Loading...
1988, 07-26 Permit: 88002074 Energy Code` PROJECT NUMBER= 88OO2O7aD /01"4:*************************** ENERGY SITE STREET= i4912 E BROAD AVE ADDRESS= SPOKANE WA 99216 PERMIT U%E= RE%IDENCE INFORMATION NEW= X REMODEL= ADDITION= ENERGY CODE= NWEC SGC APPROACH= COMPONENT COMPLEXITY= DESCRIPTION BASEMENT U DECK GARAGE RESIDENCE E= O7/26/88 I%SUED PERMIT PAGE= 03 **************************** PARCEL4= 35644-3i09 CHANGE OF U%E= UTILITY= WWP GROUP TYPE SQ FT ----- ---- ----- R-3 VN 1104 R-3 VN 100 M—i VN 452 R-3 VN 1212 RE%/COM= R ************************* ENERGY CODE PLAN REVIEW ************************** CEILING, FLAT: CEILING, VAULTED: WALL: WALL, BELOW GRADE: / FLOOR OVER UNC. SPACE: ^‘11w." SLAB FLOOR PERIMETER: R-49 R-42 R -19A R—ii R -3O N/A COMMENTS: NHRV:INTEGRATED SPOT & WHOLE HOUSE DOORS MAX. U—VALUE: 0.87 GLAZING MAX U—VALUE: 0.49 GLAZING MAX AREA: 12.4% AIR LEAKAGE %Y%TEM: ETD SPACE HEATING SYSTEM: BASEBOARD **************************************************************************** I HAVE BEEN ADVI%ED OF THE FINANCIAL INCENTIVE% AVAILIBLE FOR THE STRUCTURE DESCRIBED ON THIS PERMIT, AND THAT THE ENERGY CONSTRUCTION MEASURES FOR WHICH THE INCENTIVES WILL BE PAID ARE A REQUIREMENT OF THIS PERMIT, AND THAT THE STRUCTURE MUST RECEIVE FINAL APPROVAL BY MARCH 3i, 1989 TO RECEIVE THE INCENTIVE PAYMENT, I ALSO UNDERSTAND THAT NEITHER THE BONNEVILLE POWER AD— MINISTRATION NOR SPOKANE COUNTY MAKE ANY WARRANTIES AS TO ACTUAL ELECTRICAL SAVINGS TO BE REALIZED, OR ANY OTHER EXPRESSED OR IMPLIED WARRANTY CON— CERNING THE MATERIALS EMPLOYED IN THE CONSTRUCTION OF THE STRUCTURE, I HAVE BEEN ADVISED OF AND INTEND TO COMPLY WITH THE NORTHWEST ENERGY CODE REQUIREMENTS PERTAINING TO FORMALDEHYDE EMISSIONS STANDARDS FOR STRUCTURAL COMPONENTS, AND HAVE RECEIVED A- COPY OF EXHIBIT 9(A) WHICH DESCRIBES THESE REQUIREMENTS, AP`LICANT ------------ 7 /` ������ ������� ' ^''—''~~---~ ~''''`~ / / DATE AUTHORIZED OFFICER �\ ******************************** THANK YOU ********************************* lw�p' ID * * Oat, � Conditions to check: Conditions resolved: ---- --------------------------- Temporary C/O requested (y/n) Certificate of Occupancy issued: Received application: ---- oArE,Y`^ ,"~��. ^�m�. Ninety days after C/O issuance: Owner/contractor called regarding the return of plans: Plans returned: Date: A 4.`~ Received by: (: � ' e 1 L D I G � 'on �� I' ,� P L V U M 8 I N G M E C H A N I C A L T H 133 /*� C [ R ' * * * * * * * * * * THIS SPACE FOR COMMERCIAL PLANS TRACKING / CERTIFICATES OF OCCUPANCY ONLY* * * * * * * * * * Date received for C/O processing: Pians pulled for final processing': Conditions to check: Conditions resolved: Temporary C/O requested (y/n) Certificate of Occupancy issued: Received application: By: Approval granted: By: Ninety days after C/O issuance: Owner/contractor called regarding the return of plans: Plans returned: Date: A 4.`~ Received by: No response from owner/contractor - plans destroyed: Notes: REQUEST FOR INCENTIVE PAYMENT The file has been reviewed for project number & ) - 2074 . The building is a sI0.6CA LILY residential building located at oAP p 11_ The necessary information is in the file and the permit holder has qualified to receive a builder incentive payment. The total area of conditioned floor area is 2310 The payment amount calculation is: 2-31(0 SF @ 4. 