1988, 07-26 Permit: 88002074 Energy Code`
PROJECT NUMBER= 88OO2O7aD
/01"4:***************************
ENERGY
SITE STREET= i4912 E BROAD AVE
ADDRESS= SPOKANE WA 99216
PERMIT U%E= RE%IDENCE
INFORMATION
NEW= X REMODEL= ADDITION=
ENERGY CODE= NWEC SGC
APPROACH= COMPONENT
COMPLEXITY=
DESCRIPTION
BASEMENT U
DECK
GARAGE
RESIDENCE
E= O7/26/88
I%SUED PERMIT
PAGE= 03
****************************
PARCEL4= 35644-3i09
CHANGE OF U%E=
UTILITY= WWP
GROUP TYPE SQ FT
----- ---- -----
R-3 VN 1104
R-3 VN 100
M—i VN 452
R-3 VN 1212
RE%/COM= R
************************* ENERGY CODE PLAN REVIEW **************************
CEILING, FLAT:
CEILING, VAULTED:
WALL:
WALL, BELOW GRADE:
/ FLOOR OVER UNC. SPACE:
^‘11w."
SLAB FLOOR PERIMETER:
R-49
R-42
R -19A
R—ii
R -3O
N/A
COMMENTS:
NHRV:INTEGRATED SPOT & WHOLE HOUSE
DOORS MAX. U—VALUE: 0.87
GLAZING MAX U—VALUE: 0.49
GLAZING MAX AREA: 12.4%
AIR LEAKAGE %Y%TEM: ETD
SPACE HEATING SYSTEM: BASEBOARD
****************************************************************************
I HAVE BEEN ADVI%ED OF THE FINANCIAL INCENTIVE% AVAILIBLE FOR THE STRUCTURE
DESCRIBED ON THIS PERMIT, AND THAT THE ENERGY CONSTRUCTION MEASURES FOR
WHICH THE INCENTIVES WILL BE PAID ARE A REQUIREMENT OF THIS PERMIT, AND THAT
THE STRUCTURE MUST RECEIVE FINAL APPROVAL BY MARCH 3i, 1989 TO RECEIVE THE
INCENTIVE PAYMENT, I ALSO UNDERSTAND THAT NEITHER THE BONNEVILLE POWER AD—
MINISTRATION NOR SPOKANE COUNTY MAKE ANY WARRANTIES AS TO ACTUAL ELECTRICAL
SAVINGS TO BE REALIZED, OR ANY OTHER EXPRESSED OR IMPLIED WARRANTY CON—
CERNING THE MATERIALS EMPLOYED IN THE CONSTRUCTION OF THE STRUCTURE,
I HAVE BEEN ADVISED OF AND INTEND TO COMPLY WITH THE NORTHWEST ENERGY CODE
REQUIREMENTS PERTAINING TO FORMALDEHYDE EMISSIONS STANDARDS FOR STRUCTURAL
COMPONENTS, AND HAVE RECEIVED A- COPY OF EXHIBIT 9(A) WHICH DESCRIBES THESE
REQUIREMENTS,
AP`LICANT
------------
7
/`
������ �������
' ^''—''~~---~ ~''''`~
/
/
DATE
AUTHORIZED OFFICER
�\
******************************** THANK YOU *********************************
lw�p' ID
* *
Oat,
�
Conditions to check: Conditions resolved:
----
---------------------------
Temporary C/O requested (y/n)
Certificate of Occupancy issued:
Received application:
----
oArE,Y`^
,"~��. ^�m�.
Ninety days after C/O issuance:
Owner/contractor called regarding the return of plans:
Plans returned:
Date:
A
4.`~
Received by:
(:
�
'
e
1
L
D
I
G
�
'on
��
I'
,�
P
L
V
U
M
8
I
N
G
M
E
C
H
A
N
I
C
A
L
T
H
133
/*�
C
[
R
'
* * * * * * * * * * THIS SPACE FOR COMMERCIAL PLANS TRACKING / CERTIFICATES OF OCCUPANCY ONLY* * * * * * * *
* *
Date received for C/O processing: Pians pulled for final processing':
Conditions to check: Conditions resolved:
Temporary C/O requested (y/n)
Certificate of Occupancy issued:
Received application:
By:
Approval granted:
By:
Ninety days after C/O issuance:
Owner/contractor called regarding the return of plans:
Plans returned:
Date:
A
4.`~
Received by:
No response from owner/contractor - plans destroyed:
Notes:
REQUEST FOR INCENTIVE PAYMENT
The file has been reviewed for project number & ) - 2074 . The
building is a sI0.6CA LILY residential building located at
oAP p 11_
The necessary information is in the file and the permit holder
has qualified to receive a builder incentive payment.
