,
a)
>. .0 O Q O
C p
L.L '. 111 I{
U) r NW N
NQ
I✓ a > Q7
Il p a1 0.. O
N `.
2
�� I O N Q
! a7 W
re) D
I� I r0 1o
z
I 5<-- (2 ;0( _
LL, ,.....,
I Q I J
I1
CD c
i 0_Wit W Q 0-
II —
NWWHSIO a_
w
11 � JZ W V z QCSIw I L --
io
I il ( l' .t.7412` it
III I w
1 "
Il771,,,,•11,:;
O
� O C/)
I I Rd SO 00•I PLOZ/Z/OI a^1PZI7y83H O.L vLSIA-3rI0 IdS-IIw LSIO\QVJ0I V ASOOI..^' G\Ple A1314,?A-any a' °S-L8IO\s!.,U1 S\sl02I°d lel@eO\srlioM .'4 d
SjÔk '1hIhCapital Improvement Program
Valley11707 E Sprague Ave Suite 106 • Spokane Valley WA 99206
4.00.
509.921.1000♦ Fax: 509.688-0261 • cityhall@spokanevalley.org
Change Order Memorandum
Date: October 2, 2014
To: Eric Guth Through: Steve Worley
From: Craig Aldworth G-/4
Re: Change Order 5—Sprague St. Pres. Project, CIP 0187
Budget Account No. 311.000.187.595.30.63.00 Spokane Rock Products Contract 14-029
This Change Order pays for installing crosswalk panels with Type B Plastic (heat applied) at
locations where the Type C-1 Inlay pavement marking could not be installed because they fell on
the Centerline step-wedge joint or they were partially on existing pavement. These panels will
be installed with Type B Plastic.
It also pays for installing a gore line west of the UP RR underpass center bridge abutment as
Type B plastic after it was discovered that the re-installation of Jersey barriers on the west side
of the UP Railroad underpass center bridge abutments would conflict with the southern existing
Type C-1 gore line. The southern gore line was removed. After the Jersey Barrier was installed
the gore line will be reinstalled to not conflict with the barrier placement with Type B heat
applied Plastic.
The change order is estimated to increase the cost of the project$3,248.71. This project is
86.5%funded by Federal Grant STPUL -3840 (010)and the 13.5%match is funded by Spokane
Valley Street Preservation Fund 311. There are sufficient funds in the project budget to cover
these costs.
Original Contract amount= $ 962,566.49
Previous Change Order Cost(Through CO 4)= $ 19,024.55
Change Order#5 Cost= $ 3,248.71
Project Cost including Change Order#5= $ 984,839.75
15% of Original Contract amount= $144,384.97
Max Public Works Director Contract authority= $75,000.00
Change Order Cost to date= $22,273.26
Remaining P.W. Director Contract Authority after CO #5 $52,726.74
Cc: Finance Department
Clerk's Office
sCITY OF Public Works Department
ookane Capital Improvement Program
Valley 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206
509.921.1000♦ Fax: 509.921.1008 • cityhall@spokanevalley.org
Change Order Memo
Date: October 2, 2014
By: Craig Aldworth
Re: Change Order 5
Sprague Street Preservation Project, CIP 0187
1. Describe the Change This Change Order pays for removing Plastic Wide Lane
line, Type C-1 and installing Type B wide lane line defining the south side center
gore line on the downstream end of the UP RR underpass bridge abutment. It also
pays for installing Type B Plastic Crosswalk Lines at locations where rolling in the
C1 inlay tape into hot asphalt was not possible.
2. Evolution of the Change
It was discovered that the re-installation of Jersey barriers on the west side of the
UP Railroad underpass center bridge abutments would conflict with the southern
existing Type C-1 gore line. The southern gore line was removed. After the
Jersey Barrier was installed the gore line will be reinstalled to not conflict with the
barrier placement with Type B heat applied Plastic. Several C-1 inlay Crosswalk
panels could not be installed because the fell on the Centerline step-wedge joint
or they were partially on existing pavement. These panels will be installed with
Type B Plastic.
3. Payment The cost was based on the $8.60 /square foot price for Type B Plastic
Crosswalks on the Argonne and Sprague Street Preservation Project. Since the
Argonne and Sprague unit bid price was for a much larger quantity, it was used
to establish the price for the Subcontractor and 12% was added for Prime
overhead and profit to obtain the change order price. The linear foot unit price
for the 8 inch wide lane line was derived from the crosswalk square foot unit price
by multiplying by 2/3. The Plastic Lane Line, Type C-1 removal price was set at
the cost for Temp pavement marking because it could be removed by simply
pulling it off in strips.
4. Time No additional time was granted or taken away.
5. Prior Approval
The Change Order was approved 10/2/14 by Eric Guth, Public Works Director.
6. Attachments
CO 5 Gore Striping Plan