0 qS = 22.-011) . FLOs loo . o0 2300 '2a The permit holder is ` 1WPF l2 12 SPP.AGO A C . SP()KPS . [PA_ _ Gci21k ***************************************************************** Request by JUiQ (1")Pc (, RV) , staff, Spokane County Building and Safety. Please pay $ Z 300. Check No. 11'?4 To: TUPPE(2 1 (JL Date: 10 sg-'1 " �v �'. N(i f 23RvA D Av g County of Spokane Energy Northwest Energy Code Inspections BUILDER CHECKLIST 456-3675 SLAB INSPECTION - PRIOR TO PLACING SLAB GRAVEL BASE: A 4 inch thick coarse -grade gravel base shall be in place. PERIMETER INSULATION: All slab perimeters within 24 inches of the final exterior grade shall be insulated to at least R-10. Insulation shall be 24 inches in length overall and installed in an approved manner. INSULATION AND SEALING INSPECTION APPROVED PLANS are available on the job site. WINDOWS AND DOORS: All windows and doors shall be as specified on the approved plans. The rough opening around jambs, sills and headers shall be sealed to prevent air infiltration. These areas may be either caulked or foamed, but must be seated airtight. SOLEPLATE CAULKED: Soleplates of walls shall be caulked or glued to the floor. PLUMBING AND ELECTRICAL PENETRATIONS: All holes in the buiding envelope shall be sealed to prevent air infiltration. Where electrical wiring passes horizontally through a wall stud, no sealing is required unless that stud penetrates the building "envelope." Electric boxes throughout the building shall either have the holes and edges sealed or be provided with plate gaskets. Rim joists, mudsills and plumbing stacks shall be sealed. WALL INSULATION: All wall cavities shall be filled completely to the required insulation value. Batts shall not be compressed. Batts must be cut to fit around wires, pipes and outlet boxes. Kraft or foil vapor retarders must be face -stapled. FLOOR INSULATION: Floor insulation shall be installed to the required R -value, and shalt be supported in an approved manner with twine, wire, "Tyvek," netting, etc. Avoid compressing the insulation. CEILING INSULATION: If eave vents are used, approved baffles shall be in place to permit adequate ventilation through eave vents. Blown insulation may not be used if the ceiling slopes more than 2-1/2 in 12. DUCTS: Ducts shall be sealed at joints and corners with duct tape or sealant. Junctions between outlet registers and interior surfaces shall be caulked. Ducts outside of the conditioned space, except exhaust air ducts, shall be insulated to R-11. Exhaust air ducts shall extend to the exterior of the building. VAPOR RETARDERS: A vapor retarder is required on the warm side of insulation in walls, floors, and ceilings. Approved materials include: 6 mil. polyethylene, Kraft or foil paper face -stapled, exterior grade plywood and certain flooring materials. FINAL INSPECTION (ENERGY) APPROVED PLANS are available on the job site. MECHANICAL SYSTEMS: All mechanical systems will be checked for correct operation and labeling of controls. Heaters shall be sized as shown on the approved plans. Exhaust fans shall be properly located and shall be properly rated