The total area of conditioned floor area is 2310 The
payment amount calculation is:
2-31(0 SF @ 4. 0 qS = 22.-011) .
FLOs loo . o0
2300 '2a
The permit holder is ` 1WPF l2
12 SPP.AGO A C . SP()KPS . [PA_ _ Gci21k
*****************************************************************
Request by JUiQ (1")Pc (, RV) , staff, Spokane County
Building and Safety.
Please pay $ Z 300.
Check No. 11'?4
To: TUPPE(2 1 (JL
Date: 10 sg-'1 " �v
�'. N(i f 23RvA D Av g
County of Spokane Energy
Northwest Energy Code Inspections
BUILDER CHECKLIST 456-3675
SLAB INSPECTION - PRIOR TO PLACING SLAB
GRAVEL BASE: A 4 inch thick coarse -grade gravel base shall be in place.
PERIMETER INSULATION: All slab perimeters within 24 inches of the final exterior grade shall be insulated to at least
R-10. Insulation shall be 24 inches in length overall and installed in an approved manner.
INSULATION AND SEALING INSPECTION
APPROVED PLANS are available on the job site.
WINDOWS AND DOORS: All windows and doors shall be as specified on the approved plans. The rough opening around jambs,
sills and headers shall be sealed to prevent air infiltration. These areas may be either caulked or foamed, but must be
seated airtight.
SOLEPLATE CAULKED: Soleplates of walls shall be caulked or glued to the floor.
PLUMBING AND ELECTRICAL PENETRATIONS: All holes in the buiding envelope shall be sealed to prevent air infiltration.
Where electrical wiring passes horizontally through a wall stud, no sealing is required unless that stud penetrates the
building "envelope." Electric boxes throughout the building shall either have the holes and edges sealed or be provided
with plate gaskets. Rim joists, mudsills and plumbing stacks shall be sealed.
WALL INSULATION: All wall cavities shall be filled completely to the required insulation value. Batts shall not be
compressed. Batts must be cut to fit around wires, pipes and outlet boxes. Kraft or foil vapor retarders must be
face -stapled.
FLOOR INSULATION: Floor insulation shall be installed to the required R -value, and shalt be supported in an approved
manner with twine, wire, "Tyvek," netting, etc. Avoid compressing the insulation.
CEILING INSULATION: If eave vents are used, approved baffles shall be in place to permit adequate ventilation through
eave vents. Blown insulation may not be used if the ceiling slopes more than 2-1/2 in 12.
DUCTS: Ducts shall be sealed at joints and corners with duct tape or sealant. Junctions between outlet registers and
interior surfaces shall be caulked. Ducts outside of the conditioned space, except exhaust air ducts, shall be insulated
to R-11. Exhaust air ducts shall extend to the exterior of the building.
VAPOR RETARDERS: A vapor retarder is required on the warm side of insulation in walls, floors, and ceilings. Approved
materials include: 6 mil. polyethylene, Kraft or foil paper face -stapled, exterior grade plywood and certain flooring
materials.
FINAL INSPECTION (ENERGY)
APPROVED PLANS are available on the job site.
MECHANICAL SYSTEMS: All mechanical systems will be checked for correct operation and labeling of controls.
Heaters shall be sized as shown on the approved plans.
Exhaust fans shall be properly located and shall be properly rated for size and noise.
Exhaust ducts shall be provided with a tight -fitting backdraft damper.
The whole house exhaust fan shall be controlled to operate automatically as well as manually.
Make-up air intakes shall be properly located and sized.
WEATHERSTRIPPING:
_ Weatherstripping shall be aligned for proper seal on exterior doors, including doors into unheated spaces. Door
threshold or sweep shall be properly adjusted.
Attic hatches and interior crawlspace access hatches shall be weatherstripped and insulated.
Windows shall be weatherstripped and locking mechanism checked for proper function.
_ Electrical switch and outlet plates throughout the building shall be fitted with gaskets, unless the boxes were sealed
prior to the insulation inspection.
ATTICS:
Insulation shall be of thickness specified by the manufacturer to comply with required R -values.
PLUMBING:
Hot water heaters shall meet the ASHRAE 90A-80 specifications.
