2012, 10-22 Permit: SW-12002409 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002409
Permit Issued Date:
10/22/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: INCH BY INCH
Project Name: EDGERTON Applicant: INCH BY INCH
Permit Type: SEWER Address: 23122 N DAY MT SPOKANE RD
CHATTAROY, WA 99003
Phone: 509-238-4073
Email:
SITE INFORMATION:
Site Address: 2607 N BRADLEY RD
Parcel Number: 35121.6701
Subdivision: ORCHARD AVENUE
Assessor's Description: ORCHARD AVE ADD TR "A" OF SP89-573 BEING
A PTN OF BLK190; AUDITOR #8909050024
Inspection Area:
Owner:
Address:
Phone:
Email:
SOUTHARD JR, BRADLEY D
2607 N BRADLEY RD
SPOKANE, WA 99212
Water District: Orchard Fire District: Spokane Valley Fire
Avenue Irrigation District
#6
Zoning: Land Area: 10426 Square Feet
CONTRACTOR INFORMATION:
General Contractor
INCHIIE940CM
INCH BY INCH
23122 N DAY MT SPOKANE RD
CHATTAROY, WA 99003
509-238-4073
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 10/22/2012 11:16:46
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002409 10/22/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 10/22/2012 11:16:46
Printed by: IIS APPPOOL\ASP.NET v4.0