for size and noise. Exhaust ducts shall be provided with a tight -fitting backdraft damper. The whole house exhaust fan shall be controlled to operate automatically as well as manually. Make-up air intakes shall be properly located and sized. WEATHERSTRIPPING: _ Weatherstripping shall be aligned for proper seal on exterior doors, including doors into unheated spaces. Door threshold or sweep shall be properly adjusted. Attic hatches and interior crawlspace access hatches shall be weatherstripped and insulated. Windows shall be weatherstripped and locking mechanism checked for proper function. _ Electrical switch and outlet plates throughout the building shall be fitted with gaskets, unless the boxes were sealed prior to the insulation inspection. ATTICS: Insulation shall be of thickness specified by the manufacturer to comply with required R -values. PLUMBING: Hot water heaters shall meet the ASHRAE 90A-80 specifications. Showers shall be equipped with flow restrictors allowing a maximum flow of 2.75 gallons per minute per shower head. FIREPLACES / W000 STOVES: Fireplaces and wood stoves shall be equipped with "tight -fitting" metal or glass doors. A combustion air intake shall be ducted directly into the firebox. The intake duct shall be at least six square inches in area and shall be equipped with a readily accessible, operable tight -fitting damper. CRAWL SPACES: A ground cover of 6 mil. black polyethylene or equal shall be installed on all crawl space floors. Joints shall be lapped at least 12 inches. NORTHWEST ENERGY CODE Organization of File for Project No. 03 - 2074 Site Address 14g1 z. 0,6AD fifxe DESCRIPTION DATE FILED - INITIAL VERIFIED AT/ CLOSE OUT - INIT COMMENT SHEET ONE SET OF APPROVED PLANS 7 26 e8 d. 10. ONE COPY OF THE BUILDING PERMIT THE PLAN REVIEW CHECKLIST PLAN REVIEW NOTES 7. 24, .138 WATT -SUN SUMMARY REPORT ORIGINALS OF CORRECTION NOTICE 10.21.C6v ONE COPY OF THE INSPECTION REPORTS THE INSPECTION CHECKLIST ORIGINAL OF THE SIGNED PERMIT HOLDER'S CERTIFICATION 10.21. 5e, VERIFICATION OF RADON MONITORING OFFER ORIGINAL OF THE REQUEST FOR INCENTIVE PAYMENT PERMIT HOLDER'S CERTIFICATION The undersigned verifies that they were made aware of and advised of the Northwest Energy Code requirements at the time of issuance of permit number ‘6 -2,074 for the residential building located at EE 11912- MOAp Further, the undersigned certifies that the building stated above meets the requirements of the Northwest Energy Code pertaining to formaldehyde emissions of structural panels. Further, the undersigned certifies that no incentive payment has been or will be received from any Super _IOD CENTS Program for this building. A0001 4 Permit Holder Witne /e if Signature Date /v o2i. ag Au orized Officer Date D:partment of Building & Safety REQUEST FOR INCENTIVE PAYMENT The file has been reviewed for project number O B _ 2071- . The building is a .A06 -Ma Fi°01I L'Y residential building located at 1 ` 9 t Z oA-p p<J f - The necessary information is in the file and the permit holder has qualified to receive a builder incentive payment. The total area of conditioned floor area is Z3)(., . The payment amount calculation is: 231(.0 s @ O = 2z00."7-0 1Oo. o0 2300 2,5 ..5r The permit holder is `-Uf1'�(Z (NC-• I2gsPP.AG0. SeDKA. w4, ***************************************************************** Request by JUiQ mFcc:.RV) , staff, Spokane County Building and Safety. Please pay $ CXD - To: TO PPF ---(2. 