Showers shall be equipped with flow restrictors allowing a maximum flow of 2.75 gallons per minute per shower head.
FIREPLACES / W000 STOVES:
Fireplaces and wood stoves shall be equipped with "tight -fitting" metal or glass doors.
A combustion air intake shall be ducted directly into the firebox. The intake duct shall be at least six square inches
in area and shall be equipped with a readily accessible, operable tight -fitting damper.
CRAWL SPACES:
A ground cover of 6 mil. black polyethylene or equal shall be installed on all crawl space floors. Joints shall be
lapped at least 12 inches.
NORTHWEST ENERGY CODE
Organization of File for Project No. 03 - 2074
Site Address
14g1 z. 0,6AD fifxe
DESCRIPTION
DATE FILED
- INITIAL
VERIFIED AT/
CLOSE OUT - INIT
COMMENT SHEET
ONE SET OF APPROVED
PLANS
7 26 e8 d.
10.
ONE COPY OF THE
BUILDING PERMIT
THE PLAN REVIEW
CHECKLIST
PLAN REVIEW NOTES
7. 24, .138
WATT -SUN SUMMARY
REPORT
ORIGINALS OF
CORRECTION NOTICE
10.21.C6v
ONE COPY OF THE
INSPECTION REPORTS
THE INSPECTION
CHECKLIST
ORIGINAL OF THE
SIGNED PERMIT HOLDER'S
CERTIFICATION
10.21. 5e,
VERIFICATION OF RADON
MONITORING OFFER
ORIGINAL OF THE
REQUEST FOR
INCENTIVE PAYMENT
PERMIT HOLDER'S CERTIFICATION
The undersigned verifies that they were made aware of and advised
of the Northwest Energy Code requirements at the time of issuance
of permit number ‘6 -2,074 for the residential building
located at EE 11912- MOAp
Further, the undersigned certifies that the building stated above
meets the requirements of the Northwest Energy Code pertaining to
formaldehyde emissions of structural panels.
Further, the undersigned certifies that no incentive payment has
been or will be received from any Super _IOD CENTS Program for
this building.
A0001
4
Permit Holder
Witne
/e if
Signature Date
/v o2i. ag
Au orized Officer Date
D:partment of Building & Safety
REQUEST FOR INCENTIVE PAYMENT
The file has been reviewed for project number O B _ 2071- . The
building is a .A06 -Ma Fi°01I L'Y residential building located at
1 ` 9 t Z oA-p p<J f -
The necessary information is in the file and the permit holder
has qualified to receive a builder incentive payment.
The total area of conditioned floor area is Z3)(., . The
payment amount calculation is:
231(.0 s @ O =
2z00."7-0
1Oo. o0
2300 2,5
..5r
The permit holder is `-Uf1'�(Z (NC-•
I2gsPP.AG0. SeDKA. w4,
*****************************************************************
Request by JUiQ mFcc:.RV) , staff, Spokane County
Building and Safety.
Please pay $ CXD - To: TO PPF ---(2. 1 NI (-
Check No. � 1 g4p
Date: 16 �4 "?S
07/7"1/8R
• •
WATTSUN version 4.2 - SUMMARY REPORT Pag_ . 1
FILE . ANEW 'r= 1LE.',-ISE
HOUSE ID� E T I ICATIC'
_ .
--'--__..-______� �rnf r Utility WWF
House IB: FH ENI:=.
Address . E. //9/ a ,6`_...411 Analyst : CURT
E_i 1 .Icr THP -ER Location i on :SF0K-N`7
Owner Floor Area: 2316 ft2
r_nr?s,
CRITERIA
NORTHWEST ENERGY COBE REFERENCE CURRENT PROPOSED
Thermal Performance (Btu!hr-F) 4.8 558
4.97 6.51=
Enercy Budget _ _.'Wn /f t2 -_yr )
WASHINGTON STATE ENERGY CODE
-Chapter 4 (U0
42'5
* QUALIFIES *
ALLOWED PROPOSED
oob
HEi=;-lNG AND VENTILATING SYSTEMS
.J7 9
QUALIFIES -4
CURRENT PROPOSED
Heating System Ty oe _
H,=at Pump. H.�.3ti e:3son PerformanceFactor
T� i �
1 od c`J - __'. n t��,ilj,: d'..�`"v:`"RnLe (BTU /hr )
System Size. :at _.. Design _.gad, kW (kBTU:'hr) )
Ay,,=rne Annal al .=al- f _ ,_t:..-ement ( k:tJh/y'r.