1 NI (- Check No. � 1 g4p Date: 16 �4 "?S 07/7"1/8R • • WATTSUN version 4.2 - SUMMARY REPORT Pag_ . 1 FILE . ANEW 'r= 1LE.',-ISE HOUSE ID� E T I ICATIC' _ . --'--__..-______� �rnf r Utility WWF House IB: FH ENI:=. Address . E. //9/ a ,6`_...411 Analyst : CURT E_i 1 .Icr THP -ER Location i on :SF0K-N`7 Owner Floor Area: 2316 ft2 r_nr?s, CRITERIA NORTHWEST ENERGY COBE REFERENCE CURRENT PROPOSED Thermal Performance (Btu!hr-F) 4.8 558 4.97 6.51= Enercy Budget _ _.'Wn /f t2 -_yr ) WASHINGTON STATE ENERGY CODE -Chapter 4 (U0 42'5 * QUALIFIES * ALLOWED PROPOSED oob HEi=;-lNG AND VENTILATING SYSTEMS .J7 9 QUALIFIES -4 CURRENT PROPOSED Heating System Ty oe _ H,=at Pump. H.�.3ti e:3son PerformanceFactor T� i � 1 od c`J - __'. n t��,ilj,: d'..�`"v:`"RnLe (BTU /hr ) System Size. :at _.. Design _.gad, kW (kBTU:'hr) ) Ay,,=rne Annal al .=al- f _ ,_t:..-ement ( k:tJh/y'r. Baseboe --d Ni{7 7:7257.4 1_ .5 (56.0 1 419 Be.._eb:__ rd NSA 1 P`5 Ventilation S'vste-, Type NHRV: n;_Egg.r3ted Spot : Whole off_; ECC' OM I CS Incremental Cans_. cion Cost Projected Yearly -eating Cost First Year Monthly PITI ($/month) Av r-ag Momthiy Heating Costs TOTAL FIRST YEAR MONTHLY PAYMENT CURRENT 12.-240 0.00-.. 0.00 0,'10 S l}.')t) 0.00 0.00 0 year Life Cycle Cost $ 0.00 $ 0,00 Actual energy use vary with =1 i ma te, lifestyle. and construction. Economic and anerg`, use estimates should d be used for comparative purposes only. - F9EeM='�C A:NEW_EILF.HEE BUILDING COMPONENT SUMMARY Component Entries Area Curr Prop UA UA Cost $/UA Below -grade walls 1 151 128.4 93.6 Slab perimeters 0 0 0.0 0.0 Floors over Er -mw! pa, -es 1 1 R 4.3 3.1 Walls 1 2026 129.7 115.5 Windows 2 288 134.2 133.6. Doors 1 54 3.8 3.8 Skylights 1 8 4.8 4.8 Ceilings 2 1235 2..2 34.2 Air Leakage Control 1 17471 i:e.S 101.5 Mass 1 2316 6@«s.? 6948.0 TOTALS -_7ZING ORIENTATION TT CURRENT Area Elfarea 'FloorArea Orientation 93.5 0.0 46.5 0.0 117.5 0.0 30.5 0.0 5£4.5 490.1 PROPOSED Area Elfarea %FloorAre2 93.5 4.0 South 93.5 93.5 4.0 0.0 0.0 Southeast 0.0 0.0 0.0 25.6 2.0 East 46.5 25.6 2.0 0.0 0.0 Northeast 0.0 0.0 0.0 35.6 5.1 North 117.5 35.6 5.1 0.0 0.0 Northwest 0.0 0.0 0.0 16.2 1.3 West 30.5 16.2 1.3 0.0 0.0 Soothwesr 0.0 0.0 0.0 288.0 170.9 12.4 TOTALS 22g.n 170.9 12.4 ,21/38 WAfTS,ufrsign 4.2 - COMPONENTS FILE : A:NEW_FILE.HSE LOW-GRADE WALLS 1RT (cont.) Description C> 4' avg depth/WSEC unfinished R-0 .> 4' depth/2x4 16" o�c./interior R -i1 FLOORS OVER CRAWL SPACES Description F -valve Pmtr UA $/1f Cos% * 0.850 151.0 120.4 0.620 151.0 93.6 U -value Area C> R-19 under floor - vented crawl R> R-30 ander floor - vented crawl WALLS O.040 108.0 0.029 108.0 Description C> 2x6 R-19 batt/stanard R> 2x6 R-19 batt/advanced WINDOWS Description UA $/s¥ Cost 4.3 3.1 U -value Area UA $/s- Cost 0.064 2026.0 129.7 0.057 2026.0 115.5 U -value Area UA $/sf Cost c> 2 -glaze, 1/2", TIM frame *FIXED 2P TOTALS> P>*2-glaze, 1/2", VINYL *FIXED 2R TOTALS> 0.560 0.490 187.0 101.0 0.450 0.490 104.7 49.5 288.0 154.2 187.0 101.0 24.2 49.3 288. 133.6 wa140uf rslon 4.2 - Lumtuwt.NtS R kcont.) Page : FILE : A:NEW_FILE.HSE CS Description C>*METALJFOAM w/tb P>*METAL/FOAM w/tb U -value Area UA $Zsf Cost 0.070 0.070 SKYLIGHTS Description 54.0 54.0 3.8 3.8 O -value Are« OA $Zsf Cu.E C> 2 -glaze, 1/2", TIM, low -E P> 2 -glaze, 1/2", TIM, low -E CEILINGS 0.600 0.600 Description C> R-38 standard R-38 vaulted Tr; TA} R> R-49 standard *R-42 vaulted 8.0 0.0 4.8 4.9 U -value Area UA $Zsf Cost 0.032 824.0 * 0.028 411.0 26.& 11.5 1235.0 72.9 0.027 824.0 * 0.028 411.0 11.5 TOTALS 1235.0 7.2 AIR LEAKAGE CONTROL Description ACH Volume UA $ Cost C) Standard Air Sealing -above grade volume 0.330 17471.0 101.5 p> Standard Air Sealing -above grade volume 0.350 17471.0 101.5 1/88 WATTSUN )J rsion 4.2- L,,eirue.EN 6 .T icu,, �. , FILE . A: NEW_FILE. HSE Description i -value Area BTU/F $/sf Cost C> Light frame construction BTU/F-ft2 fir 7.000 2316.0 6948.0 F'> Light frame construction BTU/F-ft2 fir• 7.000 7'716.0 6948.0 Actual energy use will vary with climate, lifestyle, and construction. =eonomic and energy use estimates should be used for comparative purposes only. SYSTEM version `b' i FILE . A:NEW FILE.HSE Heating system type Ducts REPORT Page : CURRENT PROPOSED Baseboards Baseboards Size Lgth Rval Sipe Lgth Rval BUILDING HEAT LOSS Envelope Ducts TOTALS: CURRENT PROPOSED 564.5 BTU/hr-F 490.1 BTU/hr-F 0.0 0.0 564.5 490.1 DESIGN RESULTS CURRENT PROPOSED 'DPsi gn heat load 77257.4 LTU/hr 3:''48.5 BTU/hr 10.9 kW 9.5 kW System size (150::' 5 , i? kB T U/hr 48.5 k:ETU/hr 16.5 kW 14.0 kW Total Spee Heat 17419 kWh/yr 13895 kWh/yr BASED ON THE FOLLOW:NG DESIGN CONDITIONS WinF-er desidn wind sp=ed Thu-rmosat met point Winter design t:T; eratLr-e Design temperature_ difference 15 mph 70 deo F. 4 deg F. 66 deg F. Actual energy use will vary with climate, lifestyle, and construction. )gnomic and energy use estimates should be used for comparative purposes only. r , • 5 -ropimiqt► _ 149 i 2. gQo ,l,V.- AC T I ON : S SCREEN: ENER USERID : -MSTI BUILDING PERMIT SYSTEM ENERGY DATA COLLECTION SCREEN JURISDICTION= PROJECT NUMBER= 8-2°74 PERMIT , i r:l=W: REMODEL `NERDY i_�i�;E _? WEEC: ADDITTIii`�: CH�;�l�=E 0f- ��c.`: RES/CCDM APPROACH : RSC>IPTI` NWEC. I UTILITY . i�tic�)P SGC _ Y i_;T...': _ 't' PfINT : rOMF i;1i_;1:. Y' EY T c: i_r, _ .xGl: 0.07 .12.1 R-30 NI4RV INT'E62Ai p sPot-- viI-IOL I1-00S:- SITE ADDRESS: f4112_ reopo � OWNER NAME: f(C PHONE NO: OWNER ADDRESS: CONTRACTOR: CONTRACTOR ADDRESS: CONSTRUCTION TYPE: OCCUPANCY GROUP: TNSPFiTC ENERGY CODE PLAN REVIEW • PERMIT NO: OS - 2674 PERMIT APPLICATION DATE: 7,24 8E6 ISSUANCE DATE: '7, --2-40.0S N WE C COMPLIANCE APPROACH: DATE APPROVED: ValueTotal Time (Minutes FOUNDATION Heated Slab Unheated Slab Basement Crawlspace FRAMING Ceiling Doors Floor Windows Walls Vapor Barriers AIR-TO-AIR HEAT EXCHANGER FIREPLACE HOT WATER HEATER INFILTRATION CONTROL SPACE HEATING SYSTEM VENTILATION LIGHTING ACH General Notes: -O Re -Revs Minutes COMPONENT PERFORMANCE SYSTEMS ANALYSIS PRESCRIPTIVE REQUIREMENTS POINTS PATH: Descriptions@ / Comments 'Place.R, U, 7., as required. For Example, " R = 32 ". @Desc'ri} planned applications to achieve performance value 'e.g. wi.ndows=dbl, 1/2 in., TIM w/storm.), or attar: WATT -S. run.