Baseboe --d
Ni{7
7:7257.4
1_ .5 (56.0
1 419
Be.._eb:__ rd
NSA
1 P`5
Ventilation S'vste-, Type NHRV: n;_Egg.r3ted Spot : Whole off_;
ECC' OM I CS
Incremental Cans_. cion Cost
Projected Yearly -eating Cost
First Year Monthly PITI ($/month)
Av r-ag Momthiy Heating Costs
TOTAL FIRST YEAR MONTHLY PAYMENT
CURRENT
12.-240
0.00-.. 0.00
0,'10 S l}.')t)
0.00 0.00
0 year Life Cycle Cost $ 0.00 $ 0,00
Actual energy use vary with =1 i ma te, lifestyle. and construction.
Economic and anerg`, use estimates should d be used for comparative purposes only.
- F9EeM='�C
A:NEW_EILF.HEE
BUILDING COMPONENT SUMMARY
Component Entries Area
Curr Prop
UA UA
Cost $/UA
Below -grade walls 1 151 128.4 93.6
Slab perimeters 0 0 0.0 0.0
Floors over Er -mw! pa, -es 1 1 R 4.3 3.1
Walls 1 2026 129.7 115.5
Windows 2 288 134.2 133.6.
Doors 1 54 3.8 3.8
Skylights 1 8 4.8 4.8
Ceilings 2 1235 2..2 34.2
Air Leakage Control 1 17471 i:e.S 101.5
Mass 1 2316 6@«s.? 6948.0
TOTALS
-_7ZING ORIENTATION
TT
CURRENT
Area Elfarea 'FloorArea Orientation
93.5
0.0
46.5
0.0
117.5
0.0
30.5
0.0
5£4.5 490.1
PROPOSED
Area Elfarea %FloorAre2
93.5 4.0 South 93.5 93.5 4.0
0.0 0.0 Southeast 0.0 0.0 0.0
25.6 2.0 East 46.5 25.6 2.0
0.0 0.0 Northeast 0.0 0.0 0.0
35.6 5.1 North 117.5 35.6 5.1
0.0 0.0 Northwest 0.0 0.0 0.0
16.2 1.3 West 30.5 16.2 1.3
0.0 0.0 Soothwesr 0.0 0.0 0.0
288.0 170.9
12.4 TOTALS
22g.n
170.9 12.4
,21/38
WAfTS,ufrsign 4.2 - COMPONENTS
FILE : A:NEW_FILE.HSE
LOW-GRADE WALLS
1RT (cont.)
Description
C> 4' avg depth/WSEC unfinished R-0
.> 4' depth/2x4 16" o�c./interior R -i1
FLOORS OVER CRAWL SPACES
Description
F -valve Pmtr UA $/1f Cos%
* 0.850 151.0 120.4
0.620 151.0 93.6
U -value Area
C> R-19 under floor - vented crawl
R> R-30 ander floor - vented crawl
WALLS
O.040 108.0
0.029 108.0
Description
C> 2x6 R-19 batt/stanard
R> 2x6 R-19 batt/advanced
WINDOWS
Description
UA $/s¥ Cost
4.3
3.1
U -value Area
UA $/s- Cost
0.064 2026.0 129.7
0.057 2026.0 115.5
U -value Area
UA $/sf Cost
c> 2 -glaze, 1/2", TIM frame
*FIXED 2P
TOTALS>
P>*2-glaze, 1/2", VINYL
*FIXED 2R
TOTALS>
0.560
0.490
187.0
101.0
0.450
0.490
104.7
49.5
288.0 154.2
187.0
101.0
24.2
49.3
288.
133.6
wa140uf rslon 4.2 - Lumtuwt.NtS R kcont.) Page :
FILE : A:NEW_FILE.HSE
CS
Description
C>*METALJFOAM w/tb
P>*METAL/FOAM w/tb
U -value Area UA $Zsf Cost
0.070
0.070
SKYLIGHTS
Description
54.0
54.0
3.8
3.8
O -value
Are«
OA $Zsf Cu.E
C> 2 -glaze, 1/2", TIM, low -E
P> 2 -glaze, 1/2", TIM, low -E
CEILINGS
0.600
0.600
Description
C> R-38 standard
R-38 vaulted
Tr; TA}
R> R-49 standard
*R-42 vaulted
8.0
0.0
4.8
4.9
U -value Area UA $Zsf Cost
0.032 824.0
* 0.028 411.0
26.&
11.5
1235.0 72.9
0.027 824.0
* 0.028 411.0
11.5
TOTALS 1235.0 7.2
AIR LEAKAGE CONTROL
Description ACH Volume UA $ Cost
C) Standard Air Sealing -above grade volume 0.330 17471.0 101.5
p> Standard Air Sealing -above grade volume 0.350 17471.0 101.5
1/88 WATTSUN
)J
rsion 4.2- L,,eirue.EN 6 .T icu,, �. ,
FILE . A: NEW_FILE. HSE
Description
i -value Area BTU/F $/sf Cost
C> Light frame construction BTU/F-ft2 fir 7.000 2316.0 6948.0
F'> Light frame construction BTU/F-ft2 fir• 7.000 7'716.0 6948.0
Actual energy use will vary with climate, lifestyle, and construction.
=eonomic and energy use estimates should be used for comparative purposes only.
SYSTEM
version `b' i
FILE . A:NEW FILE.HSE
Heating system type
Ducts
REPORT Page :
CURRENT PROPOSED
Baseboards Baseboards
Size Lgth Rval Sipe Lgth Rval
BUILDING HEAT LOSS
Envelope
Ducts
TOTALS:
CURRENT PROPOSED
564.5 BTU/hr-F 490.1 BTU/hr-F
0.0 0.0
564.5 490.1
DESIGN RESULTS CURRENT PROPOSED
'DPsi gn heat load 77257.4 LTU/hr 3:''48.5 BTU/hr
10.9 kW 9.5 kW
System size (150::' 5 , i? kB T U/hr 48.5 k:ETU/hr
16.5 kW 14.0 kW
Total Spee Heat 17419 kWh/yr 13895 kWh/yr
BASED ON THE FOLLOW:NG DESIGN CONDITIONS
WinF-er desidn wind sp=ed
Thu-rmosat met point
Winter design t:T; eratLr-e
Design temperature_ difference
15 mph
70 deo F.
4 deg F.
66 deg F.
Actual energy use will vary with climate, lifestyle, and construction.
)gnomic and energy use estimates should be used for comparative purposes only.
r
, •
5
-ropimiqt► _
149 i 2. gQo ,l,V.-
AC T I ON : S SCREEN: ENER USERID : -MSTI
BUILDING PERMIT SYSTEM ENERGY DATA COLLECTION SCREEN
JURISDICTION= PROJECT NUMBER=
8-2°74
PERMIT , i
r:l=W: REMODEL
`NERDY i_�i�;E _? WEEC: ADDITTIii`�: CH�;�l�=E 0f- ��c.`: RES/CCDM
APPROACH : RSC>IPTI` NWEC. I UTILITY . i�tic�)P SGC _ Y
i_;T...': _ 't' PfINT : rOMF i;1i_;1:. Y' EY T c:
i_r, _ .xGl:
0.07
.12.1
R-30
NI4RV INT'E62Ai p sPot-- viI-IOL I1-00S:-
SITE ADDRESS: f4112_ reopo �
OWNER NAME: f(C PHONE NO:
OWNER ADDRESS:
CONTRACTOR:
CONTRACTOR ADDRESS:
CONSTRUCTION TYPE:
OCCUPANCY GROUP:
TNSPFiTC
ENERGY CODE PLAN REVIEW
• PERMIT NO: OS - 2674
PERMIT APPLICATION DATE: 7,24 8E6
ISSUANCE DATE: '7, --2-40.0S
N WE C COMPLIANCE APPROACH: DATE APPROVED:
ValueTotal Time
(Minutes
FOUNDATION
Heated Slab
Unheated Slab
Basement
Crawlspace
FRAMING
Ceiling
Doors
Floor
Windows
Walls
Vapor Barriers
AIR-TO-AIR HEAT EXCHANGER
FIREPLACE
HOT WATER HEATER
INFILTRATION CONTROL
SPACE HEATING SYSTEM
VENTILATION
LIGHTING
ACH
General Notes: -O
Re -Revs
Minutes
COMPONENT PERFORMANCE
SYSTEMS ANALYSIS
PRESCRIPTIVE REQUIREMENTS
POINTS
PATH:
Descriptions@ / Comments
'Place.R, U, 7., as required. For Example, " R = 32 ".
@Desc'ri} planned applications to achieve performance value 'e.g. wi.ndows=dbl, 1/2 in., TIM w/storm.), or attar:
WATT